Minnesota Department of Transportation

511 Travel Info

Hwy 115—Randall to Camp Ripley

Morrison County

2024 project complete

All lanes open

Resurface and improve Hwy 115 from east of Hwy 10 in Randall to the Mississippi River bridge east of Morrison Co. Rd. 213.

Hwy 115 location map
Complete: 2024 roadwork on Hwy 115 Randall to Camp Ripley. Select image to enlarge

Summary of work

  • Resurface road from Hwy 10 to the east entrance of Camp Ripley
  • Replace four pipes:
  • A) East of 95th Ave.
    B) East of Co. Rd. 208
    C) East of Co. Rd. 13
    D) West of Co. Rd. 213

  • Upgrade pedestrian sidewalks at Camp Ripley’s main entrance at Co. Rd. 213 (Grouse Rd.)
  • Upgrade guardrail