About this project

Hwy 50 project location map.
We will be repaving Hwy 50 to provide a smoother road surface, update drainage, improve safety by adding a right turn lane in Hampton Township, and improving accessibility by adding a pedestrian ramp and sidewalk in New Trier. This project is in coordination with the City of Hampton and the City of New Trier.
Summary of work
- Repave Hwy 50 from Hwy 52 in Hampton to Hwy 61 in Douglas Township
- Reconstruct Hwy 50 in New Trier between Hinton Ave. and Holt Ave.
- Add right turn lane at Co. Rd. 85/Goodwin Ave.
- Update drainage
- Improve accessibility at the intersection of Hwy 50 and Co. Rd. 85/Hogan Ave. in New Trier
- Repave 700 ft. of Hogan Ave. north from Hwy 50
- Relocate utilities