Minnesota Department of Transportation

511 Travel Info

Hwy 10 and 23—St. Cloud

Interchange east of the Mississippi River in Benton County

About this project

Reconstruct Hwy 10 and Hwy 23 in St. Cloud
Reconstruct Hwy 10 and Hwy 23 interchange and improve pedestrian access The new interchange will have four ramps on the southside of the bridges; instead of eight ramps—two in each of the four quadrants.

Summary of work

  • Reconstruct and improve the Hwy 10 and 23 interchange:
    • Rebuild the Hwy 23 bridge(s) over Hwy 10
    • Reconfigure on/off ramps to improve motorist traffic flow and safety
    • Provide safer pedestrian and bicyclist crossing options
  • Reconstruct both directions of Hwy 10 between 15th Ave. SE and Benton Dr. includes turn lanes, shoulders and entrances
  • Reconstruct both directions of Hwy 23 from east of Wilson Ave. SE near the pedestrian overpass to east of Benton Co. Rd. 1, includes turn lanes, shoulders and entrances
  • Update signal systems at:
    • Hwy 23 and Lincoln Ave.
    • Hwy 10/E St Germain St.
    • Hwy 23 and Division St. E/14th Ave. SE
  • Replace or repair drainage structures
  • Construct a new City of St. Cloud Fourth St. SE bridge to span Hwy 10 and connect to the east and west Hwy 10 frontage roads
  • Construct a noisewall along the south side of Hwy 23 and east of 14th Ave. SE
  • Improve and update pedestrian access on Hwy 10 and Hwy 23