Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MN SHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated November 2024

Score Route Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
100 I90 Resurface WB lanes from Jackson CR 5 to Nobles CR 12 near Rushmore and rehab bridge 53819   $11,500,000   2032 3280-1052560    
94 I90 Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek $8,130,000 Not Selected Not a district priority, will continue to monitor pavement performance
94 I90 Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 $6,060,000 Not Selected Not a district priority, will continue to monitor pavement performance
90 US Hwy 169 Resurface and repair bridges on Hwy 169 from Riverfront Drive to Lake Street   $32,800,000   2027 0713-81
87 I90 Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting   $2,000,000   2029 5380-154
87 Hwy 60 Repair WB lanes from Worthington to Windom and EB lanes at Heron Lake and from Wilder to Windom   $18,200,000   2033 3204-70    
87 Hwy 60 Resurface Hwy 60 EB lanes from I-90 to west side of Heron Lake and east side of Heron Lake to Wilder   $18,800,000   Not Selected 3204-1112107. District intends to address concrete pavements on this highway first then return for bituminous.    
86 US Hwy 14 Resurface Hwy 14 from 3rd Ave to Riverfront Dr in Mankato; replace bridges 07009, 07010, 07017, and 07018; rehab bridges 07015 and 07016; replace or improve drainage, signing and lighting   $41,800,000   2034 0702-1101714; Not a district priority, will continue to monitor pavement performance    
85 I90 Resurface WB lanes from Hwy 4 to Hwy 86   $21,500,000   2031 3280-1069643; Not a district priority, will continue to monitor pavement performance    
84 I90 Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 $5,400,000 Not Selected Not a district priority, will continue to monitor pavement performance
84 I90 Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab 67802; replace or improve signing and lighting   $7,900,000   2030 6780-126    
83 I90 Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 $7,320,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 $4,740,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Resurface EB lanes Rock County to Adrian and WB lanes from Adrian to Rushmore    $32,800,000   2029 5380-154    This project was selected for the FY29 Long Term Pavement Supplement, scoring an 83 in that solicitation.
82 Hwy 60 Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 $1,500,000 Not Selected Not a district priority, will continue to monitor pavement performance
82 Hwy 60 Resurface from Lake Crystal to 528th Avenue (Cray Corner)   $6,900,000   2033 0708-1071483; Not a district priority, will continue to monitor pavement performance
82 US Hwy 169 Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 $3,900,000 Not Selected Not a district priority, will continue to monitor pavement performance
82 US Hwy 169 Medium mill and overlay northbound lanes from Union St to Hwy 93 $1,820,000 Not Selected Not a district priority, will continue to monitor pavement performance
81 US Hwy 169 Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge $19,880,000 Not Selected Not a district priority, will continue to monitor pavement performance
80 Hwy 60 Repair pavement on Mountain Lake bypass    $6,600,000   2033 1703-82    
80 US Hwy 14 Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass $11,900,000 Not Selected Not a district priority, will continue to monitor pavement performance
80 US Hwy 169 Repair from Mankato to Saint Peter - Future Project   $6,000,000   2040 5211-74; Shelf Project
79 Hwy 60 Medium mill and overlay westbound lanes from County Road 47 to I-90 $3,670,000 Not Selected Not a district priority, will continue to monitor pavement performance
79 US Hwy 71 Resurface from Iowa border to North Hwy in Jackson    $12,700,000   2030 3205-36    
78 I90 Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 $10,500,000 Not Selected NA
78 Hwy 15 Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm $870,000 Not Selected NA
78 Hwy 60 Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. $2,510,000 Not Selected NA
77 Hwy 60 Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder $2,430,000 Not Selected NA
76 US Hwy 14 Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr $8,140,000 Not Selected NA
76 US Hwy 14 Repair from CR 3 to 2 miles east of Eagle Lake    $15,300,000   2034 0702-128    
75 Hwy 60 Resurface WB lanes between St. James and Butterfield    $2,800,000   2029 8308-115    
75 Hwy 60 Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge.  $14,800,000 Not Selected NA
74 Hwy 60 Medium mill and overlay from Nobles County Road 4 to north of I-90 $12,400,000 Not Selected NA
74 Hwy 60 Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge $7,310,000 Not Selected NA
