Construction projects, plans and studies
Updated March 31, 2026
Search for a project
Browse by region
Browse by stage
Browse by highway number
Hwys 1–9
Hwy 1 — Ely Intersection Study
Evaluate intersection control options for Hwy 1 in Ely.
- Study completed
Hwy 1 — St. Louis and Lake County culvert repairs
Replace three culverts on Hwy 1 in St. Louis and Lake counties
- Scheduled for construction in 2026-2027
Hwy 2 — Cass Lake corridor study
Pedestrian safety and mobility improvement study to identify potential needs on Hwy 2 in Cass Lake
- Study underway
Hwy 2 — Proctor
4.8 miles of bituminous mill, overlay, pavement reclamation, ADA improvements through Proctor, and a new signal with safety and intersection improvements at Boundary Avenue.
- Scheduled for construction in 2027
Hwy 2 — Solway Township
Resurface 8.35 miles on Hwy 2 with detour
- Scheduled for construction in 2026
Hwy 2 and Hwy 169 — Grand Rapids/La Prairie corridor study
- Study underway
3rd Avenue/Hwy 65 — Minneapolis
Resurface 3rd Ave. South/Hwy 65 between Washington Ave. South and South 1st Ave. in Minneapolis, separate bike lanes from traffic lanes, reduce pedestrian crossing distances at crosswalks, and improve sight lines for both pedestrians and motorists.
- Scheduled for construction in 2027
Hwy 3 (Robert Street) — St. Paul
Improvements to Robert Street between Annapolis Street and Fillmore Avenue.
- Scheduled for construction in 2027-2028
Hwy 3 (South Robert Street) — West St. Paul
Assessment of South Robert Street between Mendota Road and Annapolis Street in West St. Paul to identify possible improvements to safety and accessibility for motorists, pedestrians, bicyclists and transit riders.
- Study completed
Hwy 3 — Rosemount to Farmington
Evaluated Hwy 3 from 160th Street in Rosemount to Second Street in Farmington to identify possible improvements to safety for motorists, pedestrians and bicyclists on Hwy 3.
- Study completed
Hwy 3 — Rosemount to Inver Grove Heights
Study of Hwy 3 from Hwy 62 in Inver Grove Heights to 160th Street in Rosemount to identify possible improvements to safety for motorists, pedestrians, and bicyclists.
- Study underway
Hwy 3 and Hwy 56 — Randolph Township
County led project to construct two roundabouts at County Road 86 and Hwy 3 and Hwy 56/Emery Avenue intersections.
- Scheduled for construction in 2026
Hwy 4 — Hector to Fairfax
Resurface Hwy 4, from Hwy 212 in Hector to Hwy 19 in Fairfax
- Scheduled for construction in 2026
Hwy 5 — Chanhassen to Victoria
MnDOT is partnering with Carver County to do preliminary design for 4-lane expansion and environmental documentation.
- Scheduled for construction in 2025-2027
Hwy 5/Stillwater Road — Maplewood
Reduce Hwy 5 from four lanes to three lanes between the intersection of McKnight Road/Minnehaha Avenue East and Lakewood Drive/Stillwater Avenue East in Maplewood.
- Scheduled for construction in 2026
Hwy 5 — Victoria
City of Victoria led project to improve the Hwy 5 and County Road 11 intersection and surrounding area.
- Scheduled for construction in 2025-2027
Hwy 5 (East Seventh St.) and Hwy 61 (Arcade St.) — St. Paul
Resurface East 7th Street and Arcade Street between I-94 in St. Paul and Roselawn Avenue in Maplewood, sidewalk repairs, and accessibility updates.
- Scheduled for construction in 2025-2026
Hwy 5 (West 7th Street) — St. Paul
Resurface and improve safety along Hwy 5 (West 7th Street) in St. Paul from Munster Avenue to Olive Street.
- Scheduled for construction in 2028-2029
Hwy 6 — Bigfork River Bridge
Reconstruct the bridge over the Bigfork River over Hwy 6 just north of the southern junction of Itasca County Road 14.
- Scheduled for construction in 2026
Hwy 6 — Outing to Remer
Resurface and improve Hwy 6 from the Roosevelt Lake bridge, just north of Cass Co. Rd. 58, in Outing and Hwy 200 in Remer.
- Scheduled for construction in 2026
Hwy 7 — Hopkins to St. Bonifacius
Study of Hwy 7 from Hopkins Crossroads in Hopkins to the western Hennepin County line in St. Bonifacius reported on existing conditions and evaluated potential ideas for improvement to the road.
- Study complete
Hwy 7 — Safety study
A safety study of Hwy 7 from just east of Hutchinson to Co. Rd. 9 in Lester Prairie
- Study completed
Hwy 7 — St. Louis Park to Hollywood study
Conducted a traffic safety investigation on Hwy 7 from Hwy 100 in St. Louis Park to Carver Co. Rd. 33 in Hollywood to determine if the number and severity of crashes was abnormal, determined the primary factors for the crashes, and proposed short-, medium-, and long-term updates to improve the safety of the highway.
- Study completed
Hwy 8 — Chisago County
Chisago County is leading a project to identity a long-term solution to improve safety and mobility along Hwy 8 from I-35 in Forest Lake to Karmel Avenue in Chisago County.
- Scheduled for construction in 2027-2029
Hwy 8/Lake Boulevard — Chisago to Taylors Falls
Study of Hwy 8/Lake Boulevard from Karmel Avenue in Chisago City to Taylors Fall will look at ideas for improvement for vehicle safety and mobility and connectivity for people walking, biking and rolling along the roadway.
- Study underway
Hwy 9 — south of Doran
Resurface Hwy 9 from Hwy 75 near Doran to Hwy 55.
- Scheduled for construction in 2026
Hwys 10–19
Hwy 10 — Audubon
MnDOT is conducting a corridor study to evaluate the transportation needs of Highway 10 (West Falcon Street to Broadway Street).
- Study underway
Hwy 10 — Coon Rapids
Repave Hwy 10 between Round Lake Boulevard and Hanson Boulevard, build additional lane in each direction, and construct noise walls.
- Scheduled for construction in 2025-2026
Hwy 10 — Detroit Lakes to Frazee
Resurface from County Road 54 to County Road 10 near Frazee
- Scheduled for construction in 2029
Hwy 10 — Elk River and Ramsey
Repave Hwy 10 between just west of Edison Street in Elk River and just east of Armstrong Boulevard Northwest in Ramsey. Construct J-turns at Cleveland Street/Ramsey Street, Alpine Drive and Beatty Street, build new trails and make accessibility improvements.
- Scheduled for construction in 2027
Hwy 10 — St. Cloud to Little Falls Study
This study will identify needs, gather public input through the Let’s Talk Transportation platform, and develop strategies to improve safety and mobility along 30 miles of Hwy 10, from E. Saint Germain Street in St. Cloud to the southern limits of Little Falls.
- Study scheduled for 2025-2026
Hwy 10 — Cushing
Improve access and safety on Hwy 10 through Cushing with two J-turn intersections at Morrison Co. Rd. 16 and Co. Rd. 11.
- Scheduled for construction in 2027
Hwy 10 — Moorhead to Dilworth
Reconstruct Hwy 10 from 13th Street in Moorhead to 34th Street near Dilworth
- Scheduled for construction in 2029-2030
Hwy 10 — east and west of Royalton
Resurface and improve both directions (nine miles each way) from west of Royalton to Iris Rd. near Little Falls; and east of Royalton to the Halfway Crossing, includes a J-turn at the Halfway Crossing (Benton Co. Rd. 40). Expect head-to-head traffic, delays.
