About this project
Summary of MnDOT work
- Repair the concrete on two sections of Hwy 59
- South of Garvin: Hwy 59 from 201st St. to Lyon CR 14
- South of Marshall: Hwy 59 from Lyon CR 6 to Hwy 23
- Update sidewalks and pedestrian crossings in Marshall to meet current Americans with Disabilities standards.
- Hwy 19 from the Hwy 23 intersection to Tiger Dr
- Hwy 59 intersections with Susan Dr and Boyer Dr
Traffic impacts
- A detour will be required to complete the concrete repair in each section (see maps below).
- The Marshall detour has been removed.
- The detour for the segment south of Garvin has been removed.
- Short-term, intermittent intersection closures will take place along Hwy 59 for ADA work and minor detours may be required
- Hwy 59 travelers south of Garvin will be detoured on CR 48, CR 29, CR 5, Hwy 14
- Hwy 59 travelers south of Marshall will be detoured on Hwy 23, CR 35, CR 6
Project updates
Oct. 25, 2024
- All detours and barriers will be removed by the end of today.
- This project has been completed.