Increasing the transparency of how we select highway construction projects

National Highway System pavement projects

MnDOT District 2

Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.
Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.

Last updated November 2024

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
100 US Hwy 2 Resurface Hwy 2, east bound and west bound lanes in Cass Lake   $677,606   2024 1102-75   
88 US Hwy 2 Resurface Hwy 2, westbound lane from Shevlin to Wilton   $5,500,000   2033 0406-1101143    
84 US Hwy 2 Resurface the eastbound lanes of Hwy 2 between East Grand Forks and Fisher    $7,300,000   2034 6001-1038994    Scored in 2019
80 Hwy 371 Recondition Hwy 371 between Hackensack and Hwy 200  $6,500,000 Not Selected  Coordinating funding with another district
80 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fosston and Bagley   $16,000,000   2033 6005-80    Scored in 2019
77 Hwy 11 Resurface Hwy 11 from Karlstad to Kittson/Roseau County line   $6,500,000   2034 3503-1101187    
77 US Hwy 2 Resurface Hwy 2 between Wilton and Bemidji    $2,800,000   Not Selected 0406-1038659    Scored in 2019
77 US Hwy 59 Resurface Hwy 59 between Hwy 2 and Brooks and replace a box culvert near Brooks   $8,000,000   2032 6009-1073503    Scored in 2019
75 Hwy 11 Resurface Hwy 11 between Hwy /ND border and Karlstad  $9,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Hwy 59 and Fosston    $4,200,000   2029 6005-79    Scored in 2019
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Polk County Road 44 and Hwy 32  $3,600,000 Not Selected  2020 Construction. Not a district priority, will continue to monitor pavement performance 
74 US Hwy 71 Resurface Hwy 71 from Movil Lake Road to CR 23/CR 21 in Turtle River    $7,200,000   2034 0410-54    Scored in 2019
73 Hwy 11 Resurface Hwy 11 between west of CR 2 in Williams to CR 61 east of Williams    $3,200,000   2028   3901-44   
71 US Hwy 2 Resurface Hwy 2 between the Cass CO line and Itasca County Road 18  $6,800,000 Not Selected  2020 Construction Not a district priority, will continue to monitor pavement performance 
70 US Hwy 2 Resurface Hwy 2 between Hwy 75 and Groveland Ave in Crookston    $5,000,000   2029 6002-83    
70 US Hwy 2 Resurface eastbound lanes of Hwy 2 between Fosston and Bagley    $14,000,000   2034 6005-69    Scored in 2019
70 US Hwy 71 Resurface Hwy 71 between Turtle River and Tenstrike    $9,700,000   2026   0410-51   Scored in 2019
70 US Hwy 71 Resurface Hwy 71 from Tenstrike to Blackduck and resurface one mile of Hwy 72 north of Blackduck   $9,600,000   2028   0410-53   
69 Hwy 11 Resurface Hwy 11 between Warroad and Roosevelt and replace three box culverts    $16,200,000   2028   6804-28   
68 Hwy 371 Resurface Hwy 371 between Walker and Cass Lake   $14,150,000   Not Selected 1120-1073343    Scored in 2020
68 Hwy 371 Resurface Hwy 371 from Steamboat River Bridge to Cass Lake   $14,200,000   2033 1120-1123303    
67 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fisher and Hwy 75 $2,800,000 Not Selected  Constructed in 2022 under SP 6001-67
66 US Hwy 71 Resurface Hwy 71 between Itasca County line and Koochiching CR 50    $3,645,000   2034 3610-1089743    
66 US Hwy 71 Resurface Hwy 71 from south of CR 9 to south of the Beltrami/Hubbard county line   $800,000   Not Selected 2907-1101203    
66 US Hwy 71 Resurface Hwy 71, northbound and southbound lanes from south of the Beltrami/Hubbard County line to Hwy71/Hwy 2   $1,300,000   Not Selected 0409-1101190    
65 Hwy 34 Resurface Hwy 34 between Hubbard County Road 4 and Akeley  $5,200,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
64 Hwy 11 Recondition Hwy 11 between Williams and Lake of the Woods County Road 166  $7,000,000 Not Selected  Not a district priority, will continue to monitor pavement performance 
64 Hwy 11 Resurface Hwy 11 between Lake of the Woods County Road 166 and Baudette  $2,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
