Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.

Last updated November 2024

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
84 Hwy 46 Resurface Hwy 46 and Hwy 1 in Northome    $2,900,000   2028   3607-20   
82 Hwy 220 Resurface Hwy 220 between Polk CR 22 and Alvarado   $5,500,000   2030 6017-1089345    
79 Hwy 102 Resurface Hwy 102  $9,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
78 Hwy 172 Resurface Hwy 172  $6,000,000 Not Selected Not a district priority, will continue to monitor pavement performance 
78 Hwy 32 Resurface Hwy 32 between Red Lake Falls and St. Hilaire and replace a culvert south of St. Hilaire   $4,000,000   2032 6301-1055080    Scored in 2019
78 Hwy 46 Recondition Hwy 46 between Itasca County Road 39 and Itasca County Road 4  $11,700,000 Not Selected Coordinating funding with another district
78 Hwy 9 Resurface Hwy 9 between the north Norman County line and Crookston  $6,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
77 Hwy 46 Recondition Hwy 46 between Itasca County Road 4 and Alvwood  $8,200,000 Not Selected Coordinating funding with another district
76 Hwy 46 Resurface Hwy 46 from just north of CR 13 to Northome    $17,300,000   2030 3109-47
76 Hwy 89 Resurface and replace culverts on Hwy 89 between Grygla and Red Lake Nation boundary $4,509,733   2024 0415-17   
75 Hwy 1 Resurface Hwy 1 between Northome and Hwy 6  $11,900,000 Not Selected Coordinating funding with another district
75 Hwy 6 Resurface Hwy 6 between 11th Ave in Deer River and 1.6 miles north of Itasca County Road 136  $6,400,000 Not Selected Coordinating funding with another district
75 Hwy 72 Resurface Hwy 72 between Shooks and Waskish   $8,000,000   2032 0413-1055100    Scored in 2019
75 US Hwy 75 Resurface Hwy 75 between Climax and Crookston   $10,400,000 Not Selected Not a district priority, will continue to monitor pavement performance 
75 US Hwy 75 Resurface Hwy 75 between Norman County Road 25 and Shelly  $8,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
74 Hwy 11 Resurface Hwy 11 between Loman and Hwy 71  $5,900,000 Not Selected Coordinating funding with another district
74 Hwy 72 Resurface Hwy 72 between Blackduck and Hwy 1    $4,000,000   2032 0412-29    Scored in 2019
74 Hwy 87 Reconstruct Hwy 87 between Hwy 71 and Hubbard County Rd 6/Lake St in Hubbard   $10,374,000   2025   2909-20   Scored in 2019
74 Hwy 89 Resurface Hwy 89 between Wannaska and Roseau   $6,300,000   2034 6806-32    Scored in 2019
74 US Hwy 59 Resurface Hwy 59 between Newfolden and Karlstad  $8,900,000 Not Selected Scored in 2020
73 US Hwy 75 Resurface Hwy 75 between Shelly and Climax  $6,600,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 Hwy 200 Resurface Hwy 200 between Hwy 92 and Long Lake Park  $2,600,000 Not Selected Not a district priority, will continue to monitor pavement performance 
72 Hwy 220 Resurface Hwy 220 between Climax and Hwy 2  $12,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 Hwy 6 Resurface Hwy 6 between Hwy 286 to Hwy 1    $3,633,000   2030 3107-1038870    Scored in 2020
71 Hwy 200 Resurface Hwy 200 between Hwy 71 and Clearwater CR 2/north entrance to Itasca State Park   $4,200,000   2025   1505-25   
70 Hwy 1 Resurface Hwy1/Hwy 89 between the north junction of Hwy 89 and just east of Reservation road 6    $6,000,000   2031 0402-1038399     Scored in 2019
70 Hwy 220 Resurface Hwy 220 between Hwy 1 and Hwy 11  $13,400,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
70 Hwy 89 Resurface Hwy 89 between Hwy 11 and USA/Canada border  $6,500,000 Not Selected Not a district priority, will continue to monitor pavement performance 
69 Hwy 1 Resurface Hwy 1 between Clearwater County line and the south junction of Hwy 89    $7,200,000   2033 0403-08    Scored in 2019
69 Hwy 11 Resurface Hwy 11 between Clementson and Frontier    $7,319,000   2031 3604-1038038    
69 Hwy 11 Resurface Hwy 11 between Frontier and Koochiching County Road 83  $9,500,000 Not Selected Coordinating funding with another district
68 Hwy 11 Resurface Hwy 11 between Koochiching County Road 83 and Loman  $4,500,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts 
68 Hwy 89 Resurface Hwy 89 between the north jct of Hwy 1 and the northern border of the Red Lake Nation    $1,800,000   2031 0415-1038232    Scored in 2019
68 US Hwy 75 Resurface Hwy 75 and replace 3 culverts between Donaldson and Hallock    $13,500,000   2030 3508-29    
67 Hwy 11 Resurface Hwy 11 between Baudette and the Koochiching County line   $2,500,000   Not Selected 3902-1073483    Scored in 2020
66 Hwy 32 Resurface Hwy 32 between Co Rd 1 and Hwy 2    $5,300,000   2029 6007-15    Scored in 2019
66 US Hwy 75 Resurface Hwy 75 between Warren and Stephen  $5,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
65 Hwy 310 Resurface Hwy 310  $3,600,000 Not Selected Waiting to coordinate with another project
65 Hwy 89 Resurface Hwy 89 between Grygla and Hwy 219    $2,100,000   2032 4508-36    Scored in 2019
65 US Hwy 75 Resurface Hwy 75 between Hendrum and Perley    $11,200,000   2031 5406-20    Scored in 2019
64 Hwy 72 Resurface Hwy 72 between Lake of the Woods County Road 83 and Hwy 11  $6,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Euclid and Warren  $10,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Stephan and Donaldson   $4,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 1 Resurface Hwy 1 between Hwy 72 and Hwy 71    $4,617,000   2032 0405-1038227    Scored in 2019
62 Hwy 11 Resurface Hwy 11 from Hwy 72 to east Lake of the Woods County line   $1,190,348   2024 3902-27   
62 Hwy 92 Resurface Hwy 92 between Trail and Gonvick  $4,300,000 Not selected Not a district priority, will continue to monitor pavement performance 
61 Hwy 6 Resurface Hwy 6 between 1.6 miles north of Itasca County Road 136 to Hwy 286  $5,800,000 Not Selected
60 Hwy 64 Resurface Hwy 64 between south Hubbard County line and Hwy 87  $3,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
60 Hwy 89 Resurface Hwy 89 between Hwy 219 and Roseau County line    $5,230,988   2025 4508-35   Scored in 2019
