I-90 eastbound 4th, 6th Street ramps in Austin close May 31, Cedar River closes June 3
AUSTIN, Minn. – Motorists traveling on Interstate 90 in Austin will encounter single lane traffic and eastbound off- and on-ramp detours at 4th and 6th streets beginning May 31 as the Austin I-90 bridges project progresses, according to the Minnesota Department of Transportation.
I-90 eastbound bridge resurfacing over 6th Street is scheduled for May 31 to fall 2024 and replacement of the eastbound I-90 bridge over the Cedar River will begin on June 3.
The following traffic impacts will occur:
- I-90 eastbound lanes will be closed between Oakland Avenue and Highway 218 south. I-90 traffic will be in the westbound lanes with eastbound and westbound traffic using single lanes adjacent to each other.
- I-90 eastbound off-ramp to 6th Street will be closed and detoured:
- I-90 eastbound motorists should use Exit 179 (11th Drive), take a left and use the on-ramp to I-90 westbound. Next, motorists should take Exit 178B, the 6th Street exit.
- I-90 eastbound on-ramp from 6th Street will be closed and detoured:
- Motorists should take the I-90 westbound on-ramp from 6th Street, then take Exit 177 (Highway 218 N/14th St NW), take a left and use the I-90 eastbound on-ramp to re-enter the highway.
- I-90 eastbound off-ramp to 4th Street will be closed and detoured:
- I-90 eastbound motorists should use Exit 179 (11th Drive), take a left and use the on-ramp to I-90 westbound. Next, motorists should take Exit 178A, the 4th Street exit.
- I-90 eastbound on-ramp from 4th Street will be closed and detoured:
- Motorists should take the I-90 westbound on-ramp from 4th Street, then take Exit 177 (Highway 218 N/14th Street NW), take a left and use the I-90 eastbound on-ramp to re-enter the highway.
Cedar River closure at I-90 begins June 3
People using boats, kayaks or canoes on the Cedar River in Austin should be alert that the river will be closed to watercraft at I-90 beginning Monday, June 3.
Crews will be demolishing the eastbound bridge and removing the center pier. Once the removal work is done, it will continue to be dangerous to be on the water at this site, because construction crews will be building the new pier and abutments near or in the river channel.
During the I-90 bridge replacements, that section of the Cedar River State Water Trail will be off limits to paddlers and boaters who go through that part either from the upstream side or downstream where the city has a boat ramp on Austin Mill Pond.
For people using the new canoe/kayak access below Ramsey Dam (3 river miles upstream from I-90), a small, rock access is available on Wolf Creek in Austin's Wildwood Park to get off the river. Paddlers need to turn upstream at the V-shaped confluence just north of I-90 and paddle upstream about 100 yards. Road access is on 17th Avenue Northeast, about 200 feet east of the landing.
Project background
This work is part of the three-year project that is replacing or repairing bridges at six sites along the I-90 corridor in Austin.
- Oakland Avenue West (Highway 105), replace in 2024, detours started in April
- I-90 over Sixth Street Northeast, rehabilitate in 2024-2025, detours begin May 31
- I-90 over Cedar River, replace in 2024-2025, traffic impacts begin May 31/June 3
- Fourth Street Northwest, replace in 2024-2025
- 14th Street Northwest (Highway 218 north), replace in 2026
- 21st Street Northeast (Highway 218 south), replace in 2026
To learn more about the project, visit the MnDOT project website.
Safety in work zones
Motorists should always be prepared to encounter traffic changes when approaching work zones including lane closures, lane shifts, uneven road surfaces, slow-moving heavy equipment and slow or stopped traffic. To keep everyone safe, drivers must:
- Obey posted speed limits. The fine for speeding in a work zone is $300.
- Drive undistracted. Avoid using cell phones, mobile devices, adjusting the radio – even eating –while in work zones.
- Move over. Give workers room to safely complete their work.
- Know before you go. Get real-time information about traffic and road conditions at www.511mn.org or get the free 511mn smartphone app at Google Play or the App Store.
- Be patient. Expect delays, especially during peak travel times.
- Do the zipper merge.
- Avoid making unnecessary lane changes.
- Never enter a road blocked with barriers or cones.
Stay connected, informed
- Check out other MnDOT southeast Minnesota construction projects and sign up for construction updates.
- Join the MnDOT Southeast Minnesota Facebook group and follow us on MnDOT Southeast on X.
- Sign up to receive text message and/or email alerts during significant road closures or winter weather events that affect state highways in southeast Minnesota.
- Find road updates in Minnesota on 511mn.org or get a free app at Google Play or the App Store.
- Interested in a job with MnDOT? Career information for the State of Minnesota can be found at the Minnesota Management and Budget website. Come join us.
###