64 Hwy 11 Resurface Hwy 11 from east of Williams to 7.6 miles west of Hwy 172    $6,900,000   2033 3901-1123283    
62 Hwy 11 Resurface Hwy 11 between Kittson Co line and Greenbush  $3,600,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 11 Resurface Hwy 11 between Roseau CO line and Williams  $2,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
58 Hwy 34 Resurface Hwy 34 from Hwy 64 in Akeley to Hwy 371 in Walker   $1,700,000   2030 1105-10    
49 Hwy 11 Reconstruct Hwy 11 between Roseau and Warroad    $22,300,000   2026, 2027   6803-43   
40 Hwy 11 Resurface Hwy 11 between Roseau County Road 111 and Roseau County Road 15  $4,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
39 Hwy 32 Resurface Hwy 32 between Thief River Falls and Middle River  $7,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
36 Hwy 11 Resurface Hwy 11 between Roseau County Road 15 and Roseau  $1,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
34 US Hwy 2 Resurface Hwy 2 between Itasca County Road 18 and Deer River  $1,800,000 Not Selected  Coordinating funding with another district
33 Hwy 11 Resurface Hwy 11 between Hwy 32 and Roseau County Road 111  $2,400,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
33 US Hwy 71 Resurface Hwy 71 between Margie and Big Falls    $1,794,000   Not Selected 3611-1089723    
28 US Hwy 71 Resurface Hwy 71 between Lake George and Kabekona   $3,400,000   Not Selected 2906-1073383    Scored in 2020. RQI forecast does not match on the ground conditions

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
88 US Hwy 2 Resurface Hwy 2, westbound lane from Shevlin to Wilton   $3,500,000   2033 0406-1101143    
84 US Hwy 2 Resurface the eastbound lanes of Hwy 2 between East Grand Forks and Fisher    $7,300,000   2033 6001-1038994    Scored in 2019
80 Hwy 371 Recondition Hwy 371 between Hackensack and Hwy 200  $6,500,000 Not Selected  Coordinating funding with another district
80 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fosston and Bagley   $8,800,000   2033 1502-1039094    Scored in 2019
77 Hwy 11 Resurface Hwy 11 from Karlstad to Kittson/Roseau County line   $6,500,000   2033 3503-1101187    
77 US Hwy 2 Resurface Hwy 2 between Wilton and Bemidji    $1,200,000 2023 0406-68    
77 US Hwy 59 Resurface Hwy 59 between Hwy 2 and Brooks and replace a box culvert near Brooks   $7,100,000   2031 6009-1073503    Scored in 2019
75 Hwy 11 Resurface Hwy 11 between Hwy /ND border and Karlstad  $9,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Hwy 59 and Fosston    $5,000,000   2029 6005-79    Scored in 2019
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Polk County Road 44 and Hwy 32  $3,600,000 Not Selected  2020 Construction. Not a district priority, will continue to monitor pavement performance 
74 US Hwy 59 Resurface Hwy 59 between Pennington CR 53 and Thief River Falls and construct a roundabout at the intersection of Hwy 59 with Pennington CR 3   $8,679,068   2023 5705-61   
74 US Hwy 71 Resurface six miles of Hwy 71 between Beltrami CR 15 and CR 22    $3,600,000   Not selected 0410-54    Scored in 2019
73 Hwy 11 Resurface Hwy 11 from west of Williams to 9.2 miles west of Williams   $6,900,000   2033 3901-44    
71 US Hwy 2 Resurface Hwy 2 between the Cass CO line and Itasca County Road 18  $6,800,000 Not Selected  2020 Construction Not a district priority, will continue to monitor pavement performance 
70 US Hwy 2 Resurface Hwy 2 between Hwy 75 and Groveland Ave in Crookston    $2,700,000   2029 6002-83    
70 US Hwy 2 Resurface eastbound lanes of Hwy 2 between Fosston and Bagley  $5,900,000 Not Selected Scored in 2019
70 US Hwy 71 Resurface Hwy 71 from Tenstrike to Blackduck and resurface one mile of Hwy 72 north of Blackduck   $5,300,000   2028 0410-53    
70 US Hwy 71 Resurface Hwy 71 between Turtle River and Tenstrike    $9,300,000   2026   0410-51   Scored in 2019
69 Hwy 11 Resurface Hwy 11 between Warroad and Roosevelt    $7,000,000   2028 6804-28    
68 Hwy 32 Resurface Hwy 32 between Middle River and Greenbush; replace four box culverts near Strathcona   $13,890,143   2024 4504-19   