73 US Hwy 14 Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line $10,070,000 Not Selected NA
73 US Hwy 169 Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 $4,660,000 Not Selected NA
73 US Hwy 169 Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago $4,280,000 Not Selected NA
73 US Hwy 71 Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) $6,140,000 Not Selected NA
72 US Hwy 169 Repair from north Jct Hwy 93 to rest area at Le Sueur   $4,000,000   2032 4013-66
71 Hwy 60 Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake $1,590,000 Not Selected NA
71 Hwy 60 Medium mill and overlay from Iowa Border to Nobles County Road 4 $2,980,000 Not Selected NA
71 Hwy 60 Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 $1,090,000 Not Selected NA
70 Hwy 15 Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St $11,870,000 Not Selected NA
69 Hwy 15 Medium mill and overlay from 4th St to Goemann Rd $260,000 Not Selected NA
68 US Hwy 14 Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. $10,780,000 Not Selected NA
67 US Hwy 14 Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill $3,190,000 Not Selected NA
67 US Hwy 169 Medium mill and overlay from  Faribault County Road 52 to .17 miles north of Faribault County Road 52 $60,000 Not Selected NA
66 US Hwy 14 Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm $4,910,000 Not Selected NA
63 Hwy 15 Medium mill and overlay from Goemann Rd to Brown/Watonwan County line $5,790,000 Not Selected NA
61 US59 Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington $90,000 2027 5304-41
58 I90 Thin mill and overlay from Rock River to Rock/Nobles County Line $2,450,000 Not Selected NA
56 Hwy 22 Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22. Preliminary work in 2024; Construction/detour 2025-2026.   $39,378,795   2025, 2026, 2027   0714-35; Reconstruct to integrate safety improvements
54 I90 Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line $6,510,000 Not Selected NA
54 Hwy 22 Resurface Hwy 22 from Hwy 14 to CR 26   $10,000,000   2033 0714-1101719    
54 Hwy 60 Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster $2,130,000 Not Selected Address this pavement with adjacent work
53 US Hwy 169 Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 $9,660,000 Not Selected NA
48 US Hwy 169 Medium mill and overlay from US Hwy 14 to Hwy 99 $8,900,000 Not Selected NA
46 Hwy 60 Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair three bridges; construct bike trail; improve intersection   $21,600,000   2025, 2026   0708-47   Extensive pavement deterioration
45 Hwy 60 Minor CPR and Diamond Grinding from Alder St to Hwy 62 $2,940,000 Not Selected NA
44 US59 Thick overlay from 27th St north to Hwy 62 $10,990,000 2034 5304-44
44 Hwy 60 Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake $18,820,000 Not Selected NA
40 US Hwy 14 Thin mill and overlay from Palmer Ave to Garden St in New Ulm $1,720,000 Not Selected NA
35 US Hwy 169 Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 $770,000 Not Selected NA
34 Hwy 22 Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) $1,370,000 Not Selected NA
34 US Hwy 169 Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 $350,000 Not Selected NA
33 I90 Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 $4,510,000 Not Selected NA
33 I90 Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area $5,940,000 Not Selected NA
33 I90 Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 $10,260,000 Not Selected NA
33 I90 Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge $6,380,000 Not Selected NA
33 I90 Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 $2,330,000 Not Selected NA
29 Hwy 23 Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper $50,000 Not Selected NA
29 Hwy 60 Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge $16,220,000 Not Selected NA
26 Hwy 15 Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 $160,000 Not Selected NA
25 I90 Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 $2,050,000 Not Selected NA
25 I90 Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 $2,050,000 Not Selected NA
19 Hwy 23 Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper $8,810,000 Not Selected NA
19 US Hwy 169 Thin mill and overlay from Iowa border to Faribault County Road 52 $3,050,000 Not Selected NA
15 US Hwy 14 Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye $1,700,000 Not Selected NA
15 US Hwy 71 Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 $350,000 Not Selected NA
14 Hwy 15 Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 $2,400,000 Not Selected NA
14 Hwy 60 Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave $100,000 Not Selected NA
14 Hwy 60 Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane $50,000 Not Selected NA
9 US Hwy 169 Thin mill and overlay from County Road 52 to 10th St in Blue Earth $260,000 Not Selected NA
