National Highway System pavement projects
MnDOT District 1
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What's was selected
Related links
- District 1 project selection
- District 1 Non-National Highway System pavement projects
- District 1 Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.
Last updated November 2024
Score | Route | Year Planned (FY) | Description | High Level Cost Estimate for Planning Purposes | Comments |
96 | I35 | 2029-2033 | Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 and replace four bridges | $32,000,000 | 6982-359 |
95 | I35 | 2028 | Resurface I-35 under the 5th Ave W bridge and from Hwy 23 to 50th Ave W in Duluth | $1,400,000 | 0906-50 |
92 | Hwy 61 | 2026-2027 | On London Rd in Duluth, from 26 Ave E. to just north of. 60th Ave. E., construct roundabout at 26th and 40th Ave. E., resurface pavement and install trail and on Interstate 35 South Bound at 21st Ave E. install freeway closure gates. | $20,200,000 | 6925-145 |
92 | Hwy 73 | 2034 | In Chisholm reconstruct State Highway 73 from Jct US169 to 4th Ave NW | $9,264,000 | 6930-43 |
92 | US169 | 2031 | Resurface Hwy 169 from 13th St SW to Hwy 2 in Grand Rapids | $3,666,000 | 3115-131 |
92 | US169 | 2033 | Resurface Hwy 169 from east Jct Hwy 2 in Grand Rapids to just west of Elizabeth Ave in Coleraine | $11,252,000 | 3116-155 |
91 | I535 | 2030 | Reconstruct Interstate 535 between Twin Ports Interchange and Garfield Interchange in Duluth | $5,300,000 | 6980-63 |
88 | I35 | 2025 | Northbound and Southbound I-35 in Duluth Repair concrete pavement and interchange ramps from Lake Ave to 0.7 miles South of 21st Ave E. | $2,235,226 | 6929-24 |
88 | Hwy 61 | 2027-2028 | Hwy 61 from 2.6 miles north County Rd 6 to 0.20 mi. North Leveaux Ridge Rd. Resurface Pavement | $8,500,000 | 1601-66 |
88 | US53 | Not Selected | Resurface Hwy 53 from just north of wayside rest to the Rice River bridge | $7,100,000 | Cost is greater than available budget |
84 | US2 | Not Selected | Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW | $3,000,000 | Waiting to avoid simultaneous or multiple years of detours in the same area |
83 | US169 | Not Selected | Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73 | $6,740,000 | Crack sealed in 2022; Cost is greater than available budget. |
82 | Hwy 33 | Not Selected | Resurface Hwy 33 from just north of Carlton County Road 116 to 1.5 miles south of Hwy 2 | $5,270,000 | Chip sealed in 2022 |
82 | Hwy 61 | 2029 | Resurface NB Hwy 61 from CR 33 (McQuade Rd) to CR 42 (Homestead Rd) and SB Hwy 61 from CR 33 (McQuade Rd) to Knife River | $8,500,000 | 6926-56 |
82 | US169 | 2031 | Resurface Hwy 169 from CR 64 (Harristown Rd) to 13th St SW in Grand Rapids | $4,934,000 | 3115-129 |
82 | US53 | Not Selected | Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge | $4,580,000 | Cost is greater than available budget |
81 | US169 | Not Selected | Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92 | $1,110,000 | District does not expect pavement segment(s) to deteriorate as fast as model predicts. |
81 | US53 | 2028 | Resurface Hwy 53/Trinity Rd from just north of Piedmont Ave to Hwy 194/Central Entrance in Duluth | $4,230,000 | 0905-56 |
80 | Hwy 33 | Not Selected | Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge | $2,990,000 | Chip sealed in 2022 |
78 | I35 | 2029 | Resurface I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 | $2,000,000 | 6982-366 |
78 | Hwy 61 | 2030 | Resurface Hwy 61 from just south of CR 14 to Reservation Bay Rd and resurface bridges over Flute Reed River and Brule River | $16,913,000 | 1603-54 |
78 | Hwy 61 | 2029 | Resurface Hwy 61 from just north of 60th Ave E to just north of N. Superior St. | $1,060,000 | 6925-147 |
77 | I35 | 2033 | Resurface I-35 from 2.6 miles south of CR 4 to the north end of the Hwy 210 bridge | $16,485,000 | 0980-168 |
77 | I35 | Not Selected | Resurface I-35 from north of tunnel to Hwy 61/London Rd | $1,590,000 | NA |
76 | US53 | Not Selected | Resurface Hwy 53 from just south of Cook to south limits of Cook | $170,000 | NA |
75 | Hwy 33 | Not Selected | Resurface Hwy 33 from I-35 to roundabout | $250,000 | NA |
75 | US71 | Not Selected | Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W | $40,000 | NA |
74 | Hwy 210 | Not Selected | Resurface Hwy 210 from railroad bridge to just east of I-35 | $9,770,000 | NA |
73 | Hwy 23 | 2034 | Resurface Hwy 23 from Hwy 107 to I-35 | $5,715,000 | 5801-1039097 |
73 | US2 | 2031 | Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd in Cohasset | $2,974,000 | 3103-72 |
73 | US53 | 2034 | Resurface NB Hwy 53 from CR 13 to 1.6 miles north of Hwy 33 | $24,070,000 | 6916-116 |
72 | US169 | Not Selected | Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5 | $1,760,000 | Crack sealed in 2022 |
70 | Hwy 61 | 2027 | Repair Highway 61 in locations between Two Harbors and just south of CR 5 in Silver Bay | $2,150,000 | 3804-64 |
70 | US53 | Not Selected | Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road 901 | $26,530,000 | NA |
69 | US169 | Not Selected | Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53 | $600,000 | NA |
69 | US2 | Not Selected | Resurface Hwy 2 from 5th St SW to just east of Deer River | $200,000 | NA |
68 | Hwy 11 | Not Selected | Resurface Hwy 11 from Hwy 71 to just east of Hwy 71 | $100,000 | NA |
68 | Hwy 33 | 2034 | Resurface Hwy 33 from just north of Witte Rd to Hwy 53 | $15,035,000 | 6911-1124107 |
68 | Hwy 61 | 2030 | Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89 | $2,582,000 | 1602-54 |
68 | Hwy 61 | Not Selected | Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek | $1,940,000 | NA |
68 | US169 | 2032 | Resurface Hwy 169 from just south of the Aitkin/Itasca County line to CR 64 (Harristown Rd) | $13,300,000 | 3115-128 |
67 | Hwy 61 | 2029 | Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just north of Crow Creek to just north of Gooseberry River | $2,886,000 | 3805-111 |
67 | Hwy 61 | 2032 | Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River and 1.3 miles north of CR 22 to Beaver Bay Bridge | $3,957,000 | 3806-72 |
65 | I35 | 2028 | Repair I-35 concrete in locations between north of Hinckley to Hwy 53 and General Andrews and Kettle River rest area pavement repair. | $4,000,000 | 8821-347 |
65 | US53 | Not Selected | Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB | $100,000 | NA |
62 | US53 | Not Selected | Resurface Hwy 53 from south limits of Cook to Little Fork River bridge | $770,000 | NA |
61 | Hwy 33 | Not Selected | Resurface Hwy 33 from railroad bridge to Hwy 53 | $10,160,000 | Chip sealed in 2022 |
58 | Hwy 61 | Not Selected | Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367 | $1,780,000 | NA |
46 | I35 | 2030-2031 | Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge | $11,000,000 | 0980-166 |
46 | US2 | Not Selected | Resurface Hwy 2 from north end of grass median to I-35 | $90,000 | NA |
41 | Hwy 194 | Not Selected | Resurface Hwy 194 from just north of Mesaba Ave to Superior St | $1,240,000 | NA |
41 | Hwy 33 | Not Selected | Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave | $690,000 | NA |
39 | US53 | 2031 | Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge | $6,332,000 | 6920-57 |
30 | US53 | Not Selected | Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52 | $2,560,000 | NA |
27 | Hwy 61 | Not Selected | Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1 | $2,070,000 | NA |
25 | US53 | Not Selected | Resurface Hwy 53 from 4th St to just north of Piedmont Ave | $580,000 | NA |
Previous years
Score | Route | Year Planned (FY) | Description | High Level Cost Estimate for Planning Purposes | Comments |
96 | I35 | 2029-2031 | Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 and replace bridges | $36,230,000 | NA |