68 Hwy 371 Resurface Hwy 371 between Walker and Cass Lake   $14,150,000   Not Selected 1120-1073343    Scored in 2020
67 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fisher and Hwy 75 $2,800,000 Not Selected  Constructed in 2022 under SP 6001-67
66 US Hwy 71 Resurface Hwy 71 between Itasca County line and Koochiching CR 50    $3,505,000   2033 3610-1089743    
66 US Hwy 71 Resurface Hwy 71 from south of CR 9 to south of the Beltrami/Hubbard county line   $800,000   Not Selected 2907-1101203    
66 US Hwy 71 Resurface Hwy 71, northbound and southbound lanes from south of the Beltrami/Hubbard County line to Hwy71/Hwy 2   $1,300,000   Not Selected 0409-1101190    
65 Hwy 34 Resurface Hwy 34 between Hubbard County Road 4 and Akeley  $5,200,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
64 Hwy 11 Recondition Hwy 11 between Williams and Lake of the Woods County Road 166  $7,000,000 Not Selected  Not a district priority, will continue to monitor pavement performance 
64 Hwy 11 Resurface Hwy 11 between Lake of the Woods County Road 166 and Baudette  $2,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
63 US Hwy 71 Resurface Hwy 71 between East Movil Lake Road to Turtle River   $598,327   2023 0410-55   
62 Hwy 11 Resurface Hwy 11 between Kittson Co line and Greenbush  $3,600,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 11 Resurface Hwy 11 between Roseau CO line and Williams  $2,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
62 US Hwy 71 Resurface Hwy 71 from north of Night Hawk road in Lake George to Hwy 200 (Kabekona)   $600,000 2023 2906-19  
58 Hwy 34 Resurface Hwy 34 from Hubbard/Cass County line to Lake May Drive in Walker   $6,000,000   2032 1105-10    
49 Hwy 11 Reconstruct Hwy 11 between Roseau and Warroad    $24,100,000   2027   6803-43   
40 Hwy 11 Resurface Hwy 11 between Roseau County Road 111 and Roseau County Road 15  $4,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
39 Hwy 32 Resurface Hwy 32 between Thief River Falls and Middle River  $7,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
36 Hwy 11 Resurface Hwy 11 between Roseau County Road 15 and Roseau  $1,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
34 US Hwy 2 Resurface Hwy 2 between Itasca County Road 18 and Deer River  $1,800,000 Not Selected  Coordinating funding with another district
33 Hwy 11 Resurface Hwy 11 between Hwy 32 and Roseau County Road 111  $2,400,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
33 US Hwy 71 Resurface Hwy 71 between Margie and Big Falls    $1,794,000   Not Selected 3611-1089723    

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
88 US Hwy 2 Resurface Hwy 2, westbound lane from Shevlin to Wilton   $3,700,000   2032 0406-1101143    
84 US Hwy 2 Resurface the eastbound lanes of Hwy 2 between East Grand Forks and Fisher    $7,300,000   2030 6001-1038994    Scored in 2019
80 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fosston and Bagley   $7,000,000   2030 1502-1039094    Scored in 2019
80 Hwy 371 Recondition Hwy 371 between Hackensack and Hwy 200  $6,500,000 Not Selected  Coordinating funding with another district
77 US Hwy 2 Resurface Hwy 2 between Wilton and Bemidji    $2,800,000   2029 0406-1038659    Scored in 2019
77 US Hwy 59 Resurface Hwy 59 between Hwy 2 and Brooks and replace a box culvert near Brooks   $7,400,000   2031 6009-1073503    Scored in 2019
77 Hwy 11 Resurface Hwy 11 from Karlstad to Kittson/Roseau County line   $6,700,000   2032 3503-1101187
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Hwy 59 and Fosston    $4,200,000   2028 6005-79    Scored in 2019
75 Hwy 11 Resurface Hwy 11 between Hwy /ND border and Karlstad  $9,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Polk County Road 44 and Hwy 32  $3,600,000 Not Selected  2020 Construction. Not a district priority, will continue to monitor pavement performance 
74 US Hwy 71 Resurface Hwy 71 between East Movil Lake Road to Turtle River   $3,600,000   2028 0410-54    Scored in 2019