0 US Hwy 169 Minor CPR from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter $3,260,000 Not Selected NA

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
94 I90 Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek $8,130,000 Not Selected Not a district priority, will continue to monitor pavement performance
94 I90 Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 $6,060,000 Not Selected NA
87 I90 Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting   $2,000,000   2029 5380-1101713    
87 Hwy 60 Resurface Hwy 60 EB lanes from I-90 to west side of Heron Lake and east side of Heron Lake to Wilder   $18,800,000   2033 3204-1112107    
86 US Hwy 14 Resurface Hwy 14 from Lookout Dr to Victory Dr; replace bridges 07023, 07011, 07009, and 07010; replace or improve drainage, signing and lighting   $25,000,000   2032 0702-1101714    
85 US Hwy 169 Repair from north Jct Hwy 93 to rest area at Le Sueur   $4,000,000   2030 4013-1071563    
84 I90 Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab bridge 9690; replaces bridges 9774, 67802, and 67806; replace or improve signing and lighting   $3,230,000   2030 6780-1101707    
84 I90 Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 $5,400,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Resurface WB lanes from Adrian to Rushmore    $6,500,000   2028 5380-154    
83 I90 Resurface WB lanes from CR 5 in Jackson to CR 12 near Rushmore   $11,500,000   2032 3280-1052560    
83 I90 Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 $7,320,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 $4,740,000 Not Selected NA
82 Hwy 60 Repair WB lanes from Worthington to Windom and EB lanes at Heron Lake and from Wilder to Windom   $18,200,000   2030 3204-70    
82 Hwy 60 Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 $1,500,000 Not Selected NA
82 US Hwy 169 Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 $3,900,000 Not Selected NA
82 US Hwy 169 Medium mill and overlay northbound lanes from Union St to Hwy 93 $1,820,000 Not Selected NA
81 US Hwy 169 Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge $19,880,000 Not Selected NA
80 Hwy 60 Resurface from Lake Crystal to Cray Corner/528th Avenue   $6,900,000   2032 0708-1071483    
80 US Hwy 14 Repair from CR 3 to 2 miles east of Eagle Lake    $13,300,000   2029 0702-128    
80 US Hwy 14 Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass $11,900,000 Not Selected NA
79 Hwy 60 Medium mill and overlay westbound lanes from County Road 47 to I-90 $3,670,000 Not Selected NA
79 US Hwy 71 Resurface from Iowa border to CR 38 in Jackson    $9,500,000   2030 3205-36    
78 I90 Resurface WB lanes from Hwy 4 to Hwy 86   $10,000,000   2031 3280-1069643    
78 I90 Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 $10,500,000 Not Selected NA
78 I90 Cold in place recycling and medium overlay westbound lanes from Hwy 4 to 2.5 miles east of Hwy 86 $9,750,000 Not Selected NA
78 Hwy 15 Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm $870,000 Not Selected NA
78 Hwy 60 Repair pavement on Mountain Lake bypass    $6,600,000   2031 1703-82    
78 Hwy 60 Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair bridge    $16,800,000   2025, 2026   0708-47   Extensive pavement deterioration
78 Hwy 60 Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. $2,510,000 Not Selected NA
77 Hwy 60 Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder $2,430,000 Not Selected NA
76 US Hwy 14 Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr $8,140,000 Not Selected NA
75 Hwy 60 Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge.  $14,800,000 Not Selected NA
74 Hwy 60 Medium mill and overlay from Nobles County Road 4 to north of I-90 $12,400,000 Not Selected NA
74 Hwy 60 Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge $7,310,000 Not Selected NA
73 Hwy 22 Resurface Hwy 22 from Hwy 14 to CR 26; replace or improve drainage - Future Project   $1,800,000   2034 0714-1101719    
73 US Hwy 14 Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line $10,070,000 Not Selected NA
73 US Hwy 169 Resurface and repair bridges from Riverfront Drive to Lake Street   $69,500,000   2027, Future   0713-81   
73 US Hwy 169 Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 $4,660,000 Not Selected NA
73 US Hwy 169 Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago $4,280,000 Not Selected NA
73 US Hwy 71 Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) $6,140,000 Not Selected NA
71 Hwy 60 Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake $1,590,000 Not Selected NA
71 Hwy 60 Medium mill and overlay from Iowa Border to Nobles County Road 4 $2,980,000 Not Selected NA
71 Hwy 60 Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 $1,090,000 Not Selected NA
71 US59 Thick overlay from 27th St north to Hwy 62 $10,990,000 Not Selected NA