- Scheduled for construction in 2027
Hwy 10 — St. Cloud to Haven Township study
Engineering study to design alternatives for a potential interchange on the north end and make access improvements to Sherburne Co. Rd. 7 in Haven Township.
- Engineering study 2025-2026
- St. Cloud to Clearwater corridor study completed
Hwy 10, Hwy 29, and Hwy 71 — Wadena
Expand Hwy 10 to four lanes from west of Wadena at 640th Ave. to east of Wadena at Oink Joint Rd. Resurface and update Hwy 71 and Hwy 29 in Wadena. Combined work includes sidewalks/trail, signals, new roundabouts, underground infrastructure, city utilities, new signals. Project requires detours.
- Scheduled for construction in 2025-2027
Hwy 10 and Hwy 75 — Moorhead
Resurface Hwy 75/8th Street in Moorhead; slurry seal on Hwy 10/Main Avenue with pilot restriping project
- Scheduled for construction in 2027
Hwy 10 and Hwy 75 — 11th Street Underpass
Two grade separations of Hwy 10/75 under the BNSF rail lines, paving, pedestrian accessibility improvements, utility replacements and signals.
- Scheduled for construction in 2024-2026
Hwy 10 and I-94 — Mississippi River crossings feasibility analysis between Brooklyn Park and Elk River
Updated previously conducted studies, re-engaged the cities and counties, and understood the need increased river crossing capacity.
- Study completed
Hwy 11 — Warroad to Roseau
Along with resurfacing, MnDOT plans to construct additional turn lanes and realign the section near the Roseau Airport.
- Scheduled for construction in 2026
Hwy 11 and Hwy 71 — International Falls corridor study
Study of Hwy 11 and Hwy 71 between the intersection of Koochiching County Road 91 to Hwy 53/Second Avenue
- Study underway
Hwy 12 — Delano to Independence
Explored options to improve safety on Hwy 12 between Hennepin Co. Rd. 90 in Independence and Co. Line Rd. in Delano.
- Study completed
Hwy 12 — Delano Study
Identified updates and possible solutions for safety and access for motorists and pedestrians along Hwy 12 between Bridge Ave. and Co. Rd. 139 in Delano.
- Study completed in 2025
Hwy 12 — Minnetonka to Wayzata
Reconstruct concrete on Hwy 12 between Shoreline Drive and Central Avenue North, repave and repair Hwy 12 between Central Avenue North and I-494, repair ramps, replace lighting and accessibility improvements.
- Scheduled for construction in 2026
Hwy 13 — Savage to Burnsville
Reconstructing Hwy 13 between Quentin Ave. in Savage and Nicollet Ave. in Burnsville.
- Scheduled for construction in 2027-2030
Hwy 13/Hwy 99 — south of Montgomery
Construct a roundabout at the intersection of Hwy 13 and Hwy 99 south of Montgomery.
- Scheduled for construction in 2026
Old Hwy 13/Sibley Memorial Hwy — Mendota Heights
Repave Sibley Memorial Hwy from the south intersection with Hwy 13/Mendota Heights Rd. to the north intersection with Hwy 13/Great River Rd., improve pedestrian ramps and accessibility, and drainage updates.
- Scheduled for construction in 2026
Hwy 14 — Culvert Replacements
Lincoln County-near Lake Benton. Replace three box culverts on Hwy 14 in Lincoln County 1.8 and 3.2 miles east of the Minnesota/South Dakota state line.
- Scheduled for construction in 2026
Hwy 14/Co. Rd. 44 and 7th St. — Olmsted County
Construct interchange at Hwy 14 and Olmsted Co. Rd. 44 and build bridge over Hwy 14 at 7th St. NW in Rochester — Olmsted County is leading project.
- Scheduled for construction 2026-2027
Hwy 14 — Eagle Lake Corridor Study
Study the segment of Hwy 14 between County Road 12 and Hwy 60 near Eagle Lake to identify opportunities for short and long-term safety improvements.
- Study underway
Hwy 14 and Broadway Ave. — Intersection Safety Improvements
Safety improvements with reconstruction of some portions of the intersection in Rochester
- Scheduled for construction in 2027
Hwy 14 and I-35 — Owatonna
Resurface Highway 14 and I-35 at Owatonna.
- Scheduled for construction in 2026
Hwy 14 — Stockton to Winona
Resurface Highway 14 from Stockton to Winona.
- Scheduled for construction in 2026
Hwy 15 at Hwy 10 — Sauk Rapids
Reconstruct the northbound Hwy 15 overpass to westbound Hwy 10 in north Sauk Rapids, Benton County. Project requires detours and changes to access. .
- Scheduled for construction in 2027
Hwy 18 — Malmo
Replace box bridge over the Marmon Creek between 327th Pl. and 325th Ave. in Malmo, Aitkin County. Project requires a detour.
- Scheduled for construction in 2026
Hwy 19 — Lonsdale
Construction of a roundabout to improve intersection safety and traffic mobility at Hwy 19 and Rice Co. Rd. 2 north of Lonsdale.
- Scheduled for construction in 2026
Hwy 19 — Marshall
Reconstruct Hwy 19/College Drive through Marshall
- Scheduled for construction in 2025-2026
Hwy 19 — Northfield
Reconstruct and improve Highway 19 between Decker Avenue and the Union Pacific Railroad tracks. Includes a roundabout at Armstrong Road, adding a third lane from Decker to the tracks and pedestrian and bicycling improvements.
- Scheduled for construction in 2028
Hwy 19 — Rice County
Resurface Highway 19 from Decker Avenue to I-35.
- Scheduled for construction in 2026
Hwys 20–29
Hwy 22 — Dodd Road in St. Peter
Study the segment of Hwy 22 in St. Peter from Hwy 169 to Nicollet County Road 20 to identify opportunities to improve safety and traffic flow for a future project.
- Study completed
Hwy 22 — Mankato to St. Peter
Reconstruct roadway from Mankato to St. Peter; construct roundabout at CR 21 in Kasota; prepare for future construction of a multimodal Minnesota River State trail to connect Mankato and St. Peter
- Scheduled for construction in 2025-2026
Hwy 22 and Hwy 109 — Wells
Reconstruct Hwy 22 through the City of Wells, as well as Hwy 109 from west of Rose Hill Cemetery to Hwy 22; replace utilities
- Scheduled for construction in 2026-2027
Hwy 23 — Clara City
Construct an all-way stop controlled intersection at Hwy 23 and Hwy 7 in Clara City.
- Scheduled for construction in 2026
Hwy 23 — Milaca
Reconstruct Hwy 23 through Milaca in Mille Lacs County, includes the road surface, new roundabouts, drainage, multi-use trail and sidewalks.
- Scheduled for construction in 2027
Hwy 23 — Mission Creek highway realignment and bridge replacement
Replace old bridge and realign highway
- Scheduled for construction in 2029
Hwy 23 — New London
Construct an interchange at Hwy 23 and Hwy 9 in New London
- Scheduled for construction in 2027-2028
Hwy 23 and Tiger Drive — Marshall
Construct a J-turn at the intersection of Hwy 23 and Tiger Drive, just north of Marshall Senior High School and Southwest Minnesota State University.