74 US Hwy 59 Resurface Hwy 59 between Brooks and Pennington CR 2   $3,089,344   2023   5705-63   Scored in 2019
74 US Hwy 59 Resurface Hwy 59 between Pennington CR 53 and Thief River Falls and construct a roundabout at the intersection of Hwy 59 with Pennington CR 3   $9,110,000   2023   5705-61   
73 Hwy 11 Resurface Hwy 11 from west of Williams to 9.2 miles west of Williams   $6,900,000   2032 3901-44    
71 US Hwy 2 Resurface Hwy 2 between the Cass CO line and Itasca County Road 18  $6,800,000 Not Selected  2020 Construction Not a district priority, will continue to monitor pavement performance 
70 US Hwy 71 Resurface Hwy 71 from Tenstrike to Blackduck and resurface one miile of Hwy 72 north of Blackduck $4,900,000   2028 0410-53    
70 US Hwy 2 Resurface Hwy 2 between Hwy 75 and Groveland Ave in Crookston    $2,000,000   2029 6001-1089603    
70 US Hwy 2 Resurface Hwy 2 in Bena   $3,400,000   2023   1102-71   
70 US Hwy 71 Resurface Hwy 71 between Turtle River and Tenstrike    $11,400,000   2026   0410-51   Scored in 2019
70 US Hwy 2 Resurface eastbound lanes of Hwy 2 between Fosston and Bagley  $5,900,000 Not Selected Scored in 2019
69 Hwy 11 Resurface Hwy 11 between Warroad and Roosevelt    $6,000,000   2028 6804-28    
68 Hwy 371 Resurface Hwy 371 between Walker and Cass Lake   $14,150,000   2032 1120-1073343    Scored in 2020
68 Hwy 32 Resurface Hwy 32 between Middle River and Greenbush; replace four box culverts near Strathcona   $13,600,000   2024   4504-19   
67 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fisher and Hwy 75 $2,800,000 2022 6001-67 
66 US Hwy 71 Resurface Hwy 71 between Itasca County line and Koochiching CR 50    $2,979,000   2029 3610-1089743    
66 US Hwy 71 Resurface Hwy 71 from south of CR 9 to south of the Beltrami/Hubbard county line   $800,000   2032 2907-1101203    
66 US Hwy 71 Resurface Hwy 71, northbound and southbound lanes from south of the Beltrami/Hubbard County line to Hwy71/Hwy 2   $1,300,000   2032 0409-1101190    
65 Hwy 34 Resurface Hwy 34 between Hubbard County Road 4 and Akeley  $5,200,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
64 Hwy 11 Recondition Hwy 11 between Williams and Lake of the Woods County Road 166  $7,000,000 Not Selected  Not a district priority, will continue to monitor pavement performance 
64 Hwy 11 Resurface Hwy 11 between Lake of the Woods County Road 166 and Baudette  $2,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
62 US Hwy 71 Resurface Hwy 71 from north of Night Hawk road in Lake George to Hwy 200 (Kabekona)   $600,000 2023 2906-19    
62 Hwy 11 Resurface Hwy 11 between Kittson Co line and Greenbush  $3,600,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 11 Resurface Hwy 11 between Roseau CO line and Williams  $2,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
58 Hwy 34 Resurface Hwy 34 from Hubbard/Cass County line to Lake May Drive in Walker   $6,000,000   2032 1105-10    
49 Hwy 11 Reconstruct Hwy 11 between Roseau and Warroad    $18,100,000   2027 6803-43    
40 Hwy 11 Resurface Hwy 11 between Roseau County Road 111 and Roseau County Road 15  $4,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
39 Hwy 32 Resurface Hwy 32 between Thief River Falls and Middle River  $7,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
36 Hwy 11 Resurface Hwy 11 between Roseau County Road 15 and Roseau  $1,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
34 US Hwy 2 Resurface Hwy 2 between Itasca County Road 18 and Deer River  $1,800,000 Not Selected  Coordinating funding with another district
33 US Hwy 71 Resurface Hwy 71 between Margie and Big Falls    $1,794,000   2029 3611-1089723    
33 Hwy 11 Resurface Hwy 11 between Hwy 32 and Roseau County Road 111  $2,400,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
25 Hwy 34 Reconstruct Hwy 34 in Akeley   $3,800,000   2023   2902-44   Selected prior to the adoption of the scoring policy

 

View more detailed scores (Excel).

