National Highway System pavement projects
MnDOT District 7
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MN SHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 7 project selection
- District 7 Non-National Highway System pavement projects
- District 7 Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated November 2024
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
100 | I90 | Resurface WB lanes from Jackson CR 5 to Nobles CR 12 near Rushmore and rehab bridge 53819 | $11,500,000 | 2032 | 3280-1052560 |
94 | I90 | Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek | $8,130,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
94 | I90 | Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 | $6,060,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
90 | US Hwy 169 | Resurface and repair bridges on Hwy 169 from Riverfront Drive to Lake Street | $32,800,000 | 2027 | 0713-81 |
87 | I90 | Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting | $2,000,000 | 2029 | 5380-154 |
87 | Hwy 60 | Repair WB lanes from Worthington to Windom and EB lanes at Heron Lake and from Wilder to Windom | $18,200,000 | 2033 | 3204-70 |
87 | Hwy 60 | Resurface Hwy 60 EB lanes from I-90 to west side of Heron Lake and east side of Heron Lake to Wilder | $18,800,000 | Not Selected | 3204-1112107. District intends to address concrete pavements on this highway first then return for bituminous. |
86 | US Hwy 14 | Resurface Hwy 14 from 3rd Ave to Riverfront Dr in Mankato; replace bridges 07009, 07010, 07017, and 07018; rehab bridges 07015 and 07016; replace or improve drainage, signing and lighting | $41,800,000 | 2034 | 0702-1101714; Not a district priority, will continue to monitor pavement performance |
85 | I90 | Resurface WB lanes from Hwy 4 to Hwy 86 | $21,500,000 | 2031 | 3280-1069643; Not a district priority, will continue to monitor pavement performance |
84 | I90 | Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 | $5,400,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
84 | I90 | Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab 67802; replace or improve signing and lighting | $7,900,000 | 2030 | 6780-126 |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 | $7,320,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 | $4,740,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Resurface EB lanes Rock County to Adrian and WB lanes from Adrian to Rushmore | $32,800,000 | 2029 | 5380-154 This project was selected for the FY29 Long Term Pavement Supplement, scoring an 83 in that solicitation. |
82 | Hwy 60 | Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 | $1,500,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | Hwy 60 | Resurface from Lake Crystal to 528th Avenue (Cray Corner) | $6,900,000 | 2033 | 0708-1071483; Not a district priority, will continue to monitor pavement performance |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 | $3,900,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Union St to Hwy 93 | $1,820,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
81 | US Hwy 169 | Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge | $19,880,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
80 | Hwy 60 | Repair pavement on Mountain Lake bypass | $6,600,000 | 2033 | 1703-82 |
80 | US Hwy 14 | Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $11,900,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
80 | US Hwy 169 | Repair from Mankato to Saint Peter - Future Project | $6,000,000 | 2040 | 5211-74; Shelf Project |
79 | Hwy 60 | Medium mill and overlay westbound lanes from County Road 47 to I-90 | $3,670,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
79 | US Hwy 71 | Resurface from Iowa border to North Hwy in Jackson | $12,700,000 | 2030 | 3205-36 |
78 | I90 | Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 | $10,500,000 | Not Selected | NA |
78 | Hwy 15 | Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm | $870,000 | Not Selected | NA |
78 | Hwy 60 | Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. | $2,510,000 | Not Selected | NA |
77 | Hwy 60 | Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,430,000 | Not Selected | NA |
76 | US Hwy 14 | Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr | $8,140,000 | Not Selected | NA |
76 | US Hwy 14 | Repair from CR 3 to 2 miles east of Eagle Lake | $15,300,000 | 2034 | 0702-128 |
75 | Hwy 60 | Resurface WB lanes between St. James and Butterfield | $2,800,000 | 2029 | 8308-115 |
75 | Hwy 60 | Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge. | $14,800,000 | Not Selected | NA |
74 | Hwy 60 | Medium mill and overlay from Nobles County Road 4 to north of I-90 | $12,400,000 | Not Selected | NA |
74 | Hwy 60 | Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge | $7,310,000 | Not Selected | NA |
73 | US Hwy 14 | Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line | $10,070,000 | Not Selected | NA |
73 | US Hwy 169 | Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 | $4,660,000 | Not Selected | NA |