- Scheduled for construction in 2028
Hwy 23 — Rockville
Improve access and safety at the intersection of Hwy 23 and Stearns Co. Rd. 8 in Rockville with a J-turn design.
- Scheduled for construction in 2027
Hwy 23 — Waite Park
Improve intersection access and safety with a J-turn design at Hwy 23 and Bel Clare Dr.
- Scheduled for construction in 2027
Hwy 23 — Willmar Bypass
Collecting early design concepts and environmental information to inform project development
- Data and survey collection: spring 2027 through fall of 2027
Hwy 24 — Clearwater
Reconstruct the interchange and bridge over I-94 between 179th St. and Smith St. in Clearwater, Wright County. Includes: Roundabouts, flow/entrance improvements and sidewalk/trail
- Scheduled for construction in 2026-2027
Hwy 25 — Buffalo to Monticello
Resurface and improve access on Hwy 25 between Catlin St. in Buffalo to near Wright Co. Rd. 106/85th St. south of Monticello.
- Scheduled for construction in 2026
Hwy 25 Study — Monticello to Big Lake
Identify needs and potential future improvements, develop recommendations for the corridor, and determine upcoming pavement and safety improvements.
- Study underway
Hwy 25 at I-94 — Monticello
Resurface and update the Hwy 25 interchange bridge over I-94 in Monticello, Wright County.
- Construction scheduled for 2027
Hwy 25 — Monticello to Big Lake
Identify needs and potential future improvements, develop recommendations for the corridor, and determine upcoming pavement and safety improvements.
- Study underway
Hwy 27 and Hwy 169 — north of Onamia
Improve access and safety at the intersection with a new roundabout.
- Scheduled for construction in 2026
Hwy 27 — Wahkon
Reconstruct and improve Hwy 27 (Main St.) from east of Chippewa Ave. to east of Fourth St. W in Wahkon, Mille Lacs County. Includes storm drainage, sidewalks and bike lanes.
- Scheduled for construction in 2026
Hwy 28 — Morris to Starbuck
Resurface, replace culverts, repair bridge, and reconstruct in Cyrus, including utility replacements, sidewalk upgrades
- Scheduled for construction in 2026
Hwy 29 — Alexandria
Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction.
- Study completed
Hwy 29 — Alexandria (8th Ave to 18th Ave)
Reconstruct Hwy 29 in downtown Alexandria.
- Scheduled for construction in 2028
Hwys 30-39
Hwy 30 — Rochester
Resurface Hwy 30 from 44th Ave. SW to Hwy 63. Replace the Willow Creek culvert and make other drainage improvements.
- Scheduled for construction in 2026
Hwy 30 — Stewartville
Resurface Hwy 30 from Hwy 63 to 5th Ave. NE.
- Scheduled for construction in 2028
Hwy 33 — Cloquet
Study and constructing Hwy 33 corridor from Doddridge Ave. to St. Louis River Bridge
- Scheduled for construction in 2028
Hwys 34 and 371 — Walker Corridor Study
This study evaluated potential options available to improve safety for all modes of traffic along Hwy 371 and Hwy 34 in Walker. Construction date to be determined.
- Study completed
I-35 — Albert Lea Lake
Repair I-35 southbound and northbound bridges at Albert Lea.
- Scheduled for construction in 2026
I-35 and I-90 — Interchange Corridor Study
Study of Interstate 35/Interstate 90 interchange corridor near Albert Lea to guide improvements.
- Study underway
I-35 — Burnsville to Lakeville
Study of I-35 between I-35W/35E split in Burnsville and 210th Street in Lakeville to gain an understanding of corridor needs, identify potential future improvements, and determine how and when these improvements should be implemented.
- Study completed
I-35 — pedestrian bridge
Replace pedestrian bridge over I-35/Mesaba Avenue interchange in Duluth
- Scheduled for construction in 2026
I-35E — St. Paul
Reconstruct ramp, replace stairs, paint and install salvaged ornamental railing on the pedestrian/bicycle bridge south of Kellogg Boulevard in St. Paul.
- Scheduled for construction in 2026
I-35E over Shepard Road — St. Paul to Lilydale
Replace the I-35E bridge over Shepard Rd. near downtown St. Paul and concrete repairs on the I-35E Mississippi River bridge.
- Scheduled for construction in 2026-2027
I-35E and Ramsey County Road J — Lino Lakes, White Bear Township and North Oaks
County-led project to construct a new interchange at I-35E and add ramps to/from I-35E and Anoka County Road J. Construction includes a roundabout at Centerville Road and County Road J.
- Scheduled for construction in 2025-2026
I-35E, I-94 and Hwy 52 Lafayette Bridge — St. Paul
Provide ideas and proposals to improve safety and traffic flow in the Hwy 52/I-94/I-35E Interchange area, identify the current issues, determine potential solutions to address those issues and evaluate those solutions.
- Study completed
I-35W — Burnsville
Bridge replacement and resurfacing of I-35W between Cliff Road and the I-35/I-35E/I-35W split in Burnsville.
- Scheduled for construction in 2025-2026
Hwy 36 — Roseville to Maplewood
The Hwy 36 study from I-35W in Roseville to English St. in Maplewood reported on existing conditions and evaluated potential future improvements to the road.
- Study completed
Hwy 36 and County Hwy 17 — Lake Elmo Avenue Interchange
Locally led project to construct interchange at Lake Elmo Avenue (Washington County Hwy 17) and Hwy 36.
- Scheduled for construction in 2026-2027
Hwys 40-59
Hwy 40 — Milan
Resurface Hwy 40 from Hwy 119 west of Milan to 5th Street in Milan
- Scheduled for construction in 2026
Hwy 40 — Milan bridge to culvert replacement
Replacing a bridge on Hwy 40, located 3 miles south of Lac Qui Parle Valley Middle/High School, with a new box culvert
- Scheduled for construction in 2026
Hwy 40 — Willmar
Construct a left & right turn lane on Hwy 40 from 1300' east of CR 55, to 1400' west of CR 5
- Scheduled for construction in 2026
Hwy 41 — Chanhassen
Locally led project to build a roundabout at Hwy 41 and the entrance to School.
- Scheduled for construction in 2028
County Road 42, Hwy 52 and Hwy 55 — Inver Grove Heights and Rosemount
The Hwy 52, Hwy 55 and County Road 42 in Rosemount and Inver Grove Heights study will evaluate rerouting Hwy 55 traffic to County Road 42 and determine a long term vision for the area.
- Study underway
County Road 42 — Rosemount
County led project to upgrade the County Road 42 and Hwy 52 interchange by widening County Road 42 and the ramps that connect to Hwy 52.
- Scheduled for construction in 2026
Hwy 43 — Winona
Resurface Hwy 43 from Mankato Ave to the Mississippi River Bridge. Reconstruct sidewalks, Improve mobility and safety for all.
- Scheduled for construction in 2028
Hwy 44/Hwy 76 roundabout — Caledonia
Construction of a roundabout at Hwy 44 and Hwy 76 in Caledonia
- Scheduled for construction in 2028
Hwy 44 — Spring Grove, Caledonia, Hokah
Resurface Highway 44 from Spring Grove to Hokah, a nearly 22-mile corridor
- Scheduled for construction in 2030
Hwy 45 and Hwy 210 — Carlton Corridor Study
Studying the Hwy 45 and Hwy 210 corridors in preparation for resurfacing projects tentatively planned for 2035
- Study ongoing through 2026
Hwy 47/University Avenue — Columbia Heights to Blaine
Construction on University Avenue between 37th Avenue in Columbia Heights and just north of 85th Avenue in Blaine. This project will coordinate design with other highway projects and the planned Metro Transit F-Line route.