60 Hwy 89 Resurface Hwy 89 between the county line to Wannaska    $2,700,000   2026 6806-31    Scored in 2019
59 Hwy 6 Resurface Hwy 6 between the Bigfork River Bridge and Hwy 6  $3,300,000 Not Selected Coordinating funding with another district
59 US Hwy 75 Resurface Hwy 75 between Hwy 2 and Polk County Road 19  $6,300,000 Not Selected
58 Hwy 32 Resurface Hwy 32 between Hwy 2 and Red Lake Falls    $3,400,000   2033 5703-1038053    Scored in 2019
58 Hwy 89 Resurface Hwy 89 between Beltrami County Road 26 to Red Lake Nation boundary  $7,200,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
57 Hwy 1 Resurface Hwy 1 between Hwy /ND border and Oslo  $500,000 Not Selected Waiting to coordinate with another project
57 Hwy 200 Resurface Hwy 200 between ND/Hwy border and Halstad  $200,000 Not Selected Waiting to coordinate with another project
56 Hwy 308 Resurface Hwy 308  $400,000 Not Selected Waiting to coordinate with another project
55 Hwy 1 Resurface Hwy 1 between Hwy 219 and Beltrami County line    $3,700,000   2032 5704-1038701    Scored in 2019
55 Hwy 200 Resurface Hwy 200 between Hwy 64 and Hubbard County Road 39  $700,000 Not Selected Waiting to coordinate with another project
55 Hwy 200 Resurface Hwy 200 between Hwy 71 and Hwy 64    $2,500,000   not Selected 2908-1038584    Scored in 2019
55 Hwy 89 Resurface and sidewalk upgrades on Hwy 89 in Grygla from CR 54 to 6th Ave $774,034   2024 4508-34   
55 US Hwy 59 Resurface Hwy 59 between Lake Bronson and Hwy 175    $2,800,000   2028   3506-27    Scored in 2019
54 Hwy 1 Resurface Hwy 1 between Oslo and Marshall CR 149 west of Warren and replace box culverts east of Warren    $12,000,000   2031 4501-1054960    Scored in 2019
51 Hwy 200 Resurface Hwy 200 from CR 39 to Hwy 371. Funded by District 2 and District 3    $12,700,000   2027   2908-31   Scored in 2019
51 Hwy 92 Resurface Hwy 92 between Hwy 32 and Brooks  $9,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
48 Hwy 32 Resurface Hwy 32 between the south Norman County line and Hwy 200  $4,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
43 Hwy 113 Resurface Hwy 113 between west Hubbard County line and Hwy 71  $4,700,000 Not Selected Waiting to coordinate with another project
40 Hwy 92 Resurface Hwy 92 between Gonvick and Bagley    $15,200,000   2029 1507-68    Scored in 2019
35 Hwy 87 Resurface Hwy 87 between County Rd 13 and Hwy 64    $2,300,000   2025   2909-18   Scored in 2019
30 Hwy 1 Resurface Hwy 1 between east Pennington County line and Hwy 89  $3,400,000 Not Selected
30 US Hwy 59 Resurface Hwy 59 between Karlstad and Lake Bronson  $6,100,000 Not Selected
27 Hwy 317 Resurface Hwy 317  $500,000 Not Selected
14 Hwy 1 Resurface Hwy 1 between Thief River Falls and Hwy 219  $5,400,000 Not Selected
6 Hwy 226 Resurface Hwy 226  $500,000 Not Selected

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
82 Hwy 220 Resurface Hwy 220 between Polk CR 22 and Alvarado   $4,000,000   2030 6017-1089345    
79 Hwy 102 Resurface Hwy 102  $9,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
78 Hwy 172 Resurface Hwy 172  $6,000,000 Not Selected Not a district priority, will continue to monitor pavement performance 
78 Hwy 32 Resurface Hwy 32 between Red Lake Falls and St. Hilaire and replace a culvert south of St. Hilaire   $3,000,000   2032 6301-1055080    Scored in 2019
78 Hwy 46 Recondition Hwy 46 between Itasca County Road 39 and Itasca County Road 4  $11,700,000 Not Selected Coordinating funding with another district
78 Hwy 9 Resurface Hwy 9 between the north Norman County line and Crookston  $6,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
77 Hwy 46 Recondition Hwy 46 between Itasca County Road 4 and Alvwood  $8,200,000 Not Selected Coordinating funding with another district
76 Hwy 46 Resurface Hwy 46 from just north of CR 13 to Hwy 1/CR 40    $7,200,000   2028 3109-47    Tied to a rural pavement project
76 Hwy 89 Resurface Hwy 89 between Beltrami CR 705 and 6 miles west of Hwy 1 $4,700,000   2024 0415-17   
75 Hwy 1 Resurface Hwy 1 between Northome and Hwy 6  $11,900,000 Not Selected Coordinating funding with another district
75 Hwy 6 Resurface Hwy 6 between 11th Ave in Deer River and 1.6 miles north of Itasca County Road 136  $6,400,000 Not Selected Coordinating funding with another district
75 Hwy 72 Resurface Hwy 72 between Shooks and Waskish   $5,000,000   2032 0413-1055100    Scored in 2019
75 US Hwy 75 Resurface Hwy 75 between Climax and Crookston   $10,400,000 Not Selected Not a district priority, will continue to monitor pavement performance 
75 US Hwy 75 Resurface Hwy 75 between Norman County Road 25 and Shelly  $8,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
74 Hwy 11 Resurface Hwy 11 between Loman and Hwy 71  $5,900,000 Not Selected Coordinating funding with another district
74 Hwy 72 Resurface Hwy 72 between Blackduck and Hwy 1    $2,800,000   2032 0412-29    Scored in 2019
74 Hwy 87 Resurface Hwy 87 between Hubbard CR 6 and CR 13 in Hubbard    $9,200,000   2024   2909-17   Scored in 2020
74 Hwy 87 Reconstruct Hwy 87 between Hwy 71 and Hubbard County Rd 6/Lake St in Hubbard   $7,900,000   2025   2909-20   Scored in 2019
74 Hwy 89 Resurface Hwy 89 between Wannaska and Roseau   $5,000,000   2030 6806-32    Scored in 2019
74 US Hwy 59 Resurface Hwy 59 between Newfolden and Karlstad  $8,900,000 Not Selected Scored in 2020
73 US Hwy 75 Resurface Hwy 75 between Shelly and Climax  $6,600,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 Hwy 200 Resurface Hwy 200 between Hwy 92 and Long Lake Park  $2,600,000 Not Selected Not a district priority, will continue to monitor pavement performance 
72 Hwy 220 Resurface Hwy 220 between Climax and Hwy 2  $12,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 Hwy 6 Resurface Hwy 6 between Hwy 286 to Hwy 1    $3,633,000   2030 3107-1038870    Scored in 2020
71 Hwy 200 Resurface Hwy 200 between Hwy 71 and Clearwater CR 2/north entrance to Itasca State Park   $4,000,000   2025   1505-25   
