Minnesota Department of Transportation

511 Travel Info

Hwy 65—Cambridge to north of Braham

Includes Grandy, Isanti and Kanabec counties

2026 roadwork

Resurface and update over 10 miles of Hwy 65 from south of 357th Ave. NE at the end of four-lane in Cambridge to south of Kanabec Co. Rd. 45/120th Ave. north of Braham, includes drainage and sidewalks in Grandy. 2026 traffic plans: work will be done in segments and require detours.

Hwy 65 work location map between Braham and Cambridge
Hwy 65 work Cambridge to north of Braham. Select PNG image to enlarge

Work

  • Resurface 10 miles of road surface (cold-in-place recycle*)
  • Add northbound left turn lane on Hwy 65 at 357th Ave. NE north of Cambridge
  • Replace pipes and box culverts at multiple locations under Hwy 65
  • Update or repair guardrail
  • Add Hwy 65 intersection lighting at:
    • Isanti Co. Rd. 6 and Co. Rd. 4
    • Kanabec Co. Rd. 4 and Co. Rd. 16 
  • Install centerline/shoulder mumble strips and paint new pavement marking
  • Make any other necessary repairs

Grandy

  • Resurface road
  • Replace underground storm sewer
  • Upgrade pedestrian sidewalks
  • Extend center left-turn lane

What is cold-in-place recycle*

This road surface treatment and equipment is being used on this project. The process involves a convoy of equipment to finish a road surface, including tankers that hold emulsion material and water, milling or crushing and recycling machines, pavers and rollers.

Future work segments, impacts

Spring-fall 2026

Crews will work on two segments of Hwy 65—north or south of Isanti Co. Rd. 3 near Stanchfield. Motorists can expect lane or road closures with detours, no shoulders and one-way traffic, at times.

The project focuses on two work tasks: 1) Replace or repair underground pipes, update the road or accesses and sidewalks. 2) Revive the road surface (cold-in-place recycle*).

Hwy 65 work location map between Braham and Cambridge
Hwy 65 traffic plan of detours, one-way traffic from Cambridge to north of Braham. Select PNG image to enlarge

Schedule at a glance

Table: Tentative work, schedule and detour plans.

Time
Hwy 65
Work
Impacts
Spring-fall 2026 Mora to Cambridge All
  • Truck route (PNG) via Hwy 23 south of Mora to Hwy 47 Ogilvie to Hwy 95 Pine Brook to Cambridge or seek other route to avoid delays

 

2026

North segment: Stanchfield to Brunswick

 

Replace/repair pipes north of Co. Rd. 3

2026

South segment: Stanchfield to Cambridge

Replace/repair pipes south of Co. Rd. 3, widen road to add turn lanes and update sidewalks in Grady
2026 South segment: Stanchfield to Cambridge Road surface
  • Northbound Hwy 65: Detour (PNG) via Co. Rd. 30 Cambridge, Co. Rd. 34, Co. Rd. 36 and Co. Rd. 3 Stanchfield.
  • Southbound Hwy 65: One-way traffic between Co. Rd. 3 Stanchfield and Co. Rd. 30 Cambridge
2026 North segment: Stanchfield to Brunswick Road surface
  • Northbound Hwy 65: One-way traffic north of Co. Rd. 3
  • Southbound Hwy 65: Detour via Kanabec Co. Rd. 16, Co. Rd. 14/4 and Co. Rd. 3

Local access

Hwy 65 will be maintained to those who live, work or visit those within the closed work zone; however, hard closures will be necessary at times to work under the road. Enter/exit nearest your destination, use alternate entrances or back streets.

For east (Braham) or west (Grady) access follow road signs to/from Co. Rd. 3 and Hwy 65.

Construction plans are tentative and subject to change. More details available once a contractor is on board.