- Scheduled for construction in 2030
Hwy 47/University Avenue Northeast — Minneapolis
Repave University Avenue Northeast from Hwy 65 to 27th Avenue Northeast in Minneapolis, accessibility improvements, sidewalk improvements, replace guardrail and repair drainage.
- Scheduled for construction in 2027
Hwy 47/University Avenue Southeast and Fourth Street Southeast — Minneapolis
Repave University Avenue Southeast and Fourth Street Southeast between Central Avenue and I-35W, make ADA improvements to intersections and crossings, bus stop improvements to correspond with the upcoming E Line Bus Rapid Transit route, and bike lane improvements.
- Scheduled for construction in 2027-2028
Hwy 47 — west of Isanti
Construct two single-lane roundabouts to improve access and safety on Hwy 47 at the intersections of Isanti Co. Rd. 5 (south of Bradford) and Co. Rd. 8 (north of St. Francis).
- Scheduled for construction in 2029
Hwy 47 — St. Francis
A planning study of the Hwy 47 St. Francis corridor to examine a range of alternatives to address pedestrian, bicycle and motorist safety, as well as road capacity, and access and mobility issues.
- Scheduled for construction in 2028-2029
Hwy 47 (Ferry Street) and BNSF Railroad Crossing — Anoka
This study evaluated the BNSF railroad crossing, Martin Street and Pleasant Street intersections and Hwy 47 alignment.
- Study completed
Hwy 47 and Hwy 65 — Northeast Minneapolis to Blaine and Spring Lake Park
This Planning and Environmental Linkage (PEL) study will create a shared community vision for the improvements that are needed most. Public input and technical data will be used to create and evaluate potential future alternatives that will serve all users.
- Study completed
Hwy 50 — Hampton to Douglas Township
Repave Hwy 50 from Hwy 52 in Hampton to Hwy 61 in Douglas Township, update drainage, improve safety by adding a right turn lane in Hampton Township, and improving accessibility by adding a pedestrian ramp and sidewalk in New Trier.
- Scheduled for construction in 2026
Hwy 51 (Snelling Avenue) — Roseville and Arden Hills
Repair and resurface Snelling Avenue between Hwy 36 in Roseville and Grey Fox Road in Arden Hills. Construct a trail along the west side of Snelling Avenue between Lydia Avenue and Old Snelling Road. Signal work, drainage, guardrail replacement and ADA improvements.
- Scheduled for construction in 2026
Hwy 51 (Snelling Avenue) and Montreal Avenue — St. Paul
Study of Snelling Ave. and Montreal Ave. from Dayton Ave. to Hwy 5/West Seventh St. in St. Paul to understand what needs and opportunities exist in the area to help inform future projects along the road.
- Study underway
Hwy 52, Hwy 55, County Road 42 — Inver Grove Heights and Rosemount
The Hwy 52, Hwy 55 and County Road 42 in Rosemount and Inver Grove Heights study will evaluate rerouting Hwy 55 traffic to County Road 42 and determine a long term vision for the area.
- Study underway
Hwy 52 — Chatfield to Fountain
In 2027, MnDOT will resurface Hwy 52 and replace box culverts.
- Scheduled for construction in 2027
Hwy 52 — Hader to Zumbrota corridor study
MnDOT and Goodhue County are analyzing and evaluating the Hwy 52 corridor between Zumbrota and Hader.
- Study completed
Hwy 52 — Inver Grove Heights
Construct a noise wall along southbound Hwy 52 from south of Southview Boulevard/Mendota Road to 49th Street East in Inver Grove Heights.
- Scheduled for construction in 2026
Hwy 52 Lafayette Bridge, I-94 and I-35E — St. Paul
Provide ideas and proposals to improve safety and traffic flow in the Hwy 52/I-94/I-35E Interchange area, identify the current issues, determine potential solutions to address those issues and evaluate those solutions.
- Study completed
Hwy 52 Lafayette Freeway — St. Paul
Rebuild pedestrian/bicycle bridge over Hwy 52 at Lewis Street (north of Butler Avenue and south of Caeser Chavez Street).
- Scheduled for construction in 2026
Hwy 53 — Eveleth Rock Ridge Transportation Improvements
Intersection improvements and pavement resurfacing on Hwy 53 from Hwy 37 to Vermillion Drive in Eveleth
- Scheduled for construction in 2025-2026
Hwy 53 — Hermantown
Resurface pavement on Hwy 53 from Haines Rd to Midway Rd in Hermantown.
- Scheduled for construction in 2026
Hwy 53 — Trinity Road
Resurface pavement between Piedmont Ave and Hwy 194/Mesaba Ave in Duluth
- Scheduled for construction in 2028
Hwy 53 — Virginia intersection revision
Revise intersection of Hwy 53 and 9th Street N/Cty Rd 102 in Virginia
- Scheduled for construction in 2027
Hwy 55, Hwy 52, County Road 42 — Inver Grove Heights and Rosemount
The Hwy 52, Hwy 55 and County Road 42 in Rosemount and Inver Grove Heights study will evaluate rerouting Hwy 55 traffic to County Road 42 and determine a long term vision for the area.
- Study underway
Hwy 55 — Hastings
Replace traffic signals along Hwy 55 between Pleasant Drive and Westview Drive in Hastings and replace pedestrian ramps at Pleasant Drive and Westview Drive.
- Scheduled for construction in 2025-2026
Hwy 55 — Minneapolis and Mendota Heights
Raise railing height on Hwy 55 Mendota Bridge from Hwy 5 in Minneapolis to Hwy 62 in Mendota Heights.
- Scheduled for construction in 2026
Hwy 55/Hiawatha Avenue — Minneapolis
Pedestrian safety and accessibility improvements to the intersections of Hwy 55/Hiawatha Avenue and 46th Street East and 45th Street East in Minneapolis.
- Scheduled for construction in 2026
Hwy 55 — Paynesville
Replace and improve the Hwy 55 (Hwy 4) bridge over the North Fork Crow River in Paynesville. The project requires a detour over the 2026-2027 winter season.
- Scheduled for construction in 2026-2027
Hwy 55 (Olson Memorial Hwy) — Minneapolis
Resurface Olson Memorial Highway between Border Avenue/Oak Lake Avenue and the bridge west of Thomas Avenue. The project also includes safety and accessibility improvements, curb and sidewalk repairs, traffic signal replacements and lighting improvements.
- Scheduled for construction in 2029
Hwy 56 — north of Kenyon
Replace Hwy 56 box culvert approximately 4.4 miles north of Kenyon.
- Scheduled for construction 2026
Hwy 56 and Hwy 3 — Randolph Township
County led project to construct two roundabouts at County Road 86 and Hwy 3 and Hwy 56/Emery Avenue intersections.
- Scheduled for construction in 2026
Hwy 57 and County Road 16 roundabout — Dodge County
Repave a section of Hwy 57 and build a roundabout
- Scheduled for construction in 2027
Hwy 59 — Lake Bronson
Resurface Hwy 59 from Lake Bronson to Highway 175. The project also includes urban reconstruct with sidewalk upgrades in Lake Bronson. There will be a culvert replacement one-half mile south of Lake Bronson.