70 Hwy 15 Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St $11,870,000 Not Selected NA
69 Hwy 15 Medium mill and overlay from 4th St to Goemann Rd $260,000 Not Selected NA
68 US Hwy 14 Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. $10,780,000 Not Selected NA
67 US Hwy 14 Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill $3,190,000 Not Selected NA
67 US Hwy 169 Medium mill and overlay from  Faribault County Road 52 to .17 miles north of Faribault County Road 52 $60,000 Not Selected NA
66 US Hwy 14 Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm $4,910,000 Not Selected NA
63 Hwy 15 Medium mill and overlay from Goemann Rd to Brown/Watonwan County line $5,790,000 Not Selected NA
62 Hwy 60 Resurface WB lanes between St. James and Butterfield    $2,800,000   2028 8308-115    
61 US59 Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington $90,000 Not Selected NA
58 I90 Thin mill and overlay from Rock River to Rock/Nobles County Line $2,450,000 Not Selected NA
58 Hwy 22 Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22.   $39,890,000   2025, 2026, 2027   0714-35   
54 I90 Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line $6,510,000 Not Selected NA
54 Hwy 60 Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster $2,130,000 Not Selected Address this pavement with adjacent work
53 US Hwy 169 Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 $9,660,000 Not Selected NA
48 US Hwy 169 Medium mill and overlay from US Hwy 14 to Hwy 99 $8,900,000 Not Selected NA
45 Hwy 60 Minor CPR and Diamond Grinding from Alder St to Hwy 62 $2,940,000 Not Selected NA
44 Hwy 60 Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake $18,820,000 Not Selected NA
40 US Hwy 14 Thin mill and overlay from Palmer Ave to Garden St in New Ulm $1,720,000 Not Selected NA
35 US Hwy 169 Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 $770,000 Not Selected NA
34 Hwy 22 Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) $1,370,000 Not Selected NA
34 US Hwy 169 Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 $350,000 Not Selected NA
33 I90 Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 $4,510,000 Not Selected NA
33 I90 Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area $5,940,000 Not Selected NA
33 I90 Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 $10,260,000 Not Selected NA
33 I90 Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge $6,380,000 Not Selected NA
33 I90 Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 $2,330,000 Not Selected NA
29 Hwy 23 Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper $50,000 Not Selected NA
29 Hwy 60 Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge $16,220,000 Not Selected NA
26 Hwy 15 Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 $160,000 Not Selected NA
25 I90 Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 $2,050,000 Not Selected NA
25 I90 Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 $2,050,000 Not Selected NA
19 Hwy 23 Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper $8,810,000 Not Selected NA
19 US Hwy 169 Thin mill and overlay from Iowa border to Faribault County Road 52 $3,050,000 Not Selected NA
18 US Hwy 169 Reconstruction from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter $3,260,000 Not Selected Addressing pavements with intersection reconfiguration as part of safety and mobility project
15 US Hwy 14 Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye $1,700,000 Not Selected NA
15 US Hwy 71 Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 $350,000 Not Selected NA
14 Hwy 15 Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 $2,400,000 Not Selected NA
14 Hwy 60 Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave $100,000 Not Selected NA
14 Hwy 60 Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane $50,000 Not Selected NA
9 US Hwy 169 Thin mill and overlay from County Road 52 to 10th St in Blue Earth $260,000 Not Selected NA

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
94 I90 Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek $8,130,000 Not Selected Not a district priority, will continue to monitor pavement performance
94 I90 Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 $6,060,000 Not Selected NA
93 I90 Resurface I-90 from west of Hwy 169 to Hwy 22    $81,000,000   2023   2280-143   
87 I90 Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting   $2,000,000   2032 5380-1101713    
86 US Hwy 14 Resurface Hwy 14 from Lookout Dr to Victory Dr; replace bridges 07023, 07011, 07009, and 07010; replace or improve drainage, signing and lighting   $25,000,000   2032 0702-1101714    
85 US Hwy 169 Repair from north Jct Hwy 93 to rest area at Le Sueur   $4,000,000   2030 4013-1071563    