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
84 US Hwy 2 Resurface the eastbound lanes of Hwy 2 between East Grand Forks and Fisher  $5,700,000 2030 6001-1038994 Scored in 2019
80 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fosston and Bagley  $7,700,000 2030 1502-1039094 Scored in 2019
80 Hwy 371 Recondition Hwy 371 between Hackensack and Hwy 200  $6,500,000 Not Selected  Coordinating funding with another district
80 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fosston and Bagley  $900,000 2030 1502-1039094 Scored in 2019
77 US Hwy 59 Resurface Hwy 59 between Hwy 2 and Brooks  $5,500,000 2031 6009-1073503 Scored in 2019
77 US Hwy 2 Resurface Hwy 2 between Bemidji and Wilton  $3,100,000 2029 0406-1038659 Scored in 2019
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fosston and Hwy 59  $4,800,000 2028 6005-1038567 Scored in 2019
75 US Hwy 2 Resurface westbound lanes of Hwy 2 between Polk County Road 44 and Hwy 32  $3,600,000 Not Selected  2020 Construction. Not a district priority, will continue to monitor pavement performance 
75 Hwy 11 Resurface Hwy 11 between Hwy /ND border and Karlstad  $9,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
74 US Hwy 71 Resurface five miles of Hwy 71 between Beltrami County Rd 15 and County Rd 22  $3,700,000 2028 0410-1038874 Scored in 2019
71 US Hwy 2 Resurface Hwy 2 between the Cass CO line and Itasca County Road 18  $6,800,000 Not Selected  2020 Construction Not a district priority, will continue to monitor pavement performance 
70 US Hwy 71 Resurface Hwy 71 between Beltrami County Rd 22 and Blackduck  $6,000,000 2026 0410-51 Scored in 2019
70 US Hwy 2 Resurface Hwy 2 between Cass Lake and Cass County Road 10  $2,400,000 2022 SP 1102-69 Selected prior to adoption of scoring policy 
70 US Hwy 2 Resurface Hwy 2 between Hwy 75 and Groveland Ave in Crookston  $1,900,000 2029 6001-1089603
70 US Hwy 2 Resurface eastbound lanes of Hwy 2 between Fosston and Bagley  $5,900,000 2028 6005-1038233 Scored in 2019
69 Hwy 11 Resurface Hwy 11 between Warroad and Roosevelt  $5,700,000 2028 6804-1038988
68 Hwy 371 Resurface Hwy 371 between Walker and Cass Lake  $6,800,000 2031 1120-1073343 Scored in 2020
68 Hwy 32 Resurface Hwy 32 between Middle River and Greenbush; replace four box culverts near Strathcona  $10,700,000 2025 SP 4504-19
67 US Hwy 2 Resurface Hwy 2 between Hwy 9 and Hwy 32  $4,400,000 2022 SP 6003-36 Selected prior to the adoption of the scoring policy
67 US Hwy 2 Resurface westbound lanes of Hwy 2 between Fisher and Hwy 75  $4,200,000 Not Selected  6001-67 Project being developed for future construction.