71 Hwy 220 Reconstruct Hwy 220 between East Grand Forks and Polk CR 22   $19,000,000   2024 6017-45   RQI forecast does not reflect on the ground conditions
70 Hwy 1 Resurface Hwy1/Hwy 89 between the north junction of Hwy 89 and eastern Clearwater County line    $4,700,000   2031 0402-1038399     Scored in 2019
70 Hwy 220 Resurface Hwy 220 between Hwy 1 and Hwy 11  $13,400,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
70 Hwy 89 Resurface Hwy 89 between Hwy 11 and USA/Canada border  $6,500,000 Not Selected Not a district priority, will continue to monitor pavement performance 
69 Hwy 1 Resurface Hwy 1 between Clearwater County line and the south junction of Hwy 89    $7,200,000   2033 0403-08    Scored in 2019
69 Hwy 11 Resurface Hwy 11 between Clementson and Frontier    $7,319,000   2031 3604-1038038    
69 Hwy 11 Resurface Hwy 11 between Frontier and Koochiching County Road 83  $9,500,000 Not Selected Coordinating funding with another district
68 Hwy 11 Resurface Hwy 11 between Koochiching County Road 83 and Loman  $4,500,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts 
68 Hwy 89 Resurface Hwy 89 between the north jct of Hwy 1 and the northern border of the Red Lake Nation    $1,600,000   2031 0415-1038232    Scored in 2019
68 US Hwy 75 Resurface Hwy 75 and replace 3 culverts between Donaldson and Hallock    $10,800,000   2030 3508-29    
67 Hwy 11 Resurface Hwy 11 between Baudette and the Koochiching County line   $2,500,000   Not Selected 3902-1073483    Scored in 2020
66 Hwy 32 Resurface Hwy 32 between Co Rd 1 in Fertile and Hwy 2    $6,000,000   2029 6007-15    Scored in 2019
66 US Hwy 75 Resurface Hwy 75 between Warren and Stephen  $5,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
65 Hwy 310 Resurface Hwy 310  $3,600,000 Not Selected Waiting to coordinate with another project
65 Hwy 89 Resurface Hwy 89 between Grygla and Hwy 219    $1,300,000   2032 4508-36    Scored in 2019
65 US Hwy 75 Resurface Hwy 75 between Hendrum and Perley    $4,700,000   2031 5406-20    Scored in 2019
64 Hwy 72 Resurface Hwy 72 between Lake of the Woods County Road 83 and Hwy 11  $6,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Euclid and Warren  $10,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Stephan and Donaldson   $4,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 1 Resurface Hwy 1 between Hwy 72 and Hwy 71    $4,617,000   2033 0405-1038227    Scored in 2019
62 Hwy 11 Resurface Hwy 11 from Hwy 72 to east Lake of the Woods County line   $1,600,000   2024   3902-27   
62 Hwy 92 Resurface Hwy 92 between Trail and Gonvick  $4,300,000 Not selected Not a district priority, will continue to monitor pavement performance 
61 Hwy 6 Resurface Hwy 6 between 1.6 miles north of Itasca County Road 136 to Hwy 286  $5,800,000 Not Selected
60 Hwy 64 Resurface Hwy 64 between south Hubbard County line and Hwy 87  $3,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
60 Hwy 89 Resurface Hwy 89 between Marshall County line and Wannaska    $2,400,000   2029 6806-31    Scored in 2019
60 Hwy 89 Resurface Hwy 89 between Hwy 219 and Roseau County line    $5,900,000   2025 4508-35   Scored in 2019
59 Hwy 6 Resurface Hwy 6 between the Bigfork River Bridge and Hwy 6  $3,300,000 Not Selected Coordinating funding with another district
59 US Hwy 75 Resurface Hwy 75 between Hwy 2 and Polk County Road 19  $6,300,000 Not Selected
58 Hwy 32 Resurface Hwy 32 between Hwy 2 and Red Lake Falls    $2,200,000   2032 5703-1038053    Scored in 2019
58 Hwy 89 Resurface Hwy 89 between Beltrami County Road 26 to Red Lake Nation boundary  $7,200,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
57 Hwy 1 Resurface Hwy 1 between Hwy /ND border and Oslo  $500,000 Not Selected Waiting to coordinate with another project
57 Hwy 200 Resurface Hwy 200 between ND/Hwy border and Halstad  $200,000 Not Selected Waiting to coordinate with another project
56 Hwy 308 Resurface Hwy 308  $400,000 Not Selected Waiting to coordinate with another project
55 Hwy 1 Resurface Hwy 1 between Hwy 219 and Beltrami County line    $2,500,000   2032 5704-1038701    Scored in 2019
55 Hwy 1 Resurface Hwy 1 from Oslo to 2.4 mi E of Oslo   $890,000   2024   4501-53   Scored in 2019
55 Hwy 200 Resurface Hwy 200 between Hwy 71 and Hwy 64    $2,500,000   not Selected 2908-1038584    Scored in 2019
55 Hwy 200 Resurface Hwy 200 between Hwy 64 and Hubbard County Road 39  $700,000 Not Selected Waiting to coordinate with another project
55 Hwy 89 Resurface Hwy 89 and pedestrian improvements between Marshall CR 54 and Grygla $880,000   2024 4508-34   
55 US Hwy 59 Resurface Hwy 59 between Lake Bronson and Hwy 175    $2,000,000   2028 3506-27    Scored in 2019
54 Hwy 1 Resurface Hwy 1 between Oslo and Marshall CR 149 west of Warren and replace box culverts east of Warren    $7,800,000   2031 4501-1054960    Scored in 2019
51 Hwy 200 Resurface Hwy 200 from CR 39 to Hwy 371. Funded by District 2 and District 3    $10,900,000   2026   2908-31   Scored in 2019
51 Hwy 92 Resurface Hwy 92 between Hwy 32 and Brooks  $9,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
48 Hwy 32 Resurface Hwy 32 between the south Norman County line and Hwy 200  $4,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
43 Hwy 113 Resurface Hwy 113 between west Hubbard County line and Hwy 71  $4,700,000 Not Selected Waiting to coordinate with another project
40 Hwy 92 Resurface Hwy 92 between Gonvick and Bagley    $11,000,000   2029 1507-68    Scored in 2019
38 Hwy 219 Resurface Hwy 219 between Goodridge and Hwy 89    $2,800,000   2032 4510-1038230    Scored in 2019
35 Hwy 87 Resurface Hwy 87 between County Rd 13 and Hwy 64    $2,300,000   2025   2909-18   Scored in 2019
30 Hwy 1 Resurface Hwy 1 between east Pennington County line and Hwy 89  $3,400,000 Not Selected
30 US Hwy 59 Resurface Hwy 59 between Karlstad and Lake Bronson  $6,100,000 Not Selected
29 Hwy 223 Resurface Hwy 223 between Hwy 92 and Clearwater CR 10 in Leonard    $2,200,000   2024   1508-08   Scored in 2019. RQI forecast does not reflect on the ground conditions. 