95 | I35 | 2028 | Resurface I-35 under the 5th Ave W bridge and from Hwy 23 to 50th Ave W in Duluth | $1,350,000 | 6982-344 |
92 | Hwy 61 | 2025 | On London Rd (Hwy 61), in Duluth, from 26 Ave E. to just north of. 60th Ave. E., construct roundabout at 26th and 40th Ave. E and 60th Ave E.., resurface pavement and install trail. | $20,000,000 | 6925-145; 118-166-004 |
92 | US169 | 2030 | Resurface Hwy 169 from 13th St SW to Hwy 2 in Grand Rapids | $3,525,000 | 3115-131 |
92 | US169 | 2033 | Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine | $11,252,000 | 3116-155 |
91 | I535 | Not Selected | Resurface I-535 from railroad bridge to Jct I-35/Hwy 53 | $730,000 | Partially covered by Twin Ports Interchange project |
88 | I35 | 2025 | Northbound and Southbound I-35 in Duluth Repair concrete pavement and interchange ramps from Lake Ave to 0.7 miles South of 21st Ave E. | $3,165,000 | 6982-336; 6982-336BFP |
88 | Hwy 61 | 2027 | Hwy 61 from 2.6 miles north County Rd 6 to 0.20 mi. North Leveaux Ridge Rd. Resurface Pavement | $8,500,000 | 1601-66 |
88 | US53 | Not Selected | Resurface Hwy 53 from just north of wayside rest to the Rice River bridge | $7,100,000 | Cost is greater than available budget |
87 | US53 | 2024 | Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections | $5,500,000 | 6918-102 |
85 | US169 | 2024 | Resurface northbound Hwy 169 from just west of CR 67 to CR 103 and southbound Hwy 169 from just north of CR 5 to just south of CR 103 and rehabilitate 3 bridges & pedestrian accessibility improvements and sidewalk improvements along Emerald Avenue from US 169 to Enterprise Drive South in Mt Iron . | $62,500 | 6935-94; 069-596-017 |
84 | US2 | Not Selected | Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW | $3,000,000 | Waiting to avoid simultaneous or multiple years of detours in the same area |
83 | US169 | Not Selected | Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73 | $6,740,000 | Crack sealed in 2022; Cost is greater than available budget. |
83 | US53 | 2025 | Resurface Hwy 53 in Eveleth from Hwy 37 to Vermillion Dr | $3,000,000 | 6918-100 |
82 | Hwy 33 | Not Selected | Resurface Hwy 33 from just north of Carlton County Road 116 to 1.5 miles south of Hwy 2 | $5,270,000 | Chip sealed in 2022 |
82 | Hwy 61 | 2029 | Resurface NB Hwy 61 from CR 33 (McQuade Rd) to CR 42 (Homestead Rd) and SB Hwy 61 from CR 33 (McQuade Rd) to Knife River | $8,500,000 | 6926-56 |
82 | US169 | 2030 | Resurface Hwy 169 from CR 64 (Harristown Rd) to 13th St SW in Grand Rapids | $4,744,000 | 3115-129 |
82 | US53 | Not Selected | Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge | $4,580,000 | Cost is greater than available budget |
81 | US169 | Not Selected | Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92 | $1,110,000 | District does not expect pavement segment(s) to deteriorate as fast as model predicts. |
81 | US53 | 2028 | Resurface Hwy 53/Trinity Rd from just north of Piedmont Ave to Hwy 194/Central Entrance in Duluth | $4,230,000 | 6915-139 |
80 | Hwy 33 | Not Selected | Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge | $2,990,000 | Chip sealed in 2022 |
78 | Hwy 61 | 2030 | Resurface Hwy 61 from just south of CR 14 to Reservation Bay Rd |
$15,713,000 | 1603-54 |
78 | Hwy 61 | 2029 | Resurface Hwy 61 from just north of 60th Ave E to just north of N. Superior St. |
$1,060,000 | 6925-147 |
77 | I35 | Not Selected | Resurface I-35 from north of tunnel to Hwy 61/London Rd | $1,590,000 | NA |
77 | I35 | 2033 | Resurface I-35 from 2.6 miles south of CR 4 to the north end of the Hwy 210 bridge | $18,648,000 | 0980-168 |
77 | Hwy 61 | 2024 | Two Harbors Expressway,Highway 61 North and South Bound In Duluth 0.12 miles North of Superior St to CR33/Mcquade. Resurface roadway | $3,200,000 | 6925-144 |
77 | US2 | 2033 | Resurface Hwy 2 from .25 miles east of Hwy 73 to just east of CR 845/Maki Rd | $14,627,000 | 6907-54 |
77 | US2 | 2024 | State Highway 2 from State Highway 200 to 0.25 mi. west of county rd. 30. Pavement resurfacing | $3,900,000 | 6906-19 |
76 | US53 | Not Selected | Resurface Hwy 53 from just south of Cook to south limits of Cook | $170,000 | NA |
75 | I535 | Not Selected | Resurface I-535 from Blatnik bridge to railroad bridge | $360,000 | NA |
75 | Hwy 33 | Not Selected | Resurface Hwy 33 from I-35 to roundabout | $250,000 | NA |
75 | US169 | Not Selected | Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW | $3,160,000 | NA |
75 | US71 | Not Selected | Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W | $40,000 | NA |
74 | Hwy 210 | Not Selected | Resurface Hwy 210 from railroad bridge to just east of I-35 | $9,770,000 | NA |
73 | US2 | 2031 | Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd in Cohasset | $2,974,159 | 3103-72 |
72 | US169 | Not Selected | Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5 | $1,760,000 | Crack sealed in 2022 |
70 | Hwy 61 | 2027 | Repair Highway 61 in locations between Two Harbors and just south of CR 5 in Silver Bay | $2,150,000 | 3804-64 |
70 | US53 | Not Selected | Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road 901 | $26,530,000 | NA |
69 | US169 | Not Selected | Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53 | $600,000 | NA |
69 | US2 | Not Selected | Resurface Hwy 2 from 5th St SW to just east of Deer River | $200,000 | NA |
68 | Hwy 11 | Not Selected | Resurface Hwy 11 from Hwy 71 to just east of Hwy 71 | $100,000 | NA |
68 | Hwy 61 | 2032 | Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89 |
$2,582,000 | 1602-54 |
68 | Hwy 61 | Not Selected | Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek | $1,940,000 | NA |
68 | US169 | 2032-2033 | Resurface Hwy 169 from just south of the Aitkin/Itasca County line to CR 64 (Harristown Rd) | $14,218,230 | 3115-128 |
67 | Hwy 61 | 2029 | Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just north of Crow Creek to just north of Gooseberry River | $2,886,000 | 3805-111 |
67 | Hwy 61 | 2032 | Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River and 1.3 miles north of CR 22 to Beaver Bay Bridge | $3,957,000 | 3806-72 |
65 | I35 | 2028 | Repair I-35 concrete in locations between north of Hinckley to Hwy 53 | $2,500,000 | 5880-203 |
65 | US53 | Not Selected | Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB | $100,000 | NA |
62 | US53 | Not Selected | Resurface Hwy 53 from south limits of Cook to Little Fork River bridge | $770,000 | NA |
61 | Hwy 33 | Not Selected | Resurface Hwy 33 from railroad bridge to Hwy 53 | $10,160,000 | Chip sealed in 2022 |
60 | US2 | 2028 | Resurface Hwy 2 from just east of Hwy 200 to west limits of Floodwood | $8,939,000 | 6906-19 |
58 | Hwy 61 | Not Selected | Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367 | $1,780,000 | NA |
46 | I35 | 2029 | Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge |
$6,219,000 | 0980-166 |
46 | US2 | Not Selected | Resurface Hwy 2 from north end of grass median to I-35 | $90,000 | NA |
41 | Hwy 194 | Not Selected | Resurface Hwy 194 from just north of Mesaba Ave to Superior St | $1,240,000 | NA |
41 | Hwy 33 | Not Selected | Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave | $690,000 | NA |
39 | US53 | 2031 | Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge | $6,332,000 | 6920-57 |
34 | Hwy 61 | 2031 | Reconstruct Hwy 61 from just southwest of CR 61 to just east of CR 26 in Two Harbors | $8,935,000 | 3804-1112183, scored as urban project |
30 | US53 | Not Selected | Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52 | $2,560,000 | NA |
27 | Hwy 61 | Not Selected | Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1 | $2,070,000 | NA |
25 | US53 | Not Selected | Resurface Hwy 53 from 4th St to just north of Piedmont Ave | $580,000 | NA |
View more detailed scores (Excel).