66 US Hwy 71 Resurface Hwy 71 and intersection improvements between Hwy 197 Beltrami County Road 59  $5,200,000 2022 0410-50
66 US Hwy 71 Resurface Hwy 71 between Itasca County line and Koochiching County Road 50  $3,200,000 2029 3610-1089743
65 Hwy 34 Resurface Hwy 34 between Hubbard County Road 4 and Akeley  $5,200,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
64 Hwy 11 Recondition Hwy 11 between Williams and Lake of the Woods County Road 166  $7,000,000 Not Selected  Not a district priority, will continue to monitor pavement performance 
64 Hwy 11 Resurface Hwy 11 between Lake of the Woods County Road 166 and Baudette  $2,700,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 59 Resurface Hwy 59 between Brooks and Thief River Falls  $8,200,000 2023 SP 5705-61/63 Scored in 2019
64 Hwy 371 Resurface Hwy 371 between Hwy 200 and Walker  $1,700,000 2028 SP 1119-42 Scored in 2020
62 Hwy 11 Resurface Hwy 11 between Kittson Co line and Greenbush  $3,600,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 11 Resurface Hwy 11 between Roseau CO line and Williams  $2,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
58 Hwy 34 Resurface Hwy 34 between Akeley and Walker  $5,100,000 2031 SP 1105-10
57 Hwy 34 Resurface and widen shoulders from Hubbard County Road 26/County Road 47 to Park Rapids. Funded by District 2 and District 4  $2,100,000 2024 SP 2901-21 Tied to a rural pavement project
49 Hwy 11 Reconstruct Hwy 11 between Roseau and Warroad   $12,700,000 2027 SP 6803-43
40 Hwy 11 Resurface Hwy 11 between Roseau County Road 111 and Roseau County Road 15  $4,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
39 Hwy 32 Resurface Hwy 32 between Thief River Falls and Middle River  $7,300,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
37 US Hwy 2 Reconstruct Hwy 2 between Hwy 59 and Fosston  $27,000,000 2022 SP 6005-68 Selected prior to the adoption of the scoring policy
36 Hwy 11 Resurface Hwy 11 between Roseau County Road 15 and Roseau  $1,000,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
34 US Hwy 2 Resurface Hwy 2 between Itasca County Road 18 and Deer River  $1,800,000 Not Selected  Coordinating funding with another district
33 US Hwy 71 Resurface Hwy 71 between Margie and Big Falls  $1,900,000 2029 3611-1089723
33 Hwy 11 Resurface Hwy 11 between Hwy 32 and Roseau County Road 111  $2,400,000 Not Selected  District does not expect pavement segment to deteriorate as fast as model predicts 
31 Hwy 11 Resurface Hwy 11 between Karlstad and east Kittson County line  $2,800,000 Not Selected  Not a district priority, will continue to monitor pavement performance 
28 US Hwy 71 Resurface Hwy 71 between Lake George and Kabekona  $8,200,000 2031 2906-1073383 Scored in 2020. RQI forecast does not match on the ground conditions
24 US Hwy 2 Resurface Hwy 2 westbound lanes between East Grand Forks and Fisher  $8,800,000 2022 SP 6001-61 Selected prior to the adoption of the scoring policy.