84 I90 Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 $5,400,000 Not Selected Not a district priority, will continue to monitor pavement performance
84 I90 Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab bridge 9690; replaces bridges 9774, 67802, and 67806; replace or improve signing and lighting   $3,230,000   2032 6780-1101707    
83 I90 Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 $7,320,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Resurface WB lanes from Adrian to Rushmore    $6,500,000   2026 5380-154    
83 I90 Resurface WB lanes from CR 5 in Jackson to CR 12 near Rushmore   $11,500,000   2030 3280-1052560    
83 I90 Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 $4,740,000 Not Selected NA
82 Hwy 60 Resurface EB lanes from Worthington to Heron Lake and Heron Lake to Wilder   $18,200,000   2029 3204-70    
82 Hwy 60 Recondition WB lanes from Windom to Worthington and EB lanes from Windom to Wilder and on Heron Lake bypass   $18,200,000   2029 3204    
82 Hwy 60 Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 $1,500,000 NA NA
82 US Hwy 169 Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 $3,900,000 Not Selected NA
82 US Hwy 169 Medium mill and overlay northbound lanes from Union St to Hwy 93 $1,820,000 Not Selected NA
81 US Hwy 169 Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge $19,880,000 Not Selected NA
80 Hwy 60 Resurface from Lake Crystal to Cray Corner/528th Avenue   $6,900,000   2030 0708-1071483    
80 US Hwy 14 Repair from CR 3 to 2 miles east of Eagle Lake    $5,800,000   2028 0702-128    
80 US Hwy 14 Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass $11,900,000 Not Selected NA
79 Hwy 60 Medium mill and overlay westbound lanes from County Road 47 to I-90 $3,670,000 Not Selected NA
79 US Hwy 71 Resurface from Iowa border to CR 38 in Jackson    $6,500,000   2030 3205-36    
78 I90 Resurface WB lanes from Hwy 4 to Hwy 86   $10,000,000   2031 3280-1069643    
78 I90 Cold in place recycling and medium overlay westbound lanes from Hwy 4 to 2.5 miles east of Hwy 86 $9,750,000 Not Selected NA
78 I90 Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 $10,500,000 Not Selected NA
78 Hwy 15 Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm $870,000 Not Selected NA
78 Hwy 60 Repair pavement on Mountain Lake bypass    $6,600,000   2028 1703-82    
78 Hwy 60 Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair bridge    $16,800,000   2025, 2026   0708-47; Extensive pavement deterioration
78 Hwy 60 Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. $2,510,000 Not Selected NA
77 Hwy 60 Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder $2,430,000 NA NA
76 US Hwy 14 Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr $8,140,000 Not Selected NA
75 Hwy 60 Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge.  $14,800,000 Not Selected NA
74 Hwy 60 Medium mill and overlay from Nobles County Road 4 to north of I-90 $12,400,000 Not Selected NA
74 Hwy 60 Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge $7,310,000 Not Selected NA
73 Hwy 22 Resurface Hwy 22 from Hwy 14 to CR 26; replace or improve drainage - Future Project   $1,800,000   2033 0714-1101719    
73 US Hwy 14 Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line $10,070,000 Not Selected NA
73 US Hwy 169 Unbonded overlay from Minnesota River to US Hwy 14 $59,800,000 2027-2028 0713-81 bridge project
73 US Hwy 169 Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 $4,660,000 Not Selected NA
73 US Hwy 169 Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago $4,280,000 Not Selected NA
73 US Hwy 71 Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) $6,140,000 Not Selected NA
71 Hwy 15 Resurface Hwy 15 from Watonwan/Martin County line to south jct Hwy 60/Hwy 15; lighting and snowfence   $7,100,000   2024   8303-48; Aligning with bridge needs
71 Hwy 60 Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake $1,590,000 Not Selected NA
71 Hwy 60 Medium mill and overlay from Iowa Border to Nobles County Road 4 $2,980,000 Not Selected NA
71 Hwy 60 Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 $1,090,000 Not Selected NA
71 US59 Thick overlay from 27th St north to Hwy 62 $10,990,000 Not Selected NA
70 Hwy 15 Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St $11,870,000 Not Selected NA
69 Hwy 15 Medium mill and overlay from 4th St to Goemann Rd $260,000 Not Selected NA
68 US Hwy 14 Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. $10,780,000 Not Selected NA
67 US Hwy 14 Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill $3,190,000 Not Selected NA
67 US Hwy 169 Medium mill and overlay from  Faribault County Road 52 to .17 miles north of Faribault County Road 52 $60,000 Not Selected NA
66 US Hwy 14 Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm $4,910,000 Not Selected NA