27 Hwy 317 Resurface Hwy 317  $500,000 Not Selected
14 Hwy 1 Resurface Hwy 1 between Thief River Falls and Hwy 219  $5,400,000 Not Selected
6 Hwy 226 Resurface Hwy 226  $500,000 Not Selected

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
82 Hwy 220 Resurface Hwy 220 between Polk CR 22 and Alvarado   $4,000,000   2030 6017-1089345    
79 Hwy 102 Resurface Hwy 102  $9,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
78 Hwy 32 Resurface Hwy 32 between Red Lake Falls and St. Hilaire and replace a culvert south of St. Hilaire   $2,800,000   2031 6301-1055080    Scored in 2019
78 Hwy 172 Resurface Hwy 172  $6,000,000 Not Selected Not a district priority, will continue to monitor pavement performance 
78 Hwy 46 Recondition Hwy 46 between Itasca County Road 39 and Itasca County Road 4  $11,700,000 Not Selected Coordinating funding with another district
78 Hwy 9 Resurface Hwy 9 between the north Norman County line and Crookston  $6,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
77 Hwy 46 Recondition Hwy 46 between Itasca County Road 4 and Alvwood  $8,200,000 Not Selected Coordinating funding with another district
76 Hwy 46 Resurface Hwy 46 from just north of CR 13 to Hwy 1/CR 40    $7,200,000   2028 3109-47    Tied to a rural pavement project
76 Hwy 89 Resurface Hwy 89 between Beltrami CR 705 and 6 miles west of Hwy 1 $4,900,000   2024   0415-17   
76 US Hwy 59 Resurface Hwy 59 from north of Hwy 1 in Thief River Falls to south of Co Rd 28 in Newfolden   $2,900,000 2023 4505-16
75 Hwy 72 Resurface Hwy 72 between Shooks and Waskish   $5,200,000   2032 0413-1055100    Scored in 2019
75 Hwy 1 Resurface Hwy 1 between Northome and Hwy 6  $11,900,000 Not Selected Coordinating funding with another district
75 Hwy 6 Resurface Hwy 6 between 11th Ave in Deer River and 1.6 miles north of Itasca County Road 136  $6,400,000 Not Selected Coordinating funding with another district
75 US Hwy 75 Resurface Hwy 75 between Climax and Crookston   $10,400,000 Not Selected Not a district priority, will continue to monitor pavement performance 
75 US Hwy 75 Resurface Hwy 75 between Norman County Road 25 and Shelly  $8,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
74 Hwy 89 Resurface Hwy 89 between Wannaska and Roseau   $4,100,000   2030 6806-32    Scored in 2019
74 Hwy 72 Resurface Hwy 72 between Blackduck and Hwy 1    $2,800,000   2031 0412-29    Scored in 2019
74 Hwy 1 Resurface Hwy 1 between Red Lake Indian Reservation boundary and Hwy 89 and construct a pedestrian and bike trail on the north side of Hwy 1    $2,500,000   2023   0404-37   Selected prior to the adoption of the selection policy
74 Hwy 87 Resurface Hwy 87 between Hubbard CR 6 and CR 13 in Hubbard    $9,200,000   2024   2909-17   Scored in 2020
74 Hwy 87 Reconstruct Hwy 87 between Hwy 71 and Hubbard County Rd 6/Lake St in Hubbard   $7,900,000   2025   2909-20   Scored in 2019
74 Hwy 11 Resurface Hwy 11 between Loman and Hwy 71  $5,900,000 Not Selected Coordinating funding with another district
74 US Hwy 59 Resurface Hwy 59 between Newfolden and Karlstad  $8,900,000 Not Selected Scored in 2020
73 US Hwy 75 Resurface Hwy 75 between Shelly and Climax  $6,600,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 Hwy 6 Resurface Hwy 6 between Hwy 286 to Hwy 1    $3,779,000   2031 3107-1038870    Scored in 2020
72 Hwy 200 Resurface Hwy 200 between Hwy 92 and Long Lake Park  $2,600,000 Not Selected Not a district priority, will continue to monitor pavement performance 
72 Hwy 220 Resurface Hwy 220 between Climax and Hwy 2  $12,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
71 Hwy 220 Recondition Hwy 220 between East Grand Forks and Polk CR 22   $4,500,000   2028 6017-45- Potential emerging need to advance.
71 Hwy 200 Resurface Hwy 200 between Hwy 71 and Clearwater CR 2/north entrance to Itasca State Park   $3,500,000   2025   1505-25   
70 Hwy 1 Resurface Hwy1/Hwy 89 between the north junction of Hwy 89 and eastern Clearwater County line    $4,800,000   2029 0402-1038399    Scored in 2019
70 Hwy 220 Resurface Hwy 220 between Hwy 1 and Hwy 11  $13,400,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
70 Hwy 89 Resurface Hwy 89 between Hwy 11 and USA/Canada border  $6,500,000 Not Selected Not a district priority, will continue to monitor pavement performance 
69 Hwy 11 Resurface Hwy 11 between Clementson and Frontier    $7,035,000   2030 3604-1038038    
69 Hwy 1 Resurface Hwy 1 between Clearwater County line and the south junction of Hwy 89    $6,800,000   2032 0403-1038986    Scored in 2019
69 Hwy 11 Resurface Hwy 11 between Frontier and Koochiching County Road 83  $9,500,000 Not Selected Coordinating funding with another district
68 US Hwy 75 Resurface Hwy 75 and replace 3 culverts between Donaldson and Hallock    $12,000,000   2029 3508-29    
68 Hwy 89 Resurface Hwy 89 between the north jct of Hwy 1 and the northern border of the Red Lake Nation    $1,600,000   2029 0415-1038232    Scored in 2019
68 US Hwy 75 Resurface Hwy 75 between Hallock and the Canadian border; resurface Hwy 171 and replace 3 bridges between Hwy 75 and North Dakota border   $9,269,701   2023   3509-28   Selected prior to the adoption of the scoring policy.
68 Hwy 11 Resurface Hwy 11 between Koochiching County Road 83 and Loman  $4,500,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts 
67 Hwy 11 Resurface Hwy 11 between Baudette and the Koochiching County line   $2,500,000   2032 3902-1073483    Scored in 2020
66 Hwy 32 Resurface Hwy 32 between Fertile and Hwy 2    $9,500,000   2028 6007-15    Scored in 2019
66 US Hwy 75 Resurface Hwy 75 between Warren and Stephen  $5,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
65 US Hwy 75 Resurface Hwy 75 between Hendrum and Perley    $4,900,000   2030 5406-20    Scored in 2019
65 Hwy 89 Resurface Hwy 89 between Grygla and Hwy 219    $1,300,000   2031 4508-36    Scored in 2019
65 Hwy 310 Resurface Hwy 310  $3,600,000 Not Selected Waiting to coordinate with another project
64 Hwy 72 Resurface Hwy 72 between Baudette and the Canadian border   $4,100,000   2023   3905-10   Selected prior to the adoption of the selection policy.
64 Hwy 72 Resurface Hwy 72 between Lake of the Woods County Road 83 and Hwy 11  $6,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Euclid and Warren  $10,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Stephan and Donaldson   $4,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
63 Hwy 200 Resurface Hwy 200 from east of Hwy 64 to east of Hwy 71   $800,000 2023 2908-32
62 Hwy 1 Resurface Hwy 1 between Hwy 72 and Hwy 71    $4,617,000   2032 0405-1038227    Scored in 2019
62 Hwy 11 Resurface Hwy 11 from Hwy 72 to east Lake of the Woods County line   $2,000,000 Future 3902-27- Potential emerging need.