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
84 US Hwy 2 Resurface eastbound lanes of Hwy 2 from East Grand Forks Fisher $5,400,000 2028 NA
81 US Hwy 2 Resurface westbound lanes of Hwy 2 from Fosston to Bagley $7,400,000 2028 NA
81 US Hwy 71 Resurface Hwy 71 from Beltrami County Road 22 to Hwy 72 $3,100,000 2026 NA
78 US Hwy 59 Resurface Hwy 59 from Hwy 2 to Brooks $2,800,000 2030 NA
75 US Hwy 2 Resurface westbound lanes of Hwy 2 from Hwy 59 to Fosston  $5,000,000 2027 NA
61 Hwy 11 Resurface Hwy 11 from Roseau to Hwy 313 $6,100,000 2025 NA
74 US Hwy 2 Resurface westbound lanes of Hwy 2 from East Grand Forks to Fisher $9,200,000 2021 NA
74 US Hwy 59 Resurface Hwy 59 from Brooks to Thief River Falls $4,300,000 2023 NA
74 US Hwy 71 Resurface Hwy 71 from Beltrami County Road 15 to Beltrami County Road 22 $1,900,000 2028 NA
73 US Hwy 2 Resurface westbound lanes of Hwy 2 from Fisher to Hwy 75 $2,000,000 2021 NA
73 US Hwy 2 Resurface Hwy 2 from the south Beltrami County line to Midge Lake $5,000,000 Not selected District does not expect pavement segments to deteriorate as fast as the model predicts
73 US Hwy 71 Resurface Hwy 71 from Hwy 197 to Beltrami County Road 15 $5,500,000 2022 NA
72 Hwy 34 Resurface Hwy 34 from the west Hubbard County line to Park Rapids $1,100,000 2024 NA
72 US Hwy 71 Resurface Hwy 71 from Menahga to the north Wadena County line $1,500,000 Not selected Coordinating funding with another district 
71 US Hwy 2 Resurface the eastbound lanes of Hwy 2 from Fosston to Bagley $6,100,000 2028 NA
69 US Hwy 2 Resurface Hwy 2 from Wilton to Beltrami County Road 11 $3,000,000 2028 NA
69 US Hwy 2 Resurface Hwy 2 from Cass Lake to Cass County Road 10 $1,000,000 2021 NA
69 Hwy 11 Resurface Hwy 11 from Warroad to east Roseau County line $2,900,000 2027 NA
69 Hwy 371 Resurface Hwy 371 from th Steamboat River Bridge to Cass Lake $2,100,000 2030 NA
66 US Hwy 2 Resurface eastbound lanes of Hwy 2 from Hwy 9 to Hwy 32 $5,800,000 2022 NA
66 US Hwy 2 Resurface Hwy 2 from the Mississippi River Bridge to Itasca County Road 18 $500,000 2021 NA
66 Hwy 11 Resurface Hwy 11 from Karlstad to east Kittson County line $2,200,000 Not selected Not a district priority, will continue to monitor pavement performance 
66 Hwy 34 Resurface Hwy 34 from Akeley to the west Cass County line $1,200,000 Not selected Waiting to coordinate with another project
66 US Hwy 71 Resurface Hwy 71 from the north Itasca County line to the north junction of Hwy 1 $1,800,000 Not selected Coordinating funding with another district 
65 Hwy 11 Resurface Hwy 11 from the North Dakota border to 1-mile to the east $300,000 Not selected Waiting to coordinate with another project
67 US Hwy 2 Resurface Hwy 2 from Cass Lake to Hubbard County Road 25 $2,400,000 2025 Majority of this project is in District 3
58 Hwy 11 Resurface Hwy 11 from Williams to Lake of the Woods County Road 66 $2,400,000 Not selected Not a district priority, will continue to monitor pavement performance 
57 US Hwy 59 Resurface Hwy 59 from Winger to Hwy 2 $1,500,000 2021 NA
53 Hwy 32 Resurface Hwy 32 from Middle River to Hwy 11 $5,200,000 2024 NA
53 Hwy 34 Resurface Hwy 34 from the west Cass County line to Hwy 371 $2,700,000 Not selected Coordinating funding with another district 
41 US Hwy 2 Reconstruct eastbound lanes of Hwy 2 from Hwy 32 to Erskine $48,700,000 2021 NA
36 US Hwy 2 Reconstruct eastbound lanes of Hwy 2 from Hwy 59 to Fosston $28,300,000 2022 NA
28 US Hwy 71 Resurface Hwy 71 from Lake George to Hwy 71 $1,700,000 2030 RQI forecast doesn't reflect on the ground conditions
18 US Hwy 2 Resurface the eastbound lanes of Hwy 2 from Fisher to Crookston $6,400,000 2030 RQI forecast doesn't reflect on the ground conditions
