Project complete

View full-size map
About this project
Crews repaired bridge piers under the 3rd St. and 4th St. ramps in Minneapolis. Crews also replaced some of the existing lighting near the piers with LED lighting.
Summary of work
- Repaired bridge pier caps
- Repaired bridge piers
- Replaced some lighting under bridge deck