63 Hwy 15 Medium mill and overlay from Goemann Rd to Brown/Watonwan County line $5,790,000 Not Selected NA
62 Hwy 60 Resurface WB lanes between St. James and Butterfield    $2,700,000   2027 8308-115    
61 US59 Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington $90,000 Not Selected NA
58 I90 Thin mill and overlay from Rock River to Rock/Nobles County Line $2,450,000 Not Selected NA
58 Hwy 22 Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22.    $37,148,889   2025, 2026, Future   0714-35   
54 I90 Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line $6,510,000 Not Selected NA
54 Hwy 60 Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster $2,130,000 Not Selected Address this pavement with adjacent work
53 US Hwy 169 Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 $9,660,000 Not Selected NA
48 US Hwy 169 Medium mill and overlay from US Hwy 14 to Hwy 99 $8,900,000 Not Selected NA
45 Hwy 60 Minor CPR and Diamond Grinding from Alder St to Hwy 62 $2,940,000 Not Selected NA
44 Hwy 60 Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake $18,820,000 Not Selected NA
40 US Hwy 14 Thin mill and overlay from Palmer Ave to Garden St in New Ulm $1,720,000 Not Selected NA
35 US Hwy 169 Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 $770,000 Not Selected NA
34 Hwy 22 Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) $1,370,000 Not Selected NA
34 US Hwy 169 Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 $350,000 Not Selected NA
33 I90 Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 $4,510,000 Not Selected NA
33 I90 Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area $5,940,000 Not Selected NA
33 I90 Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 $10,260,000 Not Selected NA
33 I90 Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge $6,380,000 Not Selected NA
33 I90 Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 $2,330,000 Not Selected NA
29 Hwy 23 Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper $50,000 Not Selected NA
29 Hwy 60 Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge $16,220,000 Not Selected NA
26 Hwy 15 Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 $160,000 Not Selected NA
25 I90 Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 $2,050,000 Not Selected NA
25 I90 Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 $2,050,000 Not Selected NA
19 Hwy 23 Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper $8,810,000 Not Selected NA
19 US Hwy 169 Thin mill and overlay from Iowa border to Faribault County Road 52 $3,050,000 Not Selected NA
18 US Hwy 169 Reconstruction from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter $3,260,000 Not Selected Addressing pavements with intersection reconfiguration as part of safety and mobility project
15 US Hwy 14 Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye $1,700,000 Not Selected NA
15 US Hwy 71 Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 $350,000 Not Selected NA
14 Hwy 15 Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 $2,400,000 Not Selected NA
14 Hwy 60 Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave $100,000 Not Selected NA
14 Hwy 60 Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane $50,000 Not Selected NA
9 US Hwy 169 Thin mill and overlay from County Road 52 to 10th St in Blue Earth $260,000 Not Selected NA

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
94 I90 Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 $6,060,000 2029
94 I90 Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek $8,130,000 Not Selected Not a district priority, will continue to monitor pavement performance
94 I90 Medium mill and overlay eastbound lanes from Rock County Road 4 to Rock River $4,580,000 Not Selected Not a district priority, will continue to monitor pavement performance
93 I90 Thick overlay from 2 miles west of US 169 to Hwy 22 $28,400,000 2026 2280-143
92 I90 Cold in place recycling and medium overlay westbound lanes from Jackson County Road 5 bridge to 1.54 miles east of Hwy 60 $3,650,000 2029
86 US Hwy 14 Major CPR and diamond grinding from west of Hwy 22 to .15 miles east of the eastern junction with Hwy 60 $9,800,000 2026 0702-128
85 US Hwy 169 Major CPR and diamond grinding from Commerce St to Le Sueur County Road 28 in Le Sueur $3,600,000 2030 NA 
84 I90 Thick overlay from South Dakota Border to County Road 4 at Beaver Creek $5,790,000 2022 6780-124
84 I90 Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 $5,400,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Cold in place recycling eastbound lanes from Hwy 4 to Hwy 15 $4,900,000 2022 4680-132
83 I90 Medium mill and overlay westbound lanes from east of Nobles County Road 13 to Minnesota Southern Railroad Bridge $3,670,000 2026 5380-154
83 I90 Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 $7,320,000 Not Selected Not a district priority, will continue to monitor pavement performance