Last updated October 2022
Score | Route | Year Planned (FY) | Description | High Level Cost Estimate for Planning Purposes | Comments |
96 | I35 | 2029-2031 | Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 | $285,000,000 | 6982-1072803 |
95 | I35 | 2028 | Resurface I-35 under the 5th Ave W bridge and from Hwy 23 to 50th Ave W in Duluth | $1,350,000 | 6982-344 |
92 | Hwy 61 | 2025 | On State Highway 61, in Duluth, from 26 Ave E. to just north of. 60th Ave. E., construct roundabout at 26th , 40th & 60th Ave. E., resurface pavement and install trail. | $14,153,469 | 6925-145 |
92 | US169 | 2030 | Resurface Hwy 169 from 13th St SW to Hwy 2 | $3,000,000 | 3115-1038336 |
92 | US169 | 2032 | Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine | $10,361,000 | 3116-155 |
91 | I535 | Not Selected | Resurface I-535 from railroad bridge to Jct I-35/Hwy 53 | $730,000 | Partially covered by Twin Ports Interchange project |
88 | I35 | 2025 | Northbound and Southbound I-35 in Duluth Repair concrete pavement and interchange ramps from Lake Ave to 0.7 miles South of 21st Ave E. | $1,900,000 | 6982-336 |
88 | US53 | 2031 | Resurface Hwy 53 NB from north of Swan Lake Rd to just south of Cemetery Rd | $9,795,000 | 6917-140 |
88 | US53 | Not Selected | Resurface Hwy 53 from just north of wayside rest to the Rice River bridge | $7,100,000 | Cost is greater than available budget |
87 | US53 | 2024 | Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections | $7,475,000 | 6918-102 |
85 | US169 | 2024 | Resurface northbound Hwy 169 from just west of CR 67 to CR 109 and southbound Hwy 169 from just north of CR 5 to just south of CR 109 and rehabilitate 3 bridges . | $17,900,000 | 6935-94 |
84 | US2 | Not Selected | Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW | $3,000,000 | Waiting to avoid simultaneous or multiple years of detours in the same area |
83 | US169 | Not Selected | Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73 | $6,740,000 | Crack sealed in 2022; Cost is greater than available budget. |
83 | US53 | 2024 | Resurface Hwy 53 from Hwy 37 to Vermillion Dr | $2,944,000 | 6918-100 |
82 | Hwy 33 | Not Selected | Resurface Hwy 33 from just north of Carlton County Road 116 to 1.5 miles south of Hwy 2 | $5,270,000 | Chip sealed in 2022 |
82 | Hwy 61 | 2028 | Resurface NB Hwy 61 from CR 33 (McQuade Rd) to CR 42 (Homestead Rd) and SB Hwy 61 from CR 33 (McQuade Rd) to Knife River | $6,089,000 | 6926-56 |
82 | US169 | 2028 | Resurface Hwy 169 from CR 97/Crystal Springs Rd to 13th St SW in Grand Rapids | $4,000,000 | 3115-129 |
82 | US53 | Not Selected | Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge | $4,580,000 | Cost is greater than available budget |
81 | Hwy 61 | 2031 | Resurface Hwy 61 from 2.6 miles north CR 6 to 1.4 Miles south of CR 79 | $10,015,000 | 1601-66 |
81 | US169 | Not Selected | Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92 | $1,110,000 | District does not expect pavement segment(s) to deteriorate as fast as model predicts. |
81 | US53 | 2028 | Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr | $4,230,000 | 6915-139 |
80 | Hwy 33 | Not Selected | Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge | $2,990,000 | Chip sealed in 2022 |
80 | US53 | 2029 | Resurface NB Hwy 53 from 1.1 miles south of CR 52 to Bridge 69019 | $2,058,000 | 6917-1038383 |
78 | Hwy 61 | 2028 | Resurface Hwy 61 from just south of CR 14 to Reservation Bay Rd | $14,573,000 | 1603-54 |
78 | Hwy 61 | 2028 | Resurface Hwy 61 from just north of 60th Ave E to just north of Superior St | $1,060,000 | 6925-147 |
77 | I35 | Not Selected | Resurface I-35 from north of tunnel to Hwy 61/London Rd | $1,590,000 | NA |
77 | Hwy 61 | 2024 | Highway 61 North and South Bound In Duluth 0.12 miles North of Superior St to County Rd 33/Mcquade. Resurface roadway | $3,100,000 | 6925-144 |
77 | US2 | Not Selected | Resurface Hwy 2 from just west of Floodwood to St Louis County Road 845 | $9,050,000 | NA |
76 | US53 | Not Selected | Resurface Hwy 53 from just south of Cook to south limits of Cook | $170,000 | NA |
75 | I535 | Not Selected | Resurface I-535 from Blatnik bridge to railroad bridge | $360,000 | NA |
75 | Hwy 33 | Not Selected | Resurface Hwy 33 from I-35 to roundabout | $250,000 | NA |
75 | US169 | Not Selected | Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW | $3,160,000 | NA |
75 | US71 | Not Selected | Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W | $40,000 | NA |
74 | Hwy 210 | Not Selected | Resurface Hwy 210 from railroad bridge to just east of I-35 | $9,770,000 | NA |
73 | Hwy 23 | 2030 | Resurface Hwy 23 from Hwy 107 to I-35 | $5,292,000 | 5801-1039097 |
73 | US2 | 2030 | Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd | $2,684,000 | 3103-1038975 |
73 | US53 | 2032 | Resurface NB Hwy 53 from CR 13 to 1.6 miles north of Hwy 33 | $21,974,000 | 6916-116 |
72 | US169 | Not Selected | Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5 | $1,760,000 | Crack sealed in 2022 |
71 | US2 | Not Selected | Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood | $6,670,000 | NA |
70 | Hwy 61 | 2027 | Repair Highway 61 in locations between Two Harbors and just south of CR 5 in Silver Bay | $1,945,000 | 3804-64 |
70 | US53 | Not Selected | Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road 901 | $26,530,000 | NA |
69 | US169 | Not Selected | Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53 | $600,000 | NA |
69 | US2 | Not Selected | Resurface Hwy 2 from 5th St SW to just east of Deer River | $200,000 | NA |
68 | Hwy 11 | Not Selected | Resurface Hwy 11 from Hwy 71 to just east of Hwy 71 | $100,000 | NA |
68 | Hwy 61 | 2032 | Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89 | $2,582,000 | 1602-54 |
68 | Hwy 61 | Not Selected | Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek | $1,940,000 | NA |
68 | US169 | 2027 | Resurface Hwy 169 from just south of the Aitkin/Itasca County line to CR 437 | $9,477,000 | 3115-128 |
67 | Hwy 61 | 2029 | Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just north of Crow Creek to just north of Gooseberry River | $2,886,000 | 3805-111 |
67 | Hwy 61 | 2032 | Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River and 1.3 miles north of CR 22 to Beaver Bay Bridge | $3,957,000 | 3806-72 |
65 | I35 | 2028 | Repair I-35 concrete in locations between north of Hinckley to Hwy 53 | $2,500,000 | 5880-203 |
65 | US53 | Not Selected | Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB | $100,000 | NA |
62 | US53 | Not Selected | Resurface Hwy 53 from south limits of Cook to Little Fork River bridge | $770,000 | NA |
61 | Hwy 33 | Not Selected | Resurface Hwy 33 from railroad bridge to Hwy 53 | $10,160,000 | Chip sealed in 2022 |
60 | US2 | 2023 | Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements | $6,600,000 | 3104-62 Selected prior to policy (in 2019-2022 STIP); |
58 | Hwy 61 | Not Selected | Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367 | $1,780,000 | NA |
58 | US2 | 2023 | Resurface US 2 from just west of CR 874 to Hwy 194 and construct a roundabout at US 2/Hwy 194 | $3,744,750 | 6908-61 |
46 | I35 | 2029 | Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge | $6,219,000 | 0980-1038133 |
46 | US2 | Not Selected | Resurface Hwy 2 from north end of grass median to I-35 | $90,000 | NA |
41 | Hwy 194 | Not Selected | Resurface Hwy 194 from just north of Mesaba Ave to Superior St | $1,240,000 | NA |
41 | Hwy 33 | Not Selected | Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave | $690,000 | NA |
39 | US53 | 2031 | Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge | $6,332,000 | 6920-57 |
30 | US53 | Not Selected | Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52 | $2,560,000 | NA |
27 | Hwy 61 | Not Selected | Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1 | $2,070,000 | NA |
25 | US53 | Not Selected | Resurface Hwy 53 from 4th St to just north of Piedmont Ave | $580,000 | NA |
View more detailed scores (Excel).