- Scheduled for construction in 2028
Hwy 59 — Mahnomen pedestrian study
Studying safety improvements for people walking along and across Hwy 59 in the City of Mahnomen
- Study underway
Hwy 59 — Worthington
Reconstruct Hwy 59 (also referred to as Humiston Ave. and Oxford St.) in Worthington
- Scheduled for construction in 2027-2028
Hwy 59 — culvert replacements north of Marshall
This project involves replacing two culverts on Hwy 59, located approximately 5.6 miles north of Marshall
- Scheduled for construction in 2026
Hwy 59 — Thief River Falls
a corridor study to improve pedestrian and vehicle safety, highway access, stormwater drainage, and pavement condition to create a welcoming gateway to the City.
- Study underway
Hwys 60-79
Hwy 60 — Mountain Lake
Study the segment of Hwy 60 near Mountain Lake to identify opportunities to improve safety and traffic flow for a future project.
- Study completed
Hwy 61 — Little Marais to Tofte corridor study
Study Hwy 61 from 2.6 miles north of Little Marais Road/Cty Rd 6 to just north of Leveaux Ridge Road
- Study underway
Hwy 61 — Duluth
Resurface Hwy 61 from Lester River bridge to Superior St and improve intersections.
- Scheduled for construction in 2029
Hwy 61 — Little Marais to Tofte pavement resurfacing
Resurface pavement between 2.6 miles north of Little Marais Road/County Rd 6 in Lake County to just north of Leveaux Ridge Road in Cook County
- Scheduled for construction in 2027
Hwy 61 — Grand Marais culverts
Replace six culverts north of Grand Marais along Hwy 61
- Scheduled for construction in 2025-2026
Hwy 61 — Hastings
Reconstruct Hwy 61 to improve safety and accessibility between Fourth Street and 36th Street in Hastings.
- Scheduled for construction in 2027-2028
Hwy 61 — Lake County
Install new efficient tunnel lighting systems
- Scheduled for construction in 2025-2026
Hwy 61 — London Road project
Repave London Road from 26th Avenue East to 60th Avenue East; intersection improvements
- Scheduled for construction in 2026-2027
Hwy 61 — Maplewood and White Bear Lake
Reconstruct concrete pavement on Hwy 61, build a dual left turn lane for northbound Hwy 61 to westbound I-694, replace the signal systems at the Hwy 61 interchange with I-694 and the intersection with 2nd Street and upgrade sidewalks and trails along the highway.
- Scheduled for construction in 2027
Hwy 61 — St. Paul
Study of Hwy 61 from I-94 to Lower Afton Road in St. Paul to determine what safety, mobility and accessibility improvements are needed for a 2027 resurfacing project.
- Study completed; scheduled for construction in 2027
Hwy 61 — Two Harbors
Resurface Hwy 61 from Cty Rd 61 to Park Rd and construct roundabouts in Two Harbors.
- Scheduled for construction in 2027-2028
Hwy 61 (Arcade St.) and Hwy 5 (East 7th St.) — St. Paul
Resurface East 7th Street and Arcade Street between I-94 in St. Paul and Roselawn Avenue in Maplewood, sidewalk repairs, and accessibility updates.
- Scheduled for construction in 2025-2026
Hwy 62 — Edina
Updating westbound Hwy 62 auxiliary lane and widening inside shoulder between Valley View Road and Hwy 100 and possible noise wall construction.
- Scheduled for construction in 2028
Hwy 62 — Minneapolis
Reconstruct Hwy 62 between 28th Avenue South and 46th Avenue South in Minneapolis, resurface the Hwy 62 bridge over 28th Avenue South, remove the pedestrian overpass at 40th Avenue South and widen the sidewalk on the 43rd Avenue South overpass.
- Scheduled for construction in 2027-2029
Hwy 63 and Hwy 247 — Olmsted County
Construct a roundabout at Hwy 63 and Hwy 247 in Olmsted County.
- Scheduled for construction in 2027
Hwy 63 — Spring Valley Reconstruction
Reconstruct portions of Hwy 16/Hwy 63 and make improvements for pedestrians to meet current Americans with Disabilities Act.
- Scheduled for construction in 2029
Hwy 65 — Blaine
Reconstruct Hwy 65 as a freeway-design between 97th Ave. and 125th Ave./Main Street, with interchanges. Reroute existing local street/driveway connections onto frontage/backage roads. Reconstruct existing sidewalks along the roadway to meet Americans with Disability Act (ADA) standards.
- Scheduled for construction in 2026-2030
Hwy 65 — Cambridge to north of Braham
Resurface and install updates over 10 miles of road from south of 357th Ave. NE at the end of four-lane in Cambridge, Isanti County, to south of Kanabec Co. Rd. 45/128th Ave., includes drainage pipes and sidewalk in Grandy. Work will be done in segments and require detours.
- Scheduled for construction in 2026
Hwy 65 — Ham Lake to Spring Lake Park study
The study examined a range of cost-effective roadway alternatives to address capacity, access, mobility and safety issues between Bunker Lake Boulevard (Anoka County Road 116) in Ham Lake and County Road 10/Mounds View Boulevard in Spring Lake Park.
- Study completed
Hwy 65 and 3rd Avenue — Minneapolis
Resurface 3rd Ave. South/Hwy 65 between Washington Ave. South and South 1st Ave. in Minneapolis, separate bike lanes from traffic lanes, reduce pedestrian crossing distances at crosswalks, and improve sight lines for both pedestrians and motorists.
- Scheduled for construction in 2027
Hwy 65 — Mora
Reconstruct, improve access and update Hwy 65 through Mora, Kanabec County, includes new roundabouts and connections, city utilities and pedestrian sidewalk/trail.
- Construction scheduled for 2030-2031
- Study completed in 2024
Hwy 65 and Central Avenue — Minneapolis and Columbia Heights
Reconstruction of Central Avenue Northeast from University Avenue Southeast in Minneapolis and I-694 in Columbia Heights that will incorporate Metro Transit's proposed F Line Bus-Rapid Transit route.
- Scheduled for construction in 2028
Hwy 67 — Granite Falls
Guardrail, rumble strips, striping, cul-de-sac addition, and bridge removal
- Scheduled for construction in 2024-2026
Hwy 67 and Hwy 23 — Granite Falls
Realign Hwy 67 with Hwy 23 at the existing intersection
- Scheduled for construction in 2027
Hwy 71 — Olivia
Install a weigh-in-motion sensor system plus two pull-off locations on Hwy 71 south of Olivia between Bayberry Ave and .5 miles south of 790th Ave
- Scheduled for construction in 2026
Hwy 71 — Turtle River to Tenstrike
Hwy 71 between Turtle River and Tenstrike will be reconstructed in the summer of 2026.
- Scheduled for construction in 2026
Hwy 71 — South Wadena County
Update and resurface five miles of Hwy 71 from Franklin Ave. to Todd County Line Rd., Wadena County, includes sidewalks in the city of Wadena.
- Construction scheduled for 2029
Hwy 71 — Sauk Centre
Reconstruct and improve safety on Hwy 71 in Sauk Centre, Stearns County. Project requires a detour.
- Scheduled for construction in 2028
Hwy 71 and Hwy 210 — Hewitt
Install a roundabout to improve access and safety at the intersection of Hwy 71/210 in Hewitt, northwest of the Wing River, Todd County.