83 I90 Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 $4,740,000 2029
82 US Hwy 169 Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 $3,900,000 Not Selected
82 US Hwy 169 Medium mill and overlay northbound lanes from Union St to Hwy 93 $1,820,000 Not Selected
82 Hwy 60 Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 $1,500,000 2029 NA 
81 US Hwy 169 Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge $19,880,000 Not Selected
80 US Hwy 14 Unbonded overlay from west of Lookout Bridge to west of Hwy 22 $19,540,000 Not Selected
80 US Hwy 14 Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass $11,900,000 Not Selected NA 
80 Hwy 60 Medium mill and overlay from east of Laclaire St to 2 miles west of US Hwy 169 (Cray Corner) $3,090,000 2030 NA 
79 Hwy 60 Medium mill and overlay westbound lanes from County Road 47 to I-90 $3,670,000 Not Selected NA 
79 US Hwy 71 Medium mill and overlay from Iowa Border to Riverside Dr in Jackson $3,990,000 2030 3205-36
78 Hwy 15 Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm $870,000 Not Selected
78 Hwy 60 Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. $2,510,000 Not Selected
78 I90 Cold in place recycling and medium overlay westbound lanes from Hwy 4 to 2.5 miles east of Hwy 86 $9,750,000 2031 NA 
78 I90 Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 $10,500,000 Not Selected NA 
77 Hwy 60 Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder $2,430,000 2030 NA 
77 I90 Medium mill and overlay eastbound lanes from Rock/Nobles County line to Nobles County Road 35/Minnesota Southern Railroad Bridge $2,600,000 Not Selected NA 
76 US Hwy 14 Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr $8,140,000 Not Selected NA 
75 US Hwy 14 Rural reconstruction from Hwy 15 to 2 miles west of Hwy 111 $39,800,000 2022 Four-lane expansion project
75 Hwy 60 Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge.  $14,800,000 Not Selected NA 
75 Hwy 60 Medium mill and overlay from 16th St to John Caldwell Dr/490th Ave $5,120,000 2031 Windom reconstruct
74 Hwy 60 White top overlay westbound lanes from .4 miles east of Cottonwood County Road 47 to .3 miles west of Cottonwood County Road 47 near Mountain Lake $480,000 2028 NA 
74 Hwy 60 Reconstruction from Blue Earth County Road 20 to northeast of Laclaire St in Lake Crystal $15,580,000 2024 0708-47
74 Hwy 60 Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge $7,310,000 Not Selected NA 
74 Hwy 60 Medium mill and overlay from Nobles County Road 4 to north of I-90 $12,400,000 Not Selected NA 
73 US Hwy 14 Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line $10,070,000 Not Selected NA 
73 US Hwy 169 Unbonded overlay from Minnesota River to US Hwy 14 $8,680,000 2027 0713-81
73 US Hwy 169 Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago $4,280,000 Not Selected NA 
73 US Hwy 169 Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 $4,660,000 Not Selected NA 
73 US Hwy 71 Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) $6,140,000 Not Selected NA 
71 US59 Thick overlay from 27th St north to Hwy 62 $10,990,000 Not Selected NA 
71 Hwy 60 Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 $1,090,000 Not Selected NA 
71 Hwy 60 Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake $1,590,000 Not Selected NA 
71 Hwy 60 Medium mill and overlay from Iowa Border to Nobles County Road 4 $2,980,000 Not Selected NA 
70 Hwy 15 Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St $11,870,000 Not Selected NA 
70 Hwy 22 Reconstruction from Le Sueur County Road 102 to north end of Hwy River bridge $7,880,000 2024 0714-35
69 Hwy 15 Medium mill and overlay from 4th St to Goemann Rd $260,000 Not Selected NA 
68 US Hwy 14 Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. $10,780,000 Not Selected NA 
67 US Hwy 14 Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill $3,190,000 Not Selected NA 
67 US Hwy 169 Medium mill and overlay from  Faribault County Road 52 to .17 miles north of Faribault County Road 52 $60,000 Not Selected NA 
66 US Hwy 14 Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm $4,910,000 Not Selected NA 
65 US Hwy 169 Thick overlay from Faribault County Road 12 to Blue Earth County Road 13 $4,540,000 2022 0712-113; Concrete expected to deteriorate at the joints at an accelerated rate
63 Hwy 15 Medium mill and overlay from Goemann Rd to Brown/Watonwan County line $5,790,000 Not Selected NA 
62 US Hwy 169 Medium overlay from Hwy 30 to Blue Earth County Road 13 $3,890,000 2022 0712-113; Concrete expected to deteriorate at the joints at an accelerated rate. Northern project limits are at southern city limits of Vernon Center
62 Hwy 60 Unbonded overlay from Watonwan County Road 5 to 1.4 miles west of junction with Hwy 4 $8,890,000 2028 Westbound lanes only.