Last updated October 2021
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
96 | I35 | Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 | $28,550,000 | 2029 | 6982-1072803; interim project in 2021 (6982-318) |
95 | I35 | In Duluth Resurface I-35 under the 5th Ave W bridge & from Highway 23 to 50th | $1,350,000 | 2028 | 6982-344 |
92 | Hwy 61 | Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E., Pavement Resurface, Trail | $833,000 | 2025 | Listed as one project in STIP; 6925-145 |
92 | US169 | Resurface Hwy 169 from 13th St SW to Hwy 2 | $3,000,000 | 2030 | 3115-1038336 |
92 | US169 | Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine | $8,330,000 | 2028 | 3115-1037792 |
91 | I535 | Resurface I-535 from railroad bridge to Jct I-35/Hwy 53 | $730,000 | Not Selected | Partially covered by Twin Ports Interchange project |
88 | US53 | Resurface Hwy 53 from just north of wayside rest to the Rice River bridge | $7,100,000 | Not Selected | Cost is greater than available budget |
88 | I35 | Repair concrete pavement & storm sewer repair on NB and SB I-35 in Duluth from 5th Ave to 0.7 Miles South 21st ave East | $2,600,000 | 2024 | 6982-336 |
87 | US53 | Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections | $7,480,000 | 2027 | Project includes ramps; 6918-102/6919-19 |
85 | US169 | Resurface North Bound Hwy 169 from .4 miles West of County Road 67 to County Road 109 & South Bound Hwy 169 from just North of County Road 5 to just South of County Road 109 | $16,900,000 | 2024 | 6935-94 |
84 | US2 | Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW | $3,000,000 | Not Selected | Waiting to avoid simultaneous or multiple years of detours in the same area |
83 | US169 | Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73 | $6,740,000 | Not Selected | Cost is greater than available budget |
83 | US53 | Resurface Hwy 53 from Hwy 37 to Vermillion Dr | $2,950,000 | 2027 | 6918-100 |
82 | US53 | Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge | $4,580,000 | Not Selected | Cost is greater than available budget |
82 | Hwy 33 | Resurface Hwy 33 from just north of Carlton County Road 116 to 1.5 miles south of Hwy 2 | $5,270,000 | Not Selected | Preventive maintenance planned for 2022 to improve/extend life until later programming |
82 | Hwy 61 | Resurface NB Hwy 61 from Saint Louis County Road 33 (McQuade Rd) to St. Louis County Road 42 (Homestead Rd) and SB Hwy 61 from St. Louis County Road 33 (McQuade Rd) to Knife River | $6,090,000 | 2028 | 6926-56 |
81 | Hwy 61 | Resurface Hwy 61 from 2.6 miles north of Lake County Rd 6 to 1.4 Miles south of Cook County Road 79 | $1,020,000 | 2031 | 1601-66 |
81 | US53 | Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr | $4,230,000 | 2028 | 6915-1038826 |
81 | US169 | Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92 | $1,110,000 | Not Selected | District does not expect pavement segment(s) to deteriorate as fast as model predicts. |
81 | Hwy 11 | Resurface Hwy 11 from just west of Koochiching County Road 332 to 6th Ave W in International Falls | $5,120,000 | 2028 | Scored as urban pavement; 3605-43 |
80 | US2 | Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 | $3,770,000 | 2028 | Scored as urban pavement; 3103-1037794 |
80 | Hwy 33 | Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge | $2,990,000 | Not Selected | Preventive maintenance planned for 2022 to improve/extend life until later programming |
80 | US53 | Resurface NB Hwy 53 from 1.1 miles south of Saint Louis County Road 52 to Bridge 69019 | $2,070,000 | 2029 | 6917-1038383 |
78 | Hwy 61 | Resurface Hwy 61 from 60th Ave E to Brighton Beach Rd; Resurface Hwy 61 from just north of Brighton Beach Rd to just north of Superior St | $1,060,000 | 2028 | Listed as two projects in the CHIP; 6925-1037834 and 6925-1038655 |
78 | Hwy 61 | Resurface Hwy 61 from just south of Cook County Road 14 to Reservation Bay Rd | $14,850,000 | 2028 | 1603-54 |
77 | Hwy 61 | Resurface roadway from 0.3 miles North of Superior St to St. Louis County Road 33/Mcquade. |
$2,800,000 | 2024 | 6925-144 |
77 | US2 | Resurface Hwy 2 from just west of Floodwood to St Louis County Road 845 | $9,050,000 | Not Selected | NA |
77 | I35 | Resurface I-35 from north of tunnel to Hwy 61/London Rd | $1,590,000 | Not Selected | NA |
76 | US53 | Resurface Hwy 53 from just south of Cook to south limits of Cook | $170,000 | Not Selected | NA |
75 | US2 | Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor | $10,800,000 | 2026 | Scored as urban pavement; 6908-68 |
75 | US169 | Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW | $3,160,000 | Not Selected | NA |
75 | I535 | Resurface I-535 from Blatnik bridge to railroad bridge | $360,000 | Not Selected | NA |
75 | Hwy 33 | Resurface Hwy 33 from I-35 to roundabout | $250,000 | Not Selected | NA |
75 | US71 | Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W | $40,000 | Not Selected | NA |
74 | Hwy 210 | Resurface Hwy 210 from railroad bridge to just east of I-35 | $9,770,000 | Not Selected | NA |
73 | Hwy 61 | Resurface Hwy 61 from 1.3 miles north of Lake County Road 22 to Mary St | $1,650,000 | 2030 | 3806-1038873 |
73 | US2 | Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd | $2,690,000 | 2030 | Selected prior to policy (in 2019-2028 CHIP); 3103-1038975 |
73 | US53 | Resurface NB Hwy 53 from Saint Louis County Road 13 to 1.6 miles north of Hwy 33 | $21,000,000 | 2031 | 6916-166 |
73 | Hwy 33 | Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet | $840,000 | 2029 | Scored as urban pavement; 0906-1038528 |
73 | Hwy 23 | Resurface Hwy 23 from Hwy 107 to I-35 | $4,900,000 | 2030 | 5801-1039097 |
72 | Hwy 61 | Realign and replace the Silver Creek Bridge and approaches in Lake County |
$6,860,000 | 2022 | Bridge project; 3805-79 (tied to 3805-99) |
72 | US169 | Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5 | $1,760,000 | Not Selected | NA |
71 | US2 | Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood | $6,670,000 | Not Selected | NA |
71 | Hwy 194 | Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth | $14,400,000 | 2026 | Scored as urban pavement; 6933-99 |
70 | Hwy 61 | Repair Highway 61 in locations between Two Harbors and just south of Lake County Road 5 in Silver Bay | $1,950,000 | 2027 | 3804-1090403 |
70 | US53 | Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road 901 | $26,530,000 | Not Selected | NA |
69 | US2 | Resurface Hwy 2 from 5th St SW to just east of Deer River | $200,000 | Not Selected | NA |
69 | US169 | Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53 | $600,000 | Not Selected | NA |
68 | Hwy 61 | Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek | $1,940,000 | Not Selected | NA |
68 | US2 | Resurface EB and WB Hwy 2 in Grand Rapids to just east of La Prairie Ave |
$3,310,000 | 2024 | Scored as urban pavement; 3104-61 |
68 | Hwy 11 | Resurface Hwy 11 from Hwy 71 to just east of Hwy 71 | $100,000 | Not Selected | NA |
68 | US169 | Resurface Hwy 169 from just south of the Aitkin/Itasca County line to Itasca County Road 437 | $9,480,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP); 3115-128 |
68 | Hwy 61 | Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89 | $2,360,000 | 2030 | District anticipates the pavement condition will deteriorate faster than the model is projecting 1602-1038215 |
67 | Hwy 61 | Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just south of CR 1 to just north of Gooseberry River | $1,060,000 | 2028 | Ongoing maintenance concerns; 3806-1037835 |
67 | US2 | Reconstruct Hwy 2 from just west of CR 73 to just west of CR 74 in Warba | $4,000,000 | 2027 | Scored as urban pavement; 3104-63 |
67 | Hwy 61 | Repair concrete pavement on Hwy 61 from just south of Lake County Road 1 to just north of Gooseberry River; Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel | $2,130,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP); previously listed as two projects in CHIP 3805-111 |
66 | Hwy 61 | Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge | $400,000 | Not Selected | NA |