11 US Hwy 71 Resurface Hwy 71 from the north Wadena County line to Park Rapids $1,300,000 Not selected NA

 

Score Route Description High level construction cost estimate for planning purposes  Year Planned (FY) Comments
82 US Hwy 2 Major concrete rehabilitation eastbound from East Grand Forks to Fisher $11,000,000 2028  
78 US Hwy 2 Thin mill and overlay westbound from East Grand Forks to Fisher $12,000,000 2021  
78 US Hwy 2 Medium mill and overlay westbound lanes from Fosston to Bagley $9,500,000 2028  
76 US Hwy 2 Medium Mill and overlay from Fisher to Highway 75 $7,400,000 2029  
75 US Hwy 2 Medium mill and overlay from Wilton to Beltrami County Road 11 $4,600,000 2028  
75 US Hwy 59 Medium mill and overlay from from Highway 2 to Brooks $8,500,000 2029  
74 US Hwy 2 Full mill and thick overlay from Highway 9 to Highway 32 $6,200,000 2027  
73 US Hwy 2 Medium mill and overlay from Highway  59 to Fosston Golf Club Road $6,900,000 2027  
73 US Hwy 71 Reclaim and overlay from Park Rapids to Highway 200 $14,000,000 2029  
72 US Hwy 59 Medium mill and overlay from Brooks to Thief River Falls $11,000,000 2023  
72 US Hwy 71 Reclaim and overlay from Beltrami County Road 15 to Beltrami County Road 22 $6,200,000 2028  
71 US Hwy 71 Reclaim and overlay from Highway 197 to Beltrami County Road 15 $7,300,000 2022 NA
71 US Hwy 2 Medium mill and overlay from the south Beltrami County line to Midge Lake $8,000,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
70 Hwy 34 Reclaim and overlay from the west Hubbard County line to Park Rapids $3,100,000 2024 NA
68 US Hwy 71 Medium mill and overlay from Beltrami County Road 22 to Highway  72 $7,900,000 2024 NA
68 US Hwy 2 Medium mill and overlay from Perch Lake to Bagley $7,400,000 2027 NA
67 Hwy 11 Medium mill and overlay from Warroad to east Roseau County line $8,700,000 2027 NA
66 Hwy 32 Reclaim and overlay from Middle River to Highway  11 $14,000,000 2024 NA
65 US Hwy 2 Thin mill and overlay from Cass Lake to Hubbard County Road 25 $1,500,000 2025 NA
64 US Hwy 2 Thin mill and overlay from Crookston to Highway 9 $2,200,000 2025  
64 Hwy 11 Medium mill and overlay from the North Dakota border to 1-mile to the east $800,000 Not selected Waiting to coordinate with another project
64 Hwy 11 Medium mill and overlay from Karlstad to east Kittson County line $6,900,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
64 Hwy 34 Reclaim amd overlay from Akeley to the west Cass County line $3,500,000 Not selected Waiting to coordinate with another project
63 US Hwy 2 Medium mill and overlay from Crookston and Polk County Road 44 $6,100,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
62 US Hwy 2 Full mill and thick overlay from Polk County Road 44 to Highway 32 $4,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
62 US Hwy 59 Medium mill and overlay from Winger to Highway 2 $4,500,000 2021 Selected prior to policy (in 2019-2022 STIP)
59 Hwy 11 Reclaim and overlay from Roseau to Highway 313 $15,000,000 2025 Selected prior to policy (in 2019-2028 CHIP)
39 US Hwy 2 Reconstruction from from Highway 32 to Erskine $29,000,000 2021 Selected prior to policy (in 2019-2022 STIP)
33 US Hwy 2 Reconstruction from Highway 59 to Fosston $29,000,000 2022 Selected prior to policy (in 2019-2022 STIP)
27 Hwy 11 Medium mill and overlay from Williams to Lake of the Woods County Road 66 $7,500,000 Not selected NA
26 US Hwy 71 Medium mill and overlay from Lake George to Highway 71 $5,100,000 Not selected NA
25 Hwy 11 Reclaim and overlay from the west Roseau County line to Greenbush $13,000,000 Not selected NA
11 US Hwy 71 Thin mill and overlay from the north Wadena County line to Park Rapids $4,000,000 Not selected NA
9 US Hwy 71 Thin mill and overlay from Hubbard County Road 9 to Highway 2 $2,000,000 Not selected NA