62 Hwy 92 Resurface Hwy 92 between Trail and Gonvick  $4,300,000 Not selected Not a district priority, will continue to monitor pavement performance 
61 Hwy 6 Resurface Hwy 6 between 1.6 miles north of Itasca County Road 136 to Hwy 286  $5,800,000 Not Selected Coordinating funding with another district
60 Hwy 89 Resurface Hwy 89 between Marshall County line and Wannaska    $2,400,000   2029 6806-31    Scored in 2019
60 Hwy 89 Resurface Hwy 89 between Hwy 219 and Roseau County line    $6,000,000   2025   4508-35   Scored in 2019
60 Hwy 64 Resurface Hwy 64 between south Hubbard County line and Hwy 87  $3,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
59 Hwy 6 Resurface Hwy 6 between the Bigfork River Bridge and Hwy 6  $3,300,000 Not Selected Coordinating funding with another district
59 US Hwy 75 Resurface Hwy 75 between Hwy 2 and Polk County Road 19  $6,300,000 Not Selected NA
58 Hwy 32 Resurface Hwy 32 between Hwy 2 and Red Lake Falls    $2,200,000   2031 5703-1038053    Scored in 2019
58 Hwy 89 Resurface Hwy 89 between Beltrami County Road 26 to Red Lake Nation boundary  $7,200,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
57 Hwy 1 Resurface Hwy 1 between Hwy /ND border and Oslo  $500,000 Not Selected Waiting to coordinate with another project
57 Hwy 200 Resurface Hwy 200 between ND/Hwy border and Halstad  $200,000 Not Selected Waiting to coordinate with another project
56 Hwy 308 Resurface Hwy 308  $400,000 Not Selected Waiting to coordinate with another project
55 US Hwy 59 Resurface Hwy 59 between Lake Bronson and Hwy 175    $2,000,000   2027 3506-27    Scored in 2019
55 Hwy 1 Resurface Hwy 1 between Hwy 219 and Beltrami County line    $2,600,000   2032 5704-1038701    Scored in 2019
55 Hwy 200 Resurface Hwy 200 between Hwy 71 and Hwy 64    $2,500,000   2032 2908-1038584    Scored in 2019
55 Hwy 1 Resurface Hwy 1 from Oslo to 2.4 mi E of Oslo   $890,000   2024   4501-53   Scored in 2019
55 Hwy 89 Resurface Hwy 89 and pedestrian improvements between Marshall CR 54 and Grygla  $880,000   2024   4508-34   
55 Hwy 200 Resurface Hwy 200 between Hwy 64 and Hubbard County Road 39  $700,000 Not Selected Waiting to coordinate with another project
54 Hwy 1 Resurface Hwy 1 between Oslo and Marshall CR 149 west of Warren    $7,500,000   2030 4501-1054960    Scored in 2019
51 Hwy 200 Resurface Hwy 200 from CR 39 to Hwy 371. Funded by District 2 and District 3    $10,900,000   2026   2908-31   Scored in 2019
51 Hwy 92 Resurface Hwy 92 between Hwy 32 and Brooks  $9,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
48 Hwy 32 Resurface Hwy 32 between the south Norman County line and Hwy 200  $4,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
43 Hwy 113 Resurface Hwy 113 between west Hubbard County line and Hwy 71  $4,700,000 Not Selected Waiting to coordinate with another project
40 Hwy 92 Resurface Hwy 92 between Gonvick and Bagley    $11,000,000   2027 1507-68    Scored in 2019
38 Hwy 219 Resurface Hwy 219 between Goodridge and Hwy 89    $2,800,000   2031 4510-1038230    Scored in 2019
35 Hwy 87 Resurface Hwy 87 between County Rd 13 and Hwy 64    $2,300,000   2026   2909-18   Scored in 2019
30 Hwy 1 Resurface Hwy 1 between east Pennington County line and Hwy 89  $3,400,000 Not Selected NA
30 US Hwy 59 Resurface Hwy 59 between Karlstad and Lake Bronson  $6,100,000 Not Selected NA
29 Hwy 223 Resurface Hwy 223 between Hwy 92 and Clearwater CR 10 in Leonard    $2,200,000   2024   1508-08   Scored in 2019. RQI forecast does not reflect on the ground conditions. 
27 Hwy 317 Resurface Hwy 317  $500,000 Not Selected NA
14 Hwy 1 Resurface Hwy 1 between Thief River Falls and Hwy 219  $5,400,000 Not Selected NA
6 Hwy 226 Resurface Hwy 226  $500,000 Not Selected NA

View more detailed scores (Excel).

Score Route  Description  High-Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
88 Hwy 200 Resurface Hwy 200 and replace 2 bridges between Hwy 371 and Hwy 84  $5,600,000 2022 SP 1106-15. Selected prior to the adoption of the scoring policy.
82 Hwy 220 Resurface Hwy 220 between Polk County Road 22 and Alvarado  $4,400,000 2029 6017-1089345
79 Hwy 102 Resurface Hwy 102  $9,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
79 Hwy 222 Turnback of Hwy 222 between Hwy 92 and Red Lake County Road 53 in Oklee  $600,000 2022 SP 6306-05. Turnback agreement being processed.
78 Hwy 32 Resurface Hwy 32 between Red Lake Falls and St. Hilaire  $4,700,000 2030 6301-1055080. Scored in 2019
78 Hwy 46 Recondition Hwy 46 between Itasca County Road 39 and Itasca County Road 4  $11,700,000 Not Selected Coordinating funding with another district
78 Hwy 9 Resurface Hwy 9 between the north Norman County line and Crookston  $6,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
78 Hwy 172 Resurface Hwy 172  $6,000,000 Not Selected Not a district priority, will continue to monitor pavement performance 
77 Hwy 46 Recondition Hwy 46 between Itasca County Road 4 and Alvwood  $8,200,000 Not Selected Coordinating funding with another district
76 Hwy 46 Recondition Hwy 46 between Alvwood and Northome  $6,700,000 2028 3109-1038979 Scored in 2019
76 US Hwy 59 Resurface Hwy 59 between Thief River Falls and Newfolden  $8,800,000 Not Selected Distict does not expect pavement segments to deteriorate as fast as model predicts 
76 Hwy 89 Resurface Hwy 89 between Beltrami County Road 705 and 6 miles west of Hwy 1  $6,200,000 2024 SP 0415-17
75 Hwy 72 Resurface Hwy 72 between Hwy 1 and Tamarac River  $10,900,000 2031 0413-1055100. Scored in 2019
75 Hwy 1 Resurface Hwy 1 between Northome and Hwy 6  $11,900,000 Not Selected Coordinating funding with another district
75 Hwy 6 Resurface Hwy 6 between 11th Ave in Deer River and 1.6 miles north of Itasca County Road 136  $6,400,000 Not Selected Coordinating funding with another district
75 US Hwy 75 Resurface Hwy 75 between Climax and Crookston   $10,400,000 Not Selected Not a district priority, will continue to monitor pavement performance 
75 US Hwy 75 Resurface Hwy 75 between Norman County Road 25 and Shelly  $8,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
74 Hwy 72 Resurface Hwy 72 between Blackduck and Hwy 1  $4,400,000 2030 0142-1038880 Scored in 2019
74 Hwy 87 Reconstruct Hwy 87 between Hubbard County Road 6 and County Road 13 in Hubbard  $3,700,000 2024 SP 2909-17 Scored in 2020
74 Hwy 1 Resurface Hwy 1 between Red Lake Indian Reservation boundary and Hwy 89  $3,400,000 2023 SP 0404-37 Selected prior to the adoption of the selection policy
74 Hwy 11 Resurface Hwy 11 between Loman and Hwy 71  $5,900,000 Not Selected Coordinating funding with another district
74 Hwy 87 Reconstruct Hwy 87 between Hwy 71 and Hubbard County Road 6/Lake St in Hubbard  $2,700,000 2025 SP 2909-20 Scored in 2019
72 Hwy 200 Resurface Hwy 200 between Hwy 92 and Long Lake Park  $2,600,000 Not Selected Not a district priority, will continue to monitor pavement performance 
74 US Hwy 59 Resurface Hwy 59 between Newfolden and Karlstad  $8,900,000 2031 4506-1073463 Scored in 2020
73 US Hwy 75 Resurface Hwy 75 between Shelly and Climax  $6,600,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 Hwy 6 Resurface Hwy 6 between Hwy 286 and Hwy 1  $4,900,000 2031 3107-1038870. Scored in 2020
57 Hwy 200 Resurface Hwy 200 between ND/Hwy border and Halstad  $200,000 Not Selected Waiting to coordinate with another project
72 Hwy 220 Resurface Hwy 220 between Climax and Hwy 2  $12,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
70 Hwy 1 Resurface Hwy1/Hwy 89 between the north junction of Hwy 89 and eastern Clearwater County line  $9,500,000 2028 0402-1038399. Scored in 2019
70 Hwy 89 Resurface Hwy 89 between Hwy 11 and USA/Canada border  $6,500,000 Not Selected Not a district priority, will continue to monitor pavement performance 
70 Hwy 220 Resurface Hwy 220 between Hwy 1 and Hwy 11  $13,400,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
69 Hwy 11 Resurface Hwy 11 between Clementson and Frontier  $7,900,000 2030 3604-1038038
69 Hwy 11 Resurface Hwy 11 between Frontier and Koochiching County Road 83  $9,500,000 Not Selected Coordinating funding with another district
69 Hwy 87 Resurface Hwy 87 between County Rd 13 and Hwy 64  $3,200,000 2025 SP 2909-18 Scored in 2019
69 Hwy 1 Resurface Hwy 1 between Clearwater County line and Hwy 89  $5,200,000 2031 0403-1038986. Scored in 2019
68 Hwy 72 Resurface 1-mile of Hwy 72 in Blackduck  $500,000 2026 SP 0412-28. Scored in 2019. Tied to a rural pavement project.