65 | I35 | Repair I-35 concrete in locations between north of Hinckley to Hwy 53 | $2,500,000 | 2028 | Scores 95 if in 2030 or 2031, funding available in 2029; 5880-1090423 |
65 | US53 | Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB | $100,000 | Not Selected | NA |
65 | Hwy 194 | Resurface Hwy 194 from Superior St to I-35 | $220,000 | 2025 | Part of CHIP bridge project 6933-101 |
63 | US61 | Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel | $770,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP); 3805-1038872; Previously score 63 |
62 | US53 | Resurface Hwy 53 from south limits of Cook to Little Fork River bridge | $770,000 | Not Selected | NA |
61 | Hwy 33 | Resurface Hwy 33 from railroad bridge to Hwy 53 | $10,160,000 | Not Selected | NA |
60 | US2 | Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements | $6,600,000 | 2023 | Selected prior to policy (in 2019-2022 STIP); 3104-62 |
60 | US2 | Hwy 2, 0.1 mile west of Saint Louis County Road 874 to Hwy 194, Resurface Hwy and construct roundabout at Hwy2/Hwy194 | $6,500,000 | 2023 | To coordinate with the timing of MnDOT safety project; 6908-61 |
58 | Hwy 61 | Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367 | $1,780,000 | Not Selected | NA |
58 | Hwy 33 | Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet | $1,930,000 | 2029 | Scored as urban pavement; 0905-56 |
50 | Hwy 61 | Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E., Pavement Resurface, Trail | $70,000 | Not Selected | Included in 6925-145 |
46 | US2 | Resurface Hwy 2 from north end of grass median to I-35 | $90,000 | Not Selected | NA |
46 | I35 | Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge | $6,220,000 | 2029 | RQI forecast doesn’t reflect on the ground conditions or expectations; 0980-1038133 |
41 | Hwy 194 | Resurface Hwy 194 from just north of Mesaba Ave to Superior St | $1,240,000 | Not Selected | NA |
41 | Hwy 33 | Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave | $690,000 | Not Selected | NA |
39 | US53 | Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge | $6,340,000 | 2031 | 6920-57; Scores higher with earlier project, so good candidate to move up if budget becomes available. |
35 | Hwy 61 | Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St | $6,400,000 | 2025 | Scored as urban pavement; 3804-62 |
30 | US53 | Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52 | $2,560,000 | Not Selected | NA |
27 | Hwy 61 | Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1 | $2,070,000 | Not Selected | NA |
25 | US53 | Resurface Hwy 53 from 4th St to just north of Piedmonth Ave | $580,000 | Not Selected | NA |
View more detailed scores (Excel).
Last updated December 2020
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
95 | I35 | Resurface I-35 from Hwy 23 to 50th Ave W | $300,000 | 2026 | NA |
92 | Hwy 61 | Resurface northbound and southbound Hwy 61 from 28th Ave E to 60th Ave E in Duluth | $3,100,000 | 2025 | NA |
92 | I35 | Resurface I-35 from Ramsey Street to Hwy 23 | $400,000 | 2021 | Partially covered by TPI project limits |
92 | US 169 | Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine | $8,300,000 | 2028 | NA |
92 | US 169 | Resurface Hwy 169 from 13th St SW to Hwy 2 | $3,000,000 | 2030 | NA |
91 | I535 | Resurface I-535 from railroad bridge to Jct I-35/Hwy 53 | $600,000 | 2021 | Partially covered by Twin Ports Interchange; remainder under consideration |
90 | US 2 | Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor | $10,300,000 | 2026 | Scored as urban pavement |
88 | I35 | Repair concrete pavement on Northbound and Southbound I-35 in Duluth from Lake Ave to south of 21st Ave E | $2,400,000 | 2024 | NA |
86 | I35 | Resurface I-35 under the 5th Ave bridge | $700,000 | 2026 | NA |
86 | US 53 | Resurface Hwy 53 from just north of wayside rest to the Rice River bridge | $14,000,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
85 | Hwy 61 | Resurface Highway from Knife River to .3 mi. South Lake County Highway 61 | $6,600,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
84 | US 169 | Resurface North Bound Hwy 169 from .4 miles West of St Louis County Road 67 to St Louis County Road 109 & South Bound Hwy 169 from just North of St Louis County Road 5 to just South of St Louis County Road 109 | $14,200,000 | 2024 | NA |
83 | US 53 | Resurface Hwy 53 from Hwy 37 to Vermillion Dr | $3,000,000 | 2027 | NA |
82 | Hwy 61 | Resurface SB Hwy 61 from St Louis County Road 33 (McQuade Rd) to Knife River and NB Hwy 61 from St Louis County Road 33 (McQuade Rd) to St Louis County Road 42 (Homestead Rd) | $6,300,000 | 2028 | Listed as two projects in the CHIP |
82 | I35 | Resurface I-35 from 2.6 miles north of Carlton County Road 4 to Hwy 210 | $11,000,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
82 | US 53 | Resurface Hwy 53 from just south of bridge 69031 to just north of St Louis Count Road 52 in Cotton | $8,100,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
81 | Hwy 61 | Resurface Hwy 61 from 2.6 miles north Lake County Road 6 to 1.4 Miles south of Cook County Road 79 | $4,600,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
81 | US 169 | Resurface Hwy 169 from 8th Ave E to just south of St Louis County Road 92 | $1,200,000 | Not Selected | District does not expect pavement segment(s) to deteriorate as fast as model predicts. |
81 | Hwy 194 | Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth | $12,800,000 | 2026 | Scored as urban pavement |
80 | US 53 | Resurface NB Hwy 53 from 1.1 miles south of St Louis County Road 52 to Bridge 69019 | $2,000,000 | 2029 | NA |
78 | Hwy 11 | Resurface Hwy 11 from just west of Koochiching 332 to 6th Ave W | $4,000,000 | 2027 | Scored as urban pavement |
77 | US 2 | Resurface Hwy 2 from just west of Floodwood to St. Louis County 845 | $4,600,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
77 | Hwy 61 | Resurface Hwy 61 from just south of Cook County Road 14 to Reservation Bay Rd | $13,600,000 | 2025 | NA |
77 | Hwy 61 | Mill and overlay Hwy 61 Northbound & Southbound in Duluth 0.3 miles North of Superior St to St Louis County Road 33/McQuade. |
$3,700,000 | 2024 | NA |
76 | US 2 | Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood | $3,400,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
76 | US 2 | Resurface Hwy 2 in Grand Rapids to just east of La Prairie Ave |
$1,900,000 | 2024 | Scored as urban pavement |
76 | US 53 | Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr | $4,200,000 | 2028 | NA |
76 | US 169 | Resurface Hwy 169 from just north of St. Louis County Road 7 to Hwy 53 | $300,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
75 | US 2 | Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW | $3,100,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
75 | Hwy 33 | Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge | $3,000,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
74 | US 53 | Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 3 ramps at the Hwy 169/Hwy 53 intersection | $7,400,000 | 2027 | Project includes ramps |
73 | US 2 | Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 | $3,600,000 | 2029 | Scored as urban pavement |
73 | Hwy 61 | Resurface Hwy 61 from 60th Ave E to just north of Superior St | $1,100,000 | 2028 | Listed as two projects in the CHIP |
73 | Hwy 33 | Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet | $1,500,000 | 2027 | Scored as urban pavement |
73 | Hwy 33 | Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet | $700,000 | 2027 | Scored as urban pavement |
73 | Hwy 210 | Resurface Hwy 210 from railroad bridge to just east of I-35 | $5,200,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
73 | Hwy 23 | Resurface Hwy 23 from Hwy 107 to I-35 | $4,200,000 | 2028 | NA |
72 | US 169 | Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73 | $6,800,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
71 | US 169 | Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW | $3,000,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
