This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.
Traffic impacts
I-94 and I-394 project location map.
All traffic impacts are tentative and weather dependent.
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane and ramp closures during construction. Motorists should be aware that some nearby construction projects will have overlapping traffic impacts with the I-394/I-94 Minneapolis work.
Road closures
Mid-February through fall 2026
- Penn Ave. bridge over I-394 is closed
Mid-February
- Weekend I-394 is closed in both directions between downtown Minneapolis and Hwy 100
- Detour: Hwy 169 to I-694 to I-94
Lane closures
Early February through summer 2026
- Westbound I-394 is reduced to two lanes of traffic between downtown Minneapolis and Hwy 100
- Westbound I-394 traffic will be shifted into the E-ZPass lanes
Ramp closures
Early February through summer 2026
- Eastbound I-94 ramp to westbound I-394
- Westbound I-394 ramp to/from Penn Ave.
- Westbound I-394 to Park Place Blvd./Xenia Ave.
- Detour: Louisiana Ave.
Construction schedule
February 2026 to summer 2026
- Westbound I-394 will be reduced to two lanes using E-ZPass lanes between downtown Minneapolis and Hwy 100
- The Penn Ave. bridge will be closed
Summer 2026 to fall 2026
- Eastbound I-394 is reduced to two lanes using E-ZPass lanes between downtown Minneapolis and Hwy 100
- The Penn Ave. bridge will be closed
About this project
In July 2025, we began repairing bridges and ramps along I-394 and I-94 between downtown Minneapolis and Hwy 100. This project includes maintenance to the Dunwoody Blvd. ramp, replacing the deck for the Penn Ave. bridge that crosses over I-394, and other improvements along I-394 between downtown Minneapolis and Hwy 100. This work is expected to last through fall 2026.
Summary of work
- Repair 34 bridges and ramps along I-394 and I-94, including the Penn Ave. bridge, the I-394 bridges over I-94 and Dunwoody Blvd. and ramps at the I-94/I-394 interchange
- Realign the I-394 to Dunwoody Blvd. ramp
- Replace the deck on part of the Dunwoody Blvd. bridge
- Replace bridge joints, repair pavement, and improve drainage at various locations in the project area
- Replace the Penn Ave. bridge deck
- Accessibility, lighting, and sidewalk improvements at Dunwoody Blvd.
- Accessibility and sidewalk improvements at Penn Ave.