68 Hwy 11 Resurface Hwy 11 between Koochiching County Road 83 and Loman  $4,500,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts 
68 Hwy 171 Resurface Hwy 171  $800,000 2023 Tied to SP 3509-28. Selected prior to the adoption of the selection policy.
68 US Hwy 75 Resurface Hwy 75 between Hallock and the Canadian border; resurface Hwy 171 and replace 3 bridges between Hwy 75 and North Dakota border  $7,500,000 2023 SP 3509-28
68 US Hwy 75 Resurface Hwy 75 and replace 3 culverts between Donaldson and Hallock  $6,300,000 2029 3509-29
67 Hwy 11 Resurface Hwy 11 between Baudette and the east Lake of the Woods County line  $3,400,000 2031 3902-1073483. Scored in 2020
66 Hwy 32 Resurface Hwy 32 between Fertile and Hwy 2  $6,700,000 2028 6007-1038990 Scored in 2019
66 US Hwy 75 Resurface Hwy 75 between Warren and Stephen  $5,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
66 Hwy 87 Resurface Hwy 87 between the southern Hubbard County line and Hwy 64  $400,000 Not Selected Waiting to coordinate with another project
65 US Hwy 75 Resurface Hwy 75 between Hendrum and Perley  $3,600,000 2029 5406-1038581 Scored in 2019
65 Hwy 89 Resurface Hwy 89 between Grygla and Hwy 219  $2,700,000 2030 4508-1038403 Scored in 2019
65 Hwy 310 Resurface Hwy 310  $3,600,000 Not Selected Waiting to coordinate with another project
64 Hwy 72 Resurface Hwy 72 between Lake of the Woods County Road 83 and Hwy 11  $6,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Euclid and Warren  $10,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US Hwy 75 Resurface Hwy 75 between Stephan and Donaldson   $4,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
62 Hwy 1 Resurface Hwy 1 between Hwy 72 and Hwy 71  $5,100,000 2031 0405-1038227. Scored in 2019
62 Hwy 92 Resurface Hwy 92 between Trail and Gonvick  $4,300,000 Not selected Not a district priority, will continue to monitor pavement performance 
59 Hwy 92 Resurface and widen shoulders on Hwy 92 between Clearwater County Road 35 and Hwy 200 in Zerkel  $2,700,000 2022 Selected Prior to the adoption of the scoring policy. 1506-41
59 US Hwy 75 Resurface Hwy 75 between Hwy 2 and Polk County Road 19  $6,300,000 Not Selected NA
58 Hwy 32 Resurface Hwy 32 between Hwy 2 and Red Lake Falls, and replace culvert on Hwy 32 south of St. Hilaire  $4,200,000 2031 5703-1038053 Scored in 2019
55 Hwy 200 Resurface Hwy 200 between Hwy 71 and Hwy 64  $2,600,000 2031 2908-1038584. Scored in 2019
56 Hwy 308 Resurface Hwy 308  $400,000 Not Selected Waiting to coordinate with another project
57 Hwy 1 Resurface Hwy 1 between Hwy /ND border and Oslo  $500,000 Not Selected Waiting to coordinate with another project
55 Hwy 1 Resurface Hwy 1 between Goodridge and Beltrami County line  $5,000,000 2030 5704-1038701. Scored in 2019
55 Hwy 200 Resurface Hwy 200 between Hwy 64 and Hubbard County Road 39  $700,000 Not Selected Waiting to coordinate with another project
55 US Hwy 59 Resurface Hwy 59 between Lake Bronson and Hwy 175  $2,400,000 2026 SP 3506-27 Scored in 2019
51 Hwy 92 Resurface Hwy 92 between Hwy 32 and Brooks  $9,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
51 Hwy 200 Resurface Hwy 200 between Hwy 371 and Laporte  $4,800,000 2026 SP 2908-31. Scored in 2019
48 Hwy 32 Resurface Hwy 32 between the south Norman County line and Hwy 200  $4,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
43 Hwy 113 Resurface Hwy 113 between west Hubbard County line and Hwy 71  $4,700,000 Not Selected Waiting to coordinate with another project
40 Hwy 92 Resurface Hwy 92 between Bagley and Gonvick  $8,100,000 2027 SP 1507-68 Scored in 2019
38 Hwy 219 Resurface Hwy 219 between Goodridge and Hwy 89  $7,600,000 2030 4510-1038230. Scored in 2019
55 Hwy 1 Resurface Hwy 1 from Oslo to 2.4 mi E of Oslo  $1,000,000 2025 SP 4501-53. Scored in 2019
30 US Hwy 59 Resurface Hwy 59 between Karlstad and Lake Bronson  $6,100,000 Not Selected  
29 Hwy 223 Resurface Hwy 223 between Hwy 92 and Clearwater County Road 10 in Leonard  $2,900,000 2024 SP 1508-08. Scored in 2019. RQI forecast does not reflect on the ground conditions. 