70 | Hwy 61 | Resurface Hwy 61 from 1.3 miles north of Lake County Road 22 to Mary St | $1,700,000 | 2030 | NA |
70 | US 53 | Resurface Hwy 53 from Saint Louis County 682/691 to the St Louis River bridge | $3,200,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance |
69 | US 2 | Resurface highway from .4 mi. E. Prairie River to 1.97 Mi. East of State Highway 65 | $12,500,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
69 | US 2 | Resurface Hwy 2 from 1st St SW to just east of Deer River | $200,000 | Not Selected | NA |
69 | US 169 | Resurface Hwy 169 from just north of Hwy 73 NB ramp to just south of Saint Louis County Road 67 | $300,000 | Not Selected | NA |
68 | Hwy 61 | Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek | $1,000,000 | Not Selected | NA |
68 | Hwy 61 | Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of Unincorporated Township Road 89 | $2,300,000 | 2030 | District anticipates the pavement condition will deteriorate faster than the model is projecting |
68 | US 169 | Resurface Hwy 169 from just south of the Aitkin/Itasca County line to Itasca County Road 437 | $9,400,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
68 | Hwy 11 | Resurface Hwy 11 from Hwy 71 to just east of Hwy 71 | $100,000 | Not Selected | NA |
67 | US 2 | Reconstruct Hwy 2 from 3rd Ave to the Swan River bridge in Warba | $4,000,000 | 2027 | Scored as urban pavement |
67 | Hwy 61 | Repair concrete pavement on Hwy 61 from just south of Lake County Road 1 to just north of Gooseberry River | $2,200,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
67 | Hwy 61 | Resurface Hwy 61 from just north of Split Rock entrance to 1.3 miles north of Lake County Road 22 | $300,000 | Not Selected | NA |
67 | Hwy 210 | Resurface and reconstruct the Highway 210/73 and drainage improvements in Cromwell in Carlton County |
$2,100,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
66 | Hwy 61 | Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge | $200,000 | Not Selected | NA |
66 | US 53 | Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB | $200,000 | Not Selected | NA |
66 | US 53 | Resurface NB Hwy 53 from Saint Louis County Road 13 to 1.6 miles north of Hwy 33 and SB Hwy 53 from Saint Louis County Road 13 to Saint Louis County Road 8 | $32,800,000 | 2030 | RQI forecast doesn’t reflect on the ground conditions or expectations; listed as two projects in the CHIP |
66 | US 53 | Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road 901 | $6,900,000 | Not Selected | NA |
66 | US 169 | Resurface Hwy 169 from just north of Saint Louis County road 5 to just south of Saint Louis County Road 5 | $2,000,000 | Not Selected | NA |
66 | Hwy 194 | Resurface Hwy 194 from Superior St to I-35 | $400,000 | 2026 | Part of CHIP bridge project 6933-101 |
66 | Hwy 33 | Resurface Hwy 33 from just north of Carlton County 116 to 1.5 miles south of Hwy 2 | $3,900,000 | Not Selected | NA |
65 | US 2 | Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements | $8,600,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
65 | Hwy 61 | Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St | $6,600,000 | 2025 | Scored as urban pavement |
65 | US 53 | Resurface Hwy 53 from just north of Saint Louis County Road 901 to just north of Kinmount Creek bridge | $6,400,000 | Not Selected | NA |
65 | US 71 | Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W | $100,000 | Not Selected | NA |
64 | US 2 | Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd | $3,000,000 | 2030 | Selected prior to policy (in 2019-2028 CHIP) |
63 | Hwy 61 | Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel | $700,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
62 | Hwy 61 | Resurface highway from Reservation Bay Rd. to US/Canadian border |
$17,700,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
62 | Hwy 61 | Realign and replace the Silver Creek Bridge and approaches in Lake County |
$100,000 | 2021 | Bridge project |
61 | Hwy 33 | Resurface Hwy 33 from railroad bridge to Hwy 53 | $10,200,000 | Not Selected | NA |
61 | US 71/Hwy 11 | Resurface the highway from 1000' south of Koochiching County Road 7 (Memorial Dr.) to the junction of 4th Street and from the east junction of Hwy 11 to 300' north of 2nd St. and on Highway 11 from the east junction of Highway 71 to the east junction of Highway 53 in International Falls. | $12,500,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
59 | Hwy 61 | Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River | $1,000,000 | 2028 | Ongoing maintenance concerns |
58 | US 2 | Resurface Hwy & and construct roundabout at Hwy2/Hwy194 |
$4,000,000 | 2023 | To coordinate with the timing of MnDOT safety project and a culvert project |
58 | Hwy 61 | Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367 | $900,000 | Not Selected | NA |
56 | US 53 | Resurface SB Hwy 53 from Saint Louis County Road 13 to Saint Louis County Road 8 | $14,500,000 | 2029 | RQI forecast doesn’t reflect on the ground conditions or expectations |
53 | Hwy 61 | Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1 | $1,400,000 | Not Selected | NA |
53 | US 53 | Resurface Hwy 53 from south limits of Cook to Little Fork River bridge | $400,000 | Not Selected | NA |
50 | I535 | Resurface I-535 from Blatnik bridge to railroad bridge | $400,000 | Not Selected | NA |
49 | I-35/Hwy 33 | Resurface I-35 from Hwy 210 bridge to St Louis River Bridge and Highway 33 from I-35 to I-35 NB | $6,600,000 | Not Selected | NA |
46 | US 2 | Resurface Hwy 2 from north end of grass median to I-35 | $100,000 | Not Selected | NA |
45 | I35 | Resurface I-35 from south of CR 138 to south of Carlton County Road 4 | $10,800,000 | Not Selected | NA |
42 | US 2 | Resurface Hwy 2 from Saint Louis County Road 845 to just west of Saint Louis County Road 874 | $3,000,000 | Not Selected | NA |
41 | Hwy 194 | Resurface Hwy 194 from just north of Mesaba Ave to Superior St | $1,100,000 | Not Selected | NA |
38 | I35 | I -35 In Proctor and Duluth. Pavement overlay from Boundary Ave to Central Ave |
$3,300,000 | 2022 | To coordinate with the timing of another MnDOT project, reconstruction scheduled for 2028 (scores 96). |
25 | US 53 | Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of Saint Louis County Road 52 | $2,600,000 | Not Selected | NA |
23 | Hwy 61 | Resurface Hwy 61 from 26th Ave E to 28th Ave E in Duluth | $100,000 | Not Selected | NA |
22 | I35 | Resurface I-35 from bridge over railroad to 1 mile north of bridge | $200,000 | Not Selected | NA |
21 | US 169 | Resurface Hwy 169 from just west of Hwy 65 to just northeast of old Hwy 169 | $200,000 | Not Selected | NA |
21 | Hwy 210 | Resurface Hwy 210 from 1.5 miles east of Hwy 65 to Hwy 73 in Cromwell | $200,000 | Not Selected | NA |
19 | US 53 | Resurface Hwy 53 from 4th St to just north of Piedmont Ave | $700,000 | Not Selected | NA |
17 | US 169 | Resurface Hwy 169 from just south of Pokegama Lake bridge to Pokegama Lake bridge | $200,000 | Not Selected | NA |
16 | Hwy 61 | Resurface Hwy 61 from just northeast of Cook County Road 24 to just south of Cook County Road 7 | $200,000 | Not Selected | NA |
11 | Hwy 33 | Resurface Hwy 33 from bridge 09008 over St Louis River to just north of Carlton County Road 116 | $200,000 | Not Selected | NA |
7 | Hwy 61 | Resurface Hwy 61 from just north of Silver Creek tunnel to 1 mile north of Crow Creek bridge | $200,000 | Not Selected | NA |
7 | Hwy 61 | Resurface Hwy 61 from just south of Cook County Road 7 to 1.3 miles south of Cutface Creek | $200,000 | Not Selected | NA |
7 | Hwy 61 | Resurface Hwy 61 from just north of Silver Creek tunnel to Township Road 89 | $200,000 | Not Selected | NA |
7 | Hwy 210 | Resurface Hwy 210 from Hwy 65 to 1.5 miles east of Hwy 65 | $200,000 | Not Selected | NA |
6 | US 169 | Resurface Hwy 169 from Hwy 200 to just south of Aitkin/Itasca County line | $200,000 | Not Selected | NA |
6 | US 71 | Resurface Hwy 71 from Hwy 6 to bridge in Big Falls | $200,000 | Not Selected | NA |
View more detailed scores (Excel).