- Scheduled for construction in 2027
Hwy 71 and Hwy 23 — Willmar
Resurface southbound lanes of Hwy 71 from the south end of the Hwy 23 bypass to the Business Hwy 71 split, and Hwy 23 from CR 5 to the start of the Hwy 23 bypass
- Scheduled for construction in 2025-2026
Hwy 71 and Hwy 87 — Sebeka to Menahga
Reconstruct and repair over 12 miles of highway road surface in Wadena County, replace underground stormwater structures, and update pedestrian sidewalks and approaches on Hwy 71 in Menahga
- Scheduled for construction in 2028
Hwy 73 — Chisholm
Resurface Hwy 73 from West Lake Street and 4th Avenue to 13th Street NW/McNiven Road
- Scheduled for construction in 2027
Hwy 73 — Chisholm Corridor Study
Studying from Hwy 169 to the intersection of W. Lake Street and 3rd Avenue.
- Study underway
Hwy 73 — Kettle River
Reconstruct Hwy 73 from Hwy 27 to 3rd Avenue in Kettle River
- Scheduled for construction in 2029
Hwy 74 — Bridge replacement
Replace the Hwy 74 bridge over the South Fork Whitewater River
- Scheduled for construction in 2027
Hwy 74 — Whitewater State Park culvert replacement
Replacement of two culverts on the highway in state park. Detours will be in place as each culvert is removed and replaced.
- Scheduled for construction in 2026
Hwy 75 — Argyle
Replacement project on Highway 75, one mile south of Argyle
- Scheduled for construction in 2026
Hwy 75 — Luverne
Resurface Hwy 75 through the City of Luverne from the intersection with Main St. to Veterans Dr.
- Scheduled for construction in 2026
Hwy 75 — Luverne to Trosky
Resurface Hwy 75 from Veterans Dr. in Luverne to Rock Co. Rd. south of Trosky
- Scheduled for construction in 2027
Hwy 75 — Moorhead
Resurface Hwy 75 in Moorhead from south of 46th Avenue to south of the roundabout at County Road 12
- Scheduled for construction in 2026
Hwy 75 and Hwy 14 — Lake Benton to Tyler
Reconstruction of Hwy 75 in Lake Benton and resurfacing of Hwy 14 from Lake Benton to Lincoln/Lyon county line.
- Scheduled for construction in 2027
Hwy 76 — Houston to Caledonia
Resurface Highway 76 mill and overlay from Houston to Caledonia
- Scheduled for construction in 2028
Hwy 77 (Cedar Ave.) — Apple Valley to Richfield
Repair and resurface Hwy 77 between 138th Street in Apple Valley and the Minnesota River bridge in Eagan and repair ten bridges in the area.
- Scheduled for construction in 2026-2028
Hwy 78 — Perham through Ottertail
A corridor study to evaluate safety for pedestrians, bicyclists, and drivers along the Hwy 78 corridor from Hwy 10 in Perham to Wagon Trail Loop south of Ottertail.
- Study underway
Hwys 80-99
Hwy 89 — Roseau
Reconstruct Hwy 89 between Hwy 11 and south of Seventh St in Roseau.
- Scheduled for construction in 2028
Hwy 89 — Wannaska
Resurface Hwy 89 from the Marshall/Roseau county line to north city limits of Wannaska. The project also includes sidewalk upgrades in Wannaska and centerline culvert replacements throughout the project limits.
- Scheduled for construction in 2026
I-90 — Austin bridge reconstruction
Replacing and repairing six bridges.
- Scheduled for construction in 2024-2026
I-90 — Austin to Dexter (eastbound)
Resurface eastbound I-90 from Austin to Dexter. The work includes resurfacing and improving exit and entrance ramps.
- Scheduled for construction in 2028-2029
I-90 — bridge replacement
Replace the eastbound I-90 bridge over Freeborn County Road 46. Additonal improvements to the eastbound exit ramp.
- Scheduled for construction in 2028
I-90 — Nodine to Dakota
Repaving I-90 and replacing westbound bridge. Nodine to Dakota in Winona County.
- Scheduled for construction in 2026
I-90 — Olmsted and Winona counties
Resurface westbound I-90 from Hwy 74 to Hwy 43.
- Scheduled for construction in 2026
I-90 — Winona County
Resurface I-90 westbound west of Highway 43 to west of Highway 76.
- Scheduled for construction in 2029
I-90 — Worthington
Improve the pavement and bridges on I-90 from Diagonal Rd. to Hwy 60 in Worthington
- Scheduled for construction in 2026-2028
I-90 and Hwy 52 — Interchange reconstruction
Construction will occur at the I-90 and Hwy 52 interchange, southeast of Rochester.
- Scheduled for construction in 2024-2026
Hwy 92 — Badger Creek
for a box culvert replacement project on Highway 92, over Badger Creek. The detour would be the biggest concern for the locals.
- Scheduled for construction in 2024-2026
Hwy 93 — Henderson
Raise Hwy 93 from the intersection of Hwy 169 to the southern limits of Henderson, putting it above the 100-year flood elevation.
- Scheduled for construction in 2024-2026
I-94 Gap — Albertville to Monticello
Expand I-94 to three lanes in each direction between Albertville and Monticello, Wright County; includes drainage and bridges.
- Scheduled for construction in 2024-2026
I-94 — Sauk Centre to Melrose
Four bridges over the Sauk River will be improved between Sauk Centre and Melrose—eastbound bridge decks will be repaired in 2026, and westbound bridges fully rebuilt in 2027. Expect delays, one-lane traffic, 24/7
- Scheduled for construction in 2026-2027
I-94, I-35E and Hwy 52 Lafayette Bridge — St. Paul
Provide ideas and proposals to improve safety and traffic flow in the Hwy 52/I-94/I-35E Interchange area, identify the current issues, determine potential solutions to address those issues and evaluate those solutions.
- Study completed
I-94 — west of Evansville to Grant/Otter Tail County line
Concrete resurface westbound lanes, replace guardrail, line culverts and minor bridge work
- Scuheduled for construction in 2026
I-94 and I-394 — Minneapolis
Repairing bridges and ramps along I-394 and I-94 between downtown Minneapolis and the Penn Avenue bridge, realigning the I-394 to Dunwoody Boulevard ramp, replacing the deck for the Penn Avenue bridge that crosses over I-394, and other improvements along I-394 between Hwy 100 and I-94.
- Scheduled for construction in 2025-2026
I-94 and Hwy 10 — Mississippi River crossings feasibility analysis between Brooklyn Park and Elk River
Updated previously conducted studies, re-engaged the cities and counties, and understood the need increased river crossing capacity.
- Study completed
I-94 and Hwy 336 to Red River Bridge — Moorhead
Corridor study to determine short and long-term improvements between Hwy 336 and the Red River Bridge.
- Study underway
I-94 — Rethinking Minneapolis to St. Paul
MnDOT, along with FHWA, Ramsey & Hennepin Counties and the cities of St. Paul and Minneapolis, are preparing a Tiered Environmental Impact Statement for the Rethinking I-94 effort. Rethinking I-94 intends to reconnect neighborhoods, revitalize communities and ensure residents have a meaningful voice in transportation decisions that affect their lives.
- Environmental review underway
I-94 — Minneapolis
Rebuild 22nd Avenue South pedestrian bridge over I-94 between 9th Street South and Butler Place in Minneapolis.
- Scheduled for construction in 2028
I-94 — Moorhead communications upgrades
Install fiber optic upgrades, new overhead message boards and highway cameras
- Scheduled for construction in 2026
I-94 — snow fence projects
Install snow fence in various locations along I-94 between Moorhead and Osakis
- Scheduled for construction in 2026, 2027 and beyond
Hwy 95 — Cambridge
Reconstruct or expand segments of Hwy 95 between Fern St. and Fillmore St. in Cambridge, Isanti County; includes underground city utilities, accesses and sidewalks.