61 Hwy 15 Cold in place recycling and medium overlay from Martin/Watonwan County line to 360th St $2,900,000 2023 8303-48; Aligning with bridge needs
61 US59 Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington $90,000 Not Selected NA 
61 US Hwy 71 Thick mill and overlay from Riverside Dr to Prospect St in Jackson $580,000 2030 3205-36; Pairing with adjacent project
60 Hwy 22 Reconstruction from Riverfront Dr to north end of Railroad Bridge $3,350,000 2024 0714-35; Pairing with adjacent project
58 Hwy 22 Unbonded overlay from US Hwy 14 to Blue Earth County Road 26 in Mankato $4,830,000 Not Selected NA 
58 US59 Major CPR and diamond grinding from I-90 to Prairie Dr in Worthington $420,000 2027 NA 
58 I90 Thin mill and overlay from Rock River to Rock/Nobles County Line $2,450,000 Not Selected NA 
54 Hwy 60 Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster $2,130,000 2029 Address this pavement with adjacent work
54 I90 Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line $6,510,000 Not Selected NA 
53 US Hwy 169 Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 $9,660,000 Not Selected NA 
76 Hwy 15 Unbonded overlay from west junction of Hwy 60 to east junction of Hwy 60 in Madelia $17,460,000 2022 8304-118
48 US Hwy 169 Medium mill and overlay from US Hwy 14 to Hwy 99 $8,900,000 Not Selected NA 
45 Hwy 60 Minor CPR and Diamond Grinding from Alder St to Hwy 62 $2,940,000 Not Selected NA 
44 Hwy 60 Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake $18,820,000 Not Selected NA 
42 US Hwy 14 Cold in place recycling and Medium overlay from US 71 to Springfield City limits $4,640,000 2022 NA 
40 US Hwy 14 Thin mill and overlay from Palmer Ave to Garden St in New Ulm $1,720,000 Not Selected NA 
35 US Hwy 169 Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 $770,000 Not Selected NA 
35 Hwy 22 Reconstruction from Railroad bridge to south of Blue Earth County Road 102 $9,260,000 2022 Project originally selected prior to project selection policy (in 2019-2022 STIP) Coordinating with another MnDOT project.
34 US Hwy 169 Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 $350,000 Not Selected NA 
34 Hwy 22 Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) $1,370,000 2024 NA 
33 I90 Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 $2,330,000 Not Selected NA 
33 I90 Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area $5,940,000 Not Selected NA 
33 I90 Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 $10,260,000 Not Selected NA 
33 I90 Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge $6,380,000 Not Selected NA 
33 I90 Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 $4,510,000 Not Selected NA 
29 Hwy 23 Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper $50,000 Not Selected NA 
29 Hwy 60 Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge $16,220,000 Not Selected NA 
26 Hwy 15 Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 $160,000 Not Selected NA 
25 I90 Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 $2,050,000 Not Selected NA 
25 I90 Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 $2,050,000 Not Selected NA 
19 US Hwy 169 Thin mill and overlay from Iowa border to Faribault County Road 52 $3,050,000 Not Selected NA 
19 Hwy 23 Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper $8,810,000 Not Selected NA 
18 US Hwy 169 Reconstruction from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter $3,260,000 2023 Addressing pavements with intersection reconfiguration as part of safety and mobility project
15 US Hwy 14 Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye $1,700,000 Not Selected NA 
15 US Hwy 71 Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 $350,000 Not Selected NA 
14 Hwy 15 Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 $2,400,000 Not Selected NA 
14 Hwy 60 Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane $50,000 Not Selected NA 
14 Hwy 60 Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave $100,000 Not Selected NA 
9 US Hwy 169 Thin mill and overlay from County Road 52 to 10th St in Blue Earth $260,000 Not Selected NA 