73 | US Hwy 169 | Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago | $4,280,000 | Not Selected | NA |
73 | US Hwy 71 | Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) | $6,140,000 | Not Selected | NA |
72 | US Hwy 169 | Repair from north Jct Hwy 93 to rest area at Le Sueur | $4,000,000 | 2032 | 4013-66 |
71 | Hwy 60 | Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake | $1,590,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from Iowa Border to Nobles County Road 4 | $2,980,000 | Not Selected | NA |
71 | Hwy 60 | Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 | $1,090,000 | Not Selected | NA |
70 | Hwy 15 | Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St | $11,870,000 | Not Selected | NA |
69 | Hwy 15 | Medium mill and overlay from 4th St to Goemann Rd | $260,000 | Not Selected | NA |
68 | US Hwy 14 | Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. | $10,780,000 | Not Selected | NA |
67 | US Hwy 14 | Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill | $3,190,000 | Not Selected | NA |
67 | US Hwy 169 | Medium mill and overlay from Faribault County Road 52 to .17 miles north of Faribault County Road 52 | $60,000 | Not Selected | NA |
66 | US Hwy 14 | Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm | $4,910,000 | Not Selected | NA |
63 | Hwy 15 | Medium mill and overlay from Goemann Rd to Brown/Watonwan County line | $5,790,000 | Not Selected | NA |
61 | US59 | Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington | $90,000 | 2027 | 5304-41 |
58 | I90 | Thin mill and overlay from Rock River to Rock/Nobles County Line | $2,450,000 | Not Selected | NA |
56 | Hwy 22 | Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22. Preliminary work in 2024; Construction/detour 2025-2026. | $39,378,795 | 2025, 2026, 2027 | 0714-35; Reconstruct to integrate safety improvements |
54 | I90 | Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line | $6,510,000 | Not Selected | NA |
54 | Hwy 22 | Resurface Hwy 22 from Hwy 14 to CR 26 | $10,000,000 | 2033 | 0714-1101719 |
54 | Hwy 60 | Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster | $2,130,000 | Not Selected | Address this pavement with adjacent work |
53 | US Hwy 169 | Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 | $9,660,000 | Not Selected | NA |
48 | US Hwy 169 | Medium mill and overlay from US Hwy 14 to Hwy 99 | $8,900,000 | Not Selected | NA |
46 | Hwy 60 | Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair three bridges; construct bike trail; improve intersection | $21,600,000 | 2025, 2026 | 0708-47 Extensive pavement deterioration |
45 | Hwy 60 | Minor CPR and Diamond Grinding from Alder St to Hwy 62 | $2,940,000 | Not Selected | NA |
44 | US59 | Thick overlay from 27th St north to Hwy 62 | $10,990,000 | 2034 | 5304-44 |
44 | Hwy 60 | Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake | $18,820,000 | Not Selected | NA |
40 | US Hwy 14 | Thin mill and overlay from Palmer Ave to Garden St in New Ulm | $1,720,000 | Not Selected | NA |
35 | US Hwy 169 | Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 | $770,000 | Not Selected | NA |
34 | Hwy 22 | Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) | $1,370,000 | Not Selected | NA |
34 | US Hwy 169 | Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 | $350,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 | $4,510,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area | $5,940,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 | $10,260,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge | $6,380,000 | Not Selected | NA |
33 | I90 | Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 | $2,330,000 | Not Selected | NA |
29 | Hwy 23 | Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper | $50,000 | Not Selected | NA |
29 | Hwy 60 | Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge | $16,220,000 | Not Selected | NA |
26 | Hwy 15 | Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 | $160,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 | $2,050,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 | $2,050,000 | Not Selected | NA |
19 | Hwy 23 | Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $8,810,000 | Not Selected | NA |
19 | US Hwy 169 | Thin mill and overlay from Iowa border to Faribault County Road 52 | $3,050,000 | Not Selected | NA |
15 | US Hwy 14 | Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye | $1,700,000 | Not Selected | NA |
15 | US Hwy 71 | Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 | $350,000 | Not Selected | NA |
14 | Hwy 15 | Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 | $2,400,000 | Not Selected | NA |
14 | Hwy 60 | Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave | $100,000 | Not Selected | NA |
14 | Hwy 60 | Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane | $50,000 | Not Selected | NA |
9 | US Hwy 169 | Thin mill and overlay from County Road 52 to 10th St in Blue Earth | $260,000 | Not Selected | NA |
0 | US Hwy 169 | Minor CPR from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter | $3,260,000 | Not Selected | NA |