Last updated December 2019
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
98 | I-35 | Mill and overlay from bridge over DM&IR Railroad to south end of bridge over Highway 23 | $16,000,000 | 2022 | NA |
95 | I-35 | Medium mill and overlay from Highway 23 to 50th Ave W Bridge | $300,000 | 2027 | Part of 2027 bridge project |
92 | US169 | Medium mill and overlay from Pokegama Lake bridge to Elizabeth Ave | $17,000,000 | 2028 | NA |
91 | US2 | Medium mill and overlay from Itasca County Highway 62 to Highway 169 | $15,000,000 | 2027 | Also listed as Urban Pavement project |
91 | I-35 | Unbonded overlay from south of Pine-Carlton County line to 2.6 miles south of County Road 4 | $23,000,000 | Not Selected | Project is being developed to be ready if additional funding becomes available |
89 | Hwy 61 | Medium mill and overlay from 28th Ave E to 40th Ave E | $5,400,000 | 2026 | Also listed as an Urban Pavement project |
88 | I-35 | Major concrete pavement rehabilitation/diamond grinding from under Lake Ave to Highway 61 | $6,900,000 | 2024 | NA |
87 | US2 | Major concrete pavement rehabilitation/diamond grinding from Reference point 260 to I35 | $800,000 | Not Selected | Waiting to avoid multiple detours in same area. |
86 | I-35 | Medium mill and overlay from under 5th Ave bridge to under Lake Ave bridge | $900,000 | 2027 | NA |
84 | Hwy 194 | Medium mill and overlay from Highway 53 to Mesaba Ave | $19,000,000 | 2027 | Also listed as Urban Pavement project |
83 | US53 | Medium mill and overlay from Highway 37 to Bourgin Dr | $3,200,000 | 2029 | NA |
82 | Hwy 61 | Medium mill and overlay from Knife River to Duluth Missabe Illinois Railroad Bridge | $7,600,000 | 2022 | NA |
82 | Hwy 61 | Medium mill and overlay from McQuade Road to Knife River | $5,900,000 | 2024 | Northbound and southbound limits differ |
82 | US169 | Meduim mill and overlay from St. Louis County Road 67 to St Louis County Road 109 | $16,000,000 | 2024 | NA |
82 | I-35 | Full mill and replace from Bridge number 9790 over BNSF railroad to one mile north of bridge number 9790 | $900,000 | Not Selected | Waiting to coordinate with another project |
81 | Hwy 73 | Medium mill and overlay from Moose Horn River to Highway 27 | $300,000 | Not Selected | District anticipates the pavement condition will not deteriorate as fast as the model is projecting |
81 | US2 | Medium mill and overlay from 0.4 miles east of bridge over Prairie River to Highway 200 | $22,000,000 | 2021 | NA |
81 | Hwy 61 | Medium mill and overlay from 40th Ave E to 60th Ave E | $6,700,000 | 2027 | Also listed as Urban Pavement project |
81 | US53 | Medium mill and overlay from wayside rest to Rice River bridge | $13,000,000 | Not Selected | Schedule preventive maintenance |
81 | US53 | Medium mill and overlay from Little Fork River Bridge to St. Louis County Road 901 | $9,400,000 | Not Selected | Not a district priority, continue to monitor pavement performance |
81 | I-35 | Medium mill and overlay from south of Carlton County Highway 4 to Bridge over Highway 210 | $11,000,000 | 2028 | NA |
80 | Hwy 61 | Medium mill and overlay from 2.6 miles north of Cook County Highway 6 to 0.9 miles south of Onion River | $10,000,000 | 2023 | NA |
80 | US53 | Medium mill and overlay from St. Louis County Highway 52 to Paleface River | $2,900,000 | 2028 | NA |
80 | US169 | Medium mill and overlay from Highway 65 to old Highway 169 | $6,800,000 | Not Selected | Schedule preventive maintenance |
79 | Hwy 194 | Reconstruction from Anderson Rd to Arlington Ave | $9,500,000 | 2027 | Also listed as Urban Pavement project |
78 | Hwy 210 | Medium mill and overlay from west of Highway 65 to Highway 73 | $17,000,000 | 2029 | NA |
78 | US53 | Medium mill and overlay from Paleface River to St. Louis County Highway 16 | $6,700,000 | Not Selected | Project is being developed to be ready if additional funding becomes available |
77 | Hwy 61 | Reclaim and overlay from Cook County Highway 14 to Reservation River Road | $16,000,000 | 2024 | NA |
77 | US53 | Resurface on Highway 53 in multiple locations | $12,000,000 | 2020 | NA |
76 | US53 | Medium mill and overlay from Piedmont Ave to Highway 194 | $2,600,000 | 2027 | NA |
76 | US53 | Reclaim and overlay from Saint Louis County Rd 109 to Kinmount Creek bridge | $25,000,000 | Not Selected | Project is being developed to be ready if additional funding becomes available |
75 | Hwy 61 | Medium mill and overlay from Superior St to McQuade Rd | $5,600,000 | 2023 | NA |
74 | Hwy 11 | Reconstruction from Highway 332 to 6th Ave W | $8,600,000 | 2027 | Also listed as Urbam Pavement project |
74 | US2 | Medium mill and overlay from US169 to 0.4 miles East of Railroad bridge | $2,500,000 | 2024 | Also listed as Urban Pavement project |
74 | Hwy 33 | Medium mill and overlay from I-35 to Doddridge Ave | $2,200,000 | Not Selected | Not a district priority, continue to monitor pavement performance |
74 | US53 | Major concrete pavement rehabilitation/Edge Drain from 2nd Ave NW to Wayside Rest | $11,000,000 | 2027 | NA |
73 | US2 | Reclaim and overlay from Highway 194 to E Boundary Ave | $13,000,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project |
73 | Hwy 23 | Medium mill and overlay from Highway 107 (district boundary) to I-35 | $6,700,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
73 | Hwy 23 | Medium mill and overlay from Hulett Ave to I-35 | $3,000,000 | Not Selected | NA |
73 | Hwy 210 | Unbonded overlay from Aitkin County Road 81 to Highway 169 | $12,000,000 | Not Selected | NA |
73 | US169 | Medium mill and overlay from Pokegama Lake Bridge to 0.2 miles south of the bridge | $400,000 | Not Selected | NA |
71 | US2 | Thick overlay from 1st St to Deer River | $500,000 | Not Selected | NA |
71 | Hwy 61 | Medium mill and overlay from Railroad bridge to 5th Street crossings | $8,700,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project |
71 | Hwy 61 | Medium mill and overlay from 60th Ave to North Superior St | $910,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
71 | Hwy 33 | Medium mill and overlay from Highway 2 to north end of the railroad bridge | $4,800,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
71 | Hwy 210 | Major concrete pavement repair from Crow Wing/Aitkin County line to Highway 169 | $2,200,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
71 | US53 | Medium mill and overlay from Highway 33 to bridge 69031 | $3,800,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
71 | US169 | Medium mill and overlay from Highway 200 in Hill City | $12,000,000 | Not selected | NA |
70 | Hwy 61 | Medium mill and overlay from Lake County Highway 22 to Mary St | $1,800,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
