Washington Street, Crow Wing County

Reconstruct, improve

The project will reconstruct and improve Hwy 210/Washington St. from Baxter Dr. to the east end of the four-lane in Brainerd in 2026 and 2027.

Summary of work

Hwy 210/Washington St.

  • Reconstruct (bridge, central, mall/railyard segments) or resurface (west and east segments) the road
  • Reconstruct curbs, gutters, raised medians and storm sewers
  • Update signal systems
  • Remove signal systems at 4th Ave. NE and Mill Ave.
  • Realign and improve access at the Hwy 210 and Hwy 25/Mill Ave., includes two roundabouts
  • Upgrade city utilities beneath the road
  • Upgrade pedestrian sidewalks and approaches and reconstruct/connect the Cuyuna Lakes Trail
  • Update the Mississippi River Bridge
Project location map
Hwy 210 project location map and general segments. Select image to enlarge

Hwy 210 segments

  • West — Baxter Dr. to the Bridge
  • Bridge — 4th St. NW to east of the Mississippi River
  • Central — Bridge to Kingwood St.
  • Mall/Railyard — Kingwood St. to 10th Ave. NE
  • East — 10th Ave. NE to Pine Shores Rd.

Work segments subject to change once more is known.

Future impacts

Hwy 210 in Brainerd
Hwy 210 Brainerd westward towards Baxter. Photo by the City of Brainerd.

Motorists: One-lane traffic, changes to access along Hwy 210, gravel surfaces, segments of detours

Pedestrians: Sidewalk closures, signed detours

More details to become available closer to construction