- Scheduled for construction in 2026-2027
Hwy 95 — Denmark Township
Construct a single lane roundabout at the intersection of Hwy 95 and Hwy 22/70th Street.
- Scheduled for construction in 2027
Hwy 95 — Franconia Township
Constructing dedicated left and right turn lanes on Hwy 95, realigning County Road 26/Pleasant Valley Road and constructing a roundabout at Hwy 95 at Hwy 243/260th Street, reconstruct existing shoulders and upgrade drainage.
- Scheduled for construction in 2026
Hwy 95 — Woodbury and Afton
Construct roundabout at Hwy 95 and the County Hwy 18/40th Street/Bailey Road intersection in Woodbury and Afton, resurface road, build pedestrian and bicyclist trail, improve accessibility and drainage.
- Scheduled for construction in 2026
Hwy 97 — Forest Lake
Hwy 97 between I-35 and Hwy 61 in Forest Lake will undergo a pavement reconstruction project. Additional work includes constructing a single-lane roundabout and multi-use trail, adding raised median, upgrading pedestrian accessibility and repair/replacing drainage.
- Scheduled for construction in 2025-2026
Hwy 99 — Le Center
Reconstruct Hwy 99 in Le Center, from Maple Ave. to Cordova Ave.
- Scheduled for construction in 2029
Hwys 100-199
Hwy 100 and Vernon Avenue — Edina
Replace the bridge over Hwy 100 and the Vernon Avenue Bridge (County Road 158) over the Canadian Pacific (CP) Railroad.
- Scheduled for construction in 2025-2026
Hwy 104 — Glenwood to Hwy 9
Resurface Highway 104 from Glenwood to junction of Highway 9 near Sunburg.
- Scheduled for construction in 2032
Hwy 107 — Braham
Resurface and improve Highway 107 from Highway 65 to Sixth Street Northwest (Isanti County Road 4) in Braham, which includes new storm sewer, city water main and pedestrian updates.
- Scheduled for construction in 2027 or 2028
Hwy 108 — Henning
Reconstruct Hwy 108 in Henning, utility replacements, bicycle and pedestrian accessibility upgrades.
- Scheduled for construction in 2033
Hwy 113 — Elbow Lake Village
Resurface Hwy 13 from CR 4 to Hwy 71.
- Scheduled for construction in 2032
Hwy 114 — Lowry to I-94
Construct roundabout at Hwy 114/Hwy 27 intersection, replace culverts from I-94 to Hwy 55 near Lowry. Resurfacing takes place in 2026.
- Scheduled for construction in 2025-2026
Hwy 120/Century Avenue — Maplewood to Oakdale
This study identified issues, priorities and environmental concerns on Hwy 120 between I-94 in Maplewood and I-694 in Oakdale.
- Study completed
Hwy 120/Century Avenue — Mahtomedi to White Bear Lake
County led project on Hwy 120/Century Avenue between I-694 and Hwy 12/Wildwood Road to reconstruct Hwy 120/Century Avenue, building roundabouts at the south Century College entrance and the Hwy 12 intersections, improving accessibility for bike and pedestrians on both side of the road, updating transit stops and drainage work.
- Scheduled for construction in 2027-2028
Hwy 169 — Broadway to Union in St. Peter
Reconstruct Hwy 169 from Broadway Avenue to Union Street in St. Peter
- Scheduled for construction in 2028
Hwy 169 — Cross Range corridor study
Study of Highway 169 between Taconite to Pengilly to evaluate the existing corridor, conduct traffic analysis and provide alternative screenings.
- Study completed
Hwy 169 — Elmore
Reconstruct Hwy 169 in Elmore, from E. Polton St. to the Minnesota/Iowa border
- Scheduled for construction in 2028
Hwy 169 — Ely to Winton
3.7 miles of resurfacing done under traffic
- Scheduled for construction in 2026
Hwy 169 — Garrison
Resurface and improve five miles of Hwy 169 from south of Garrison at Crow Wing County Road 26 to north of Garrison at Pike Avenue; includes roundabout at Hwy 18, new storm sewer and sidewalk in Garrison.
- Scheduled for construction in 2026
Hwy 169 — Golden Valley to Brooklyn Park
A multi-modal study of Hwy 169 between the Hwy 55 crossing in Golden Valley and 101 Avenue North in Brooklyn Park.
- Study underway
Hwy 169 — Hibbing corridor study
Studying Hwy 169 corridor from Hwy 37 to 13th Street East
- Study completed
Hwy 169 — Itasca County safety audit
Study of Hwy 169 between Grand Rapids and Keewatin for future safety improvements
- Study underway
Hwy 169 — Mankato/North Mankato Revitalization
Reconstruct Hwy 169 from Riverfront Dr. to north of Hwy 14; construct a roundabout at Webster Ave.; construct a roundabout at N. River Ln.; repair three bridges
- Scheduled for construction in 2027-2028
Hwy 169 at Co. Rd. 4 — Zimmerman
Sherburne County to construct a new interchange at Hwy 169 and Co. Rd. 4 between 255th Ave. and 269th Ave. in Zimmerman. This partnership project includes local road and sidewalk improvements.
- Scheduled for construction in 2025-2026
Hwy 169 and Hwy 282/County Road 9 — Jordan
Construct new interchange at Hwy 169 and Hwy 282/County Road 9, build roundabouts at County Road 9 and Syndicate Street and 190th Street/Valley View Drive, build bridge over Union Pacific railroad tracks, build pedestrian tunnel, sidewalks, retaining walls, and noise walls.
- Scheduled for construction in 2025-2027
Hwy 194 — Central Entrance
Reconstruct Hwy 194/Central Entrance in Duluth from Trinity Road to Mesaba Avenue.
- Scheduled for construction in 2031
Hwy 194 — Mesaba Avenue Bridge
Bridge work on Michigan Street bridge over Mesaba and Mesaba avenue bridge over Superior Street
- Scheduled for construction in 2026
Hwy 197 — Bemidji
Reconstruct Highway 197 from Gillett Drive to Hannah Avenue
- Scheduled for construction in 2026-2027
Hwys 200-299
Hwy 210 — Brainerd
Improve the four-lane segment of Hwy 210/Washington St. from Baxter Dr. to Pine Shores Rd. in Brainerd, Crow Wing County; includes upgrades to the Mississippi River bridge and sidewalks.
- Scheduled for construction in 2026-2027
Hwy 210 — Crosby
Replace and update the 1943 Serpent Creek drainage structure beneath Hwy 210 which includes the water level control for Serpent Lake in Crosby.
- Scheduled for construction in 2028
Hwy 210 (Hwy 6) — Crosby to Deerwood
Resurface and update a three-mile segment of Hwy 210 from east of the Cuyuna Regional Medical Center in Crosby to east of Hwy 6 in Deerwood, and reconstruct the road between E Broadway and Ruggles Ave. in Deerwood.
- Scheduled for construction in 2029
Hwy 210 — Motley to Pillager
Install a new roundabout at the intersection of Hwy 210, River St. (S Co. Rd. 1) and 37th Ave. in Pillager; resurface 8.5 miles of road between Hwy 10 and River St. and replace box bridge west of Pillager, Cass County.
