Minnesota Department of Transportation

511 Travel Info

Hwy 61 Grand Marais culverts 

Grand Marais

Traffic impacts

Starting on Aug. 6, Highway 61 will be temporarily detoured in Hovland. Traffic will be routed on County Road 16/Arrowhead Trail to County Road 69/North Road for up to 12 consecutive calendar days. The highway will be fully closed to replace a culvert at an unnamed creek.

Culvert work at Myhr Creek (milepost 124.83) has a temporary single lane bypass controlled by a signal. Work at Otis Creek (milepost 129.36) will be complete on Aug. 5.

About this project

A rendering of the Hwy 61 project with box culvert replacements.

Click image for full-size image

Summary of work

The project involves replacing six aging box culverts (more than 80 years old) with properly sized hydraulic structures. The culverts are located between reference posts 124 and 133.

Visual quality renderings

These documents show a before and after view of what the culverts at Myhr and Carlson creeks will look like.