70 | Hwy 61 | Reconstruction from Reference point 30 to Silver Creek Tunnel | $3,700,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
70 | Hwy 210 | Medium mill and overlay from east of Highway 73 to 0.4 miles east of I-35 | $15,000,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
69 | Hwy 210 | Medium mill and overlay from Highway 169 to Ripple River Bridge | $1,400,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement project |
69 | US169 | Unbonded overlay from Highway 210 to Mississippi River Bridge | $5,200,000 | Not selected | NA |
68 | US169 | Medium mill and overlay from Aitkin County line to Aitkin County Road 76 | $7,500,000 | Not selected | NA |
67 | US71 | Thick mill and overlay from the junction of Highways 11 and 71 to Highway 53 | $100,000 | Not selected | NA |
67 | Hwy 210 | Unbonded overlay from Ripple River to Aitkin County Road | $1,400,000 | Not selected | NA |
67 | US169 | Medium mill and overlay from Aitkin County Road 76 to Highway 210 | $2,200,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
66 | Hwy 61 | Medium mill and overlay from Cook County Highway 7 to Cutface Creek | $1,000,000 | Not selected | NA |
66 | US169 | Major Concrete pavement repair from County Road 5 to County Road 75 | $1,100,000 | Not selected | NA |
65 | Hwy 61 | Major concrete pavement rehabilitation/diamond grinding from Lake County Highway 1 to Gooseberry River | $500,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 61 | Medium mill and overlay from Mary St to Beaver Bay | $400,000 | Not selected | NA |
65 | Hwy 210 | Medium mill and overlay from East of Carlton County Road 53 to the end of Railroad bridge | $600,000 | Not selected | NA |
65 | US169 | Reclaim and overlay from Itasca County Highway 67 to County Road 437 | $4,400,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
65 | US169 | Reclaim and overlay from Aitkin/Itasca County line to Aitkin County Highway 67 | $4,200,000 | Not selected | NA |
64 | US2 | Medium mill and overlay from Pinchberry Road to Itasca County Highway 62 | $4,200,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
64 | Hwy 61 | Medium mill and overlay from Split Rock Entrance to Lake County Highway 22 | $500,000 | Not Selected | NA |
64 | Hwy 210 | Full mill and replace from Highway 65 to 1.5 miles west of Highway 65 | $1,300,000 | Not Selected | NA |
63 | US71 | Reconstruction from Itasca/Koochiching County line to Highway 1 | $17,000,000 | Not Selected | NA |
63 | Hwy 61 | Major concrete pavement rehabilitation/diamond grinding within Silver Creek tunnel | $1,000,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
62 | Hwy 61 | Reclaim and overlay from Reservation Bay Road to US/Canadian Border | $15,000,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
61 | US2 | Thick overlay from Highway 46 to Highway 6 | $900,000 | Not Selected | NA |
61 | Hwy 33 | Medium mill and overlay from Cloquet Ave to St. Louis Bridge | $700,000 | 2025 | Also listed as Urban Pavement project |
61 | Hwy 6 | Medium mill and overlay from Big Fork River Bridge to Highway 1 | $4,800,000 | 2028 | Ongoing maintenance concerns |
59 | Hwy 73 | Medium mill and overlay from 3rd Ave to Carlton County Road 129 | $4,000,000 | Not Selected | NA |
59 | US2 | Reclaim and overlay from Floodwood to St. Louis County Road 845 | $9,100,000 | Not selected | NA |
59 | Hwy 61 | Medium mill and overlay from Gooseberry River to Split Rock River | $1,100,000 | 2028 | Ongoing maintenance concerns |
59 | Hwy 33 | Medium mill and overlay from St Louis River to Carlton County Rd 116 | $1,800,000 | Not selected | NA |
59 | US2 | Reclaim and overlay from Highway 200 to Floodwood | $11,000,000 | 2028 | District anticipates the pavement condition will deteriorate faster than the model is projecting |
58 | I-535 | Major Concrete rehabilitation from Blatnik Bridge to NW end of Railroad Bridge | $400,000 | 2020 | Part of Twin Ports Interchange project |
57 | US53 | Medium mill and overlay from Cook to Little Fork River | $700,000 | Not Selected | NA |
56 | US2 | Medium mill and overlay from St. Louis County Road 874 to Highway 194 | $4,000,000 | 2023 | Selected prior to policy (in 2019-2028 CHIP) |
56 | Hwy 33 | Reclaim and overlay from Doddridge Ave to Cloquet Ave | $1,500,000 | 2025 | Also listed as an Urban Pavement project |
54 | US2 | Medium mill and overlay from Bridge 5760 to Itasca County Highway 18 | $2,300,000 | 2022 | Ongoing maintenance concerns |
52 | Hwy 61 | Reclaim and overlay from 1.3 miles South of Cutface Creek to 1.8 miles north of Cutface Creek | $3,200,000 | 2028 | District anticipates the pavement condition will deteriorate faster than the model is projecting |
49 | Hwy 210 | Urban Reconstruction from Highway 73 to Cromwell | $2,000,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
47 | I-35 | Reclaim and overlay from Highway 210 to St. Louis River Bridge | $7,600,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
44 | US53 | Reclaim and overlay northbound lanes from 1.3 miles north of Swan Lake Road to .1 miles south of Cemetery Road and bridge repair work. | $10,000,000 | 2023 | Selected prior to policy (in 2019-2028 CHIP) |
44 | US53 | Diamond Grinding from Highway 169 to Highway 33 | $1,600,000 | Not Selected | NA |
39 | Hwy 33 | Medium mill and overlay from St. Louis County Rd 116 to Highway 2 | $5,300,000 | Not Selected | NA |
38 | Hwy 33 | Medium mill and overlay from Railroad bridge to Highway 53 | $11,000,000 | 2028 | Inadequate funding for reclaim/reconstruction which scores higher |
35 | Hwy 73 | Medium mill and overlay from Highway 169 to 4th St | $600,000 | 2025 | Also listed as Urban Pavement project |
34 | US169 | Diamond Grinding from St. Louis County Road 109 to Highway 53 | $300,000 | Not Selected | NA |
33 | Hwy 73 | Medium mill and overlay from Highway 73 to 13th St | $100,000 | 2026 | Also listed as Urban Pavement project |
32 | US169 | Full mill and replace from Highway 47 to Highway 210 | $400,000 | Not Selected | NA |
30 | US169 | Reclaim and overlay from St. Louis County Road 5 to Highway 73 | $1,400,000 | Not Selected | NA |
29 | Hwy 73 | Major concrete pavement rehabilitation from 4th St to Highway 73 | $800,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project |
28 | Hwy 61 | Minor concrete rehabilitation from 26th Ave to 28th Ave | $100,000 | Not Selected | NA |
19 | US53 | Diamond Grinding from 4th St to Piedmont Ave | $300,000 | 2020 | Part of Twin Ports Interchange project |
17 | US53 | Minor concrete rehabilitation from I-35 to 4th St | $200,000 | 2020 | Part of Twin Ports Interchange project |