- Scheduled for construction in 2027
Hwy 210 and Hwy 371 — Baxter intersection
Develop, improve and construct a new intersection, includes railroad crossing. Corridors of Commerce funded project.
- Scheduled for development in 2024-2027
- Scheduled for construction in 2028-2029
Hwy 210 and Hwy 65 — McGregor
Construct a roundabout at the west intersection of Hwy 210 and Hwy 65.
- Scheduled for construction in 2027
Hwy 210 and I-94 — west junction
Replace bridge, reconstruct and realign ramp, construct roundabouts, improve bicycle and pedestrian access and mobility
- Scheduled for construction in 2026
Hwy 212 — Norwood Young America to Cologne
Carver County led project to expand segment of highway from two lanes to four lanes.
- Scheduled for construction in 2024-2026
Hwy 212 — Plato bridge replacements
Replace two bridges crossing Buffalo Creek on Hwy 212, 1.0 miles west of CR 9 in Plato.
- Scheduled for construction in 2025-2026
Hwy 212 — Brownton
Construct roundabout at the intersection of Hwy 212 and Hwy 15 near Brownton
- Scheduled for construction in 2026
Hwy 212 — Dahlgren Township
Repair soil settlement under a short stretch of eastbound Hwy 212 to remove a depression in the road.
- Scheduled for construction in 2026
Hwy 212 — Granite Falls bridge resurfacing
Resurfacing the Hwy 212 bridge, located 0.1 mile east of Hwy 23 in Granite Falls
- Scheduled for construction in 2026
Hwy 212 — Glencoe
Reconstruct pedestrian bridge crossing Hwy 212 in Glencoe
- Scheduled for construction in 2026
Hwy 212 — Norwood Young America and Young America Township
Build J-turns at the intersections of Hwy 212 and County Road 131, Wells Avenue, County Road 31 and West Railroad Street. The project also includes installation of cable median barrier.
- Scheduled for construction in 2026
Hwy 218 — Austin to Blooming Prairie
Resurface Hwy 218 north of Austin from I-90 to Mower Co. Rd. 36 south of Blooming Prairie.
- Scheduled for construction in 2027
Hwy 218 — Blooming Prairie
The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2025.
- Scheduled for construction in 2027
Hwy 243 — Franconia Township and Osceola
Designing the reconstruction of the Hwy 243/Osceola Bridge over the St. Croix National and Scenic Riverway, in partnership with the Wisconsin Department of Transportation (WisDOT).
- Scheduled for construction in 2026-2028
Hwy 250 — Lanesboro
Reconstructing Hwy 250 from the Hwy 250 bridge over the Root River to Hwy 16.
- Scheduled for construction in 2027
Hwy 252 and I-94 — environmental review
MnDOT, along with FHWA, Hennepin County and the cities of Brooklyn Center, Brooklyn Park and Minneapolis, are preparing an Environmental Impact Statement (EIS) for the Hwy 252/I-94 project. The project partners will address the purpose and need for the project in the EIS document and develop transportation alternatives.
- Environmental review underway
Hwy 280 — St. Paul to Roseville
Resurface Hwy 280 from I-94 to Hwy 36/I-35W, repair bridges, repair and resurface ramps, replace drainage and make additional improvements.
- Scheduled for construction in 2026 and 2028
Hwy 282/County Road 9 and Hwy 169 — Jordan
Construct new interchange at Hwy 169 and Hwy 282/County Road 9, build roundabouts at County Road 9 and Syndicate Street and 190th Street/Valley View Drive, build bridge over Union Pacific railroad tracks, build pedestrian tunnel, sidewalks, retaining walls, and noise walls.
- Scheduled for construction in 2025-2027
Hwys 300-694
Hwy 371 at Co. Rd. 29 — Nisswa, Pequot Lakes
Improve access and safety on Hwy 371 at Crow Wing Co. Rd. 29/Wilderness Rd. (Co. Rd. 107) in Nisswa and Pequot Lakes.
- Scheduled for construction in 2027
Hwy 371 — Nisswa to Baxter study
Identify needs and potential future improvements, develop recommendations for the corridor, and determine upcoming pavement and safety improvements.
- Study underway
Hwy 371 and Hwy 210 — Baxter intersection
Develop, improve and construct a new intersection, includes railroad crossing. Corridors of Commerce funded project.
- Scheduled for development in 2024-2027
- Scheduled for construction in 2028-2029
I-394 and I-94 — Minneapolis
Repairing bridges and ramps along I-394 and I-94 between downtown Minneapolis and the Penn Avenue bridge, realigning the I-394 to Dunwoody Boulevard ramp, replacing the deck for the Penn Avenue bridge that crosses over I-394, and other improvements along I-394 between Hwy 100 and I-94.
- Scheduled for construction in 2025-2026
I-394 ramps at Plymouth Road and Ridgedale Drive — Minnetonka
Sidewalk improvements and replacing traffic signals that include accessibility improvements. The work will take place at the Plymouth Road exit and entrance ramps for westbound I-394, Ridgedale Drive exit ramp from westbound I-394 and at the exit and entrance ramps for eastbound I-394.
- Scheduled for construction in 2026
I-394 — St. Louis Park
Extend and add acceleration/deceleration lanes, remove free right turn lanes, replace signal systems, realign retaining wall, replace sidewalk and add accessible curb ramps on I-394 between Pennsylvania Avenue and Dakota Avenue in St. Louis Park.
- Scheduled for construction in 2025-2026
I-494 — Bloomington to Mendota Heights/Eagan
Repair work on the I-494 bridge over the Minnesota River and improve drainage.
- Scheduled for construction in 2023-2026
I-494 — Edina to Richfield
Construct E-ZPass lanes on I-494 from Hwy 100 to I-35W, add a new ramp at the I-35W and I-494 interchange, replace the bridges crossing over I-494 at Portland Ave., Nicollet Ave., and 12th Ave., and add a new pedestrian bridge at Chicago Ave. that crosses over I-494.
- Scheduled for construction in 2023-2026
I-535 — Blatnik Bridge
Replacement of the Blatnik Bridge between Duluth, Minn., and Superior, Wis.
- Scheduled for construction in 2028
I-694 at Hwy 61 — Maplewood
Build a dual left turn lane for northbound Hwy 61 to westbound I-694 and replace the signal system at the Hwy 61 interchange.
- Scheduled for construction in 2027
A to Z
Bridges over I-35E and I-94 — St. Paul
Repairing and painting bridges over I-94 and I-35E in St. Paul
- Scheduled for construction in 2025-2026
Cedar Lake Road and Jordan Avenue near Hwy 169 — Minnetonka to St. Louis Park
Repave Jordan Avenue South and Cedar Lake Road near Hwy 169, make sidewalk improvements, upgrade storm sewers and replace signals.
- Scheduled for construction in 2026
Concrete pavement restoration — multiple locations
Improve various roads in southeast Minnesota.
- Scheduled for construction in 2025-2026
Fort Road roundabouts — Nicollet County
Construct a roundabout at two intersections with Nicollet Co. Rd. 5 (Fort Road) - Hwy 15/Fort Road and Hwy 111/Fort Road.
- Scheduled for construction in 2026
John Ireland Boulevard bridge — St. Paul
Crews will be making improvements to the John Ireland Boulevard bridge over I-94 between Kellogg Boulevard and Rice Street in St. Paul. This project includes a careful disassembly and rebuild of the structure of the bridge, and other safety and cosmetic