27 Hwy 317 Resurface Hwy 317  $500,000 Not Selected NA
21 Hwy 220 Recondition Hwy 220 between East Grand Forks and Polk County Road 22  $8,200,000 2027 SP 6017-45. RQI forecast does not reflect on the ground conditions
6 Hwy 226 Resurface Hwy 226  $500,000 Not Selected NA
54 Hwy 1 Resurface Hwy 1 between Marshall County Road 17 and Warren  $9,000,000 2028 4501-1054960 Scored in 2019
30 Hwy 1 Resurface Hwy 1 between east Pennington County line and Hwy 89  $3,400,000 Not Selected NA
14 Hwy 1 Resurface Hwy 1 between Thief River Falls and Hwy 219  $5,400,000 Not Selected NA
49 Hwy 200 Resurface Hwy 200 between Roy Lake and Zerkel  $4,300,000 2022 SP 1504-15. Selected prior to the adoption of the scoring policy
61 Hwy 6 Resurface Hwy 6 between 1.6 miles north of Itasca County Road 136 to Hwy 286  $5,800,000 Not Selected NA
59 Hwy 6 Resurface Hwy 6 between the Bigfork River Bridge and Hwy 6  $3,300,000 Not Selected Coordinating funding with another district
60 Hwy 64 Resurface Hwy 64 between south Hubbard County line and Hwy 87  $3,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
74 Hwy 89 Resurface Hwy 89 between Roseau and Wannaska  $2,700,000 2029 6806-32 Scored in 2019
60 Hwy 89 Resurface Hwy 89 between Hwy 219 and Roseau County line  $700,000 2026 4508-35 Scored in 2019
60 Hwy 89 Resurface Hwy 89 between Wannaska and Marshall County line  $3,700,000 2027 6806-31 Scored in 2019
68 Hwy 89 Resurface Hwy 89 between the north jct of Hwy 1 and the northern border of the Red Lake Nation  $2,300,000 2028 0415-1038232 Scored in 2019
58 Hwy 89 Resurface Hwy 89 between Beltrami County Road 26 to Red Lake Nation boundary  $7,200,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 

 

Score Route  Description  High-Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
85 Hwy 200 Resurface Hwy 200 from Hwy 371 to Hwy 84 $2,800,000 2021  
80 Hwy 222 Resurface Hwy 222 from Hwy 92 to Oklee $500,000 2026  
79 Hwy 32 Resurface Hwy 32 from Red Lake Falls to St. Hilaire $3,100,000 2029  
79 US Hwy 59 Resurface Hwy 59 from Thief River Falls to Newfolden $4,400,000 Not selected Distict does not expect pavement segments to deteriorate as fast as model predicts 
79 Hwy 6 Resurface Hwy 6 from 11th Ave in Deer River to 1.6 miles north of Itasca County Road 136 $2,900,000 2025  
77 Hwy 46 Resurface Hwy 46 from just Itasca County Road 39 to Itasca County Road 13 $9,900,000 Not selected Coordinating funding with another district
76 Hwy 72 Resurface Hwy 72 from Blackduck to Hwy 1 $2,100,000 2028  
76 US Hwy 75 Resurface Hwy 75 from south Norman County line to Halstad $4,200,000 2030  
76 US Hwy 75 Resurface Hwy 75 from Climax to Crookston  $5,200,000 Not selected District does not expect pavement segments to deteriorate as fast as model predicts 
76 Hwy 89 Resurface Hwy 89 from Fourtown to Log Church Rd NW $3,300,000 2024  
76 Hwy 46 Resurface Hwy 46 from Itasca County Road 13 to Hwy 1 $3,600,000 2028  
75 Hwy 1 Resurface Hwy 1 from Northome to Hwy 6 $6,000,000 2030  
75 US Hwy 75 Resurface Hwy 75 from Shelly to Climax $3,300,000 2030  
74 Hwy 1 Resurface Hwy 1 from Hwy 89 to east Clearwater County line $4,900,000 2027  
74 US Hwy 59 Resurface Hwy 59 from Newfolden to Karlstad $4,500,000 2030  
74 Hwy 72 Resurface Hwy 72 from Hwy 1 to the Tamarac River $5,500,000 2030  
74 US Hwy 75 Resurface Hwy 75 from Stephan to Donaldson  $2,500,000 Not selected District does not expect pavement segments to deteriorate as fast as model predicts 
74 Hwy 200 Resurface Hwy 200 from Laporte to Hwy 371 $2,600,000 2025  
73 Hwy 92 Resurface Hwy 92 from Hubbard County Road 35 to Hwy 200 $1,400,000 2022  
72 Hwy 1 Resurface Hwy 1 from west Beltrami County line to Hwy 89 $2,500,000 2029  
72 Hwy 1 Resurface Hwy 1 from busy corner to east Beltrami County line $1,600,000 2029  
72 Hwy 87 Reconstruct Hwy 87 from Hwy 71 to Hubbard County Road 6 $16,100,000 2025  
72 Hwy 89 Resurface Hwy 89 from Wannaska to Hwy 11 $3,200,000 2027  
72 Hwy 219 Resurface Hwy 219 from Hwy 1 to jct with Hwy 89 $3,700,000 2028  
72 Hwy 220 Resurface Hwy 220 from East Grand Forks to Alvarado $4,000,000 2027  
72 Hwy 6 Resurface Hwy 6 from Hwy 286 to Hwy 1 $2,200,000 2027  
71 Hwy 9 Resurface Hwy 9 from the north Norman County line to Crookston $3,100,000 Not selected District does not expect pavement segments to deteriorate as fast as model predicts
71 Hwy 200 Resurface Hwy 200 from the junctions of Hwy 32 $600,000 Not selected Waiting to coordinate with another project
71 Hwy 200 Resurface Hwy 200 from Clearwater County Road 2 to Hwy 71 $1,500,000 2026  
70 Hwy 1 Resurface Hwy 1 from Hwy 89 to east Red Lake Nation boundary  $2,300,000 2023  
70 Hwy 72 Resurface Hwy 72 from Blackduck to 1-mile north $300,000 2026 Tied to another project
70 Hwy 89 Resurface Hwy 89 from Hwy 219 to north Marshall County line $3,600,000 2026  
70 Hwy 89 Resurface Hwy 89 from south Roseau County line to Wannaska $1,900,000 2026  
69 Hwy 11 Resurface Hwy 11 from west Koochiching County line to Frontier  $4,100,000 Not selected Coordinating funding with another district
69 Hwy 11 Resurface Hwy 11 from Frontier to Koochiching County Road 83 $4,800,000 Not selected Coordinating funding with another district
69 Hwy 11 Resurface Hwy 11 from Loman to Hwy 71 $3,000,000 Not selected Coordinating funding with another district
69 Hwy 64 Resurface Hwy 64 from south Hubbard County line to Hwy 87 $1,600,000 Not selected District does not expect pavement segments to deteriorate as fast as model predicts
69 Hwy 89 Resurface Hwy 89 from Hwy 1 to 5-miles to the north $1,200,000 2027  
68 Hwy 11 Resurface Hwy 11 from Koochiching County Road 83 to Loman $2,300,000 Not selected District does not expect pavement segments to deteriorate as fast as model predicts 
68 Hwy 32 Resurface Hwy 32 from Fertile to Hwy 2 $3,500,000 2028  
68 US Hwy 75 Resurface Hwy 75 from Euclid to Warren $5,500,000 Not selected District does not expect pavement segment to deteriorate as fast as model predicts 
68 Hwy 171 Resurface Hwy 171 from North Dakota state border to Hwy 75 $400,000 2022  
67 Hwy 1 Resurface Hwy 1 from east Beltrami County line to Hwy 71 $1,000,000 2029  
67 Hwy 11 Resurface Hwy 11 from Baudette to west Koochiching County line $2,300,000 2030  
67 US Hwy 75 Resurface Hwy 75 from Hallock to Canadian Border $3,800,000 2022  
67 Hwy 175 Resurface Hwy 175 from Hallock to Hwy 59 $2,800,000 Not selected Not a district priority, will continue to monitor pavement performance 
66 US Hwy 75 Resurface Hwy 75 from Donaldson to Hallock $4,000,000 2027  
66 Hwy 92 Resurface Hwy 92 from Hwy 32 to Brooks $4,900,000 Not selected District does not expect pavement segment to deteriorate as fast as model predicts 
65 Hwy 89 Resurface Hwy 89 from Grygla to Hwy 219 $1,300,000 2028  
65 Hwy 200 Resurface Hwy 200 from west Clearwater County line to Hwy 92 $2,200,000 2021  
63 Hwy 1 Resurface Hwy 1 from Hwy 71 to Hwy 46 $200,000 Not selected Tied to a higher scoring pavement project
63 Hwy 92 Resurface Hwy 92 from Bagley to Clearwater County Road 22 $700,000 2026 Tied to another paving project
62 Hwy 220 Resurface Hwy 220 from Climax to Hwy 2 $6,100,000 Not selected District does not expect pavement segment to deteriorate as fast as model predicts 
61 Hwy 87 Resurface Hwy 87 from the southern Hubbard County line to Hwy 64 $200,000 Not selected Waiting to coordinate with another project
60 Hwy 32 Resurface Hwy 59 from Hwy 2 to Red Lake Falls $1,900,000 2028  
60 Hwy 113 Resurface Hwy 113 from west Hubbard County line to Hwy 71 $200,000 Not selected Waiting to coordinate with another project
59 Hwy 87 Resurface Hwy 87 from Hubbard County Road 13 to Hwy 64 $1,700,000 2025  
58 Hwy 1 Resurface Hwy 1 from the North Dakota border to 3-miles east $700,000 2025  
57 Hwy 200 Resurface Hwy 200 from Hwy 71 to Laporte $1,700,000 2029  
56 Hwy 1 Resurface Hwy 1 from 3-miles east of Oslo to Warren $4,700,000 2028  
55 Hwy 1 Resurface Hwy 1 from Hwy 219 to east Pennington County line $2,400,000 2028  
53 Hwy 89 Resurface Hwy 89 from Beltrami County Road 26 to Red Lake Nation boundary $3,600,000 Not selected  
50 US Hwy 59 Resurface Hwy 59 from Lake Bronson to Hwy 175 $1,300,000 2026 Selected prior to policy (In 2019-2028 CHIP)
48 Hwy 32 Resurface Hwy 32 from the south Norman County line to Hwy 200 $1,700,000 Not selected  
38 Hwy 9 Resurface Hwy 9 from Ada to the north Norman County line $2,400,000 Not selected  
38 Hwy 72 Resurface Hwy 72 from Lake of the Woods County Road 83 to Hwy 11 $3,300,000 Not selected  
37 Hwy 92 Resurface Hwy 92 from Gonvick to Clearwater County Road 22 $4,200,000 2026 Selected prior to policy (In 2019-2028 CHIP)
36 US Hwy 75 Resurface Hwy 75 from Warren to Argyle $1,600,000 Not selected  
35 Hwy 89 Resurface Hwy 89 from Hwy 11 to Canadian border  $2,200,000 Not selected  
34 Hwy 6 Resurface Hwy 6 from the Bigfork River Bridge to Hwy 6 $1,700,000 2030  
33 Hwy 92 Resurface Hwy 92 from Trail to Gonvick $2,200,000 Not selected  
30 Hwy 1 Resurface Hwy 1 from east Pennington County line to Hwy 89 $1,600,000 2029  
30 Hwy 220 Resurface Hwy 220 from Hwy 1 to Hwy 11 $7,300,000 Not selected  
29 Hwy 223 Resurface Hwy 223 from Hwy 92 to Clearwater County Road 10 $1,700,000 2025 Tied to a higher scoring pavement project
27 Hwy 317 Resurface Hwy 317 from end of Red River Bridge to Jct Hwy 220 $300,000 Not selected  
26 Hwy 308 Resurface Hwy 308 from Hwy 11 to Jct Hwy 89 $200,000 Not selected  
25 Hwy 200 Resurface Hwy 200 from Hwy 92 to Long Lake Park $1,300,000 Not selected  
21 Hwy 32 Resurface Hwy 32 from Hwy 200 to Fertile  $2,500,000 Not selected  
15 Hwy 1 Resurface Hwy 1 from north Pennington County line to Hwy 59 $2,300,000 Not selected  
9 Hwy 1 Resurface Hwy 1 from Warren to south Marshall County line $2,300,000 Not selected  
8 Hwy 72 Resurface Hwy 72 from the Tamarac River to 12-miles north of Waskish $2,000,000 Not selected  
6 Hwy 226 Resurface Hwy 226 from Hwy 34 to Hubbard County Road 7 $300,000 Not selected  

 

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
82 US Hwy 2 Major concrete rehabilitation eastbound from East Grand Forks to Fisher $11,000,000 2028  
78 US Hwy 2 Thin mill and overlay westbound from East Grand Forks to Fisher $12,000,000 2021  
78 US Hwy 2 Medium mill and overlay westbound lanes from Fosston to Bagley $9,500,000 2028  
76 US Hwy 2 Medium Mill and overlay from Fisher to Highway 75 $7,400,000 2029  
75 US Hwy 2 Medium mill and overlay from Wilton to Beltrami County Road 11 $4,600,000 2028  
75 US Hwy 59 Medium mill and overlay from from Highway 2 to Brooks $8,500,000 2029  
74 US Hwy 2 Full mill and thick overlay from Highway 9 to Highway 32 $6,200,000 2027  
73 US Hwy 2 Medium mill and overlay from Highway  59 to Fosston Golf Club Road $6,900,000 2027  
73 US Hwy 71 Reclaim and overlay from Park Rapids to Highway 200 $14,000,000 2029  
72 US Hwy 59 Medium mill and overlay from Brooks to Thief River Falls $11,000,000 2023  
72 US Hwy 71 Reclaim and overlay from Beltrami County Road 15 to Beltrami County Road 22 $6,200,000 2028  
71 US Hwy 71 Reclaim and overlay from Highway 197 to Beltrami County Road 15 $7,300,000 2022 NA
71 US Hwy 2 Medium mill and overlay from the south Beltrami County line to Midge Lake $8,000,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
70 Hwy 34 Reclaim and overlay from the west Hubbard County line to Park Rapids $3,100,000 2024 NA
68 US Hwy 71 Medium mill and overlay from Beltrami County Road 22 to Highway  72 $7,900,000 2024 NA
68 US Hwy 2 Medium mill and overlay from Perch Lake to Bagley $7,400,000 2027 NA
67 Hwy 11 Medium mill and overlay from Warroad to east Roseau County line $8,700,000 2027 NA
66 Hwy 32 Reclaim and overlay from Middle River to Highway  11 $14,000,000 2024 NA
65 US Hwy 2 Thin mill and overlay from Cass Lake to Hubbard County Road 25 $1,500,000 2025 NA
64 US Hwy 2 Thin mill and overlay from Crookston to Highway 9 $2,200,000 2025  
64 Hwy 11 Medium mill and overlay from the North Dakota border to 1-mile to the east $800,000 Not selected Waiting to coordinate with another project
64 Hwy 11 Medium mill and overlay from Karlstad to east Kittson County line $6,900,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
64 Hwy 34 Reclaim amd overlay from Akeley to the west Cass County line $3,500,000 Not selected Waiting to coordinate with another project
63 US Hwy 2 Medium mill and overlay from Crookston and Polk County Road 44 $6,100,000 Not selected District anticipates pavement conditions will not deteriorate as fast as the model predicts
62 US Hwy 2 Full mill and thick overlay from Polk County Road 44 to Highway 32 $4,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
62 US Hwy 59 Medium mill and overlay from Winger to Highway 2 $4,500,000 2021 Selected prior to policy (in 2019-2022 STIP)
59 Hwy 11 Reclaim and overlay from Roseau to Highway 313 $15,000,000 2025 Selected prior to policy (in 2019-2028 CHIP)
39 US Hwy 2 Reconstruction from from Highway 32 to Erskine $29,000,000 2021 Selected prior to policy (in 2019-2022 STIP)
33 US Hwy 2 Reconstruction from Highway 59 to Fosston $29,000,000 2022 Selected prior to policy (in 2019-2022 STIP)
27 Hwy 11 Medium mill and overlay from Williams to Lake of the Woods County Road 66 $7,500,000 Not selected NA
26 US Hwy 71 Medium mill and overlay from Lake George to Highway 71 $5,100,000 Not selected NA
25 Hwy 11 Reclaim and overlay from the west Roseau County line to Greenbush $13,000,000 Not selected NA
11 US Hwy 71 Thin mill and overlay from the north Wadena County line to Park Rapids $4,000,000 Not selected NA
9 US Hwy 71 Thin mill and overlay from Hubbard County Road 9 to Highway 2 $2,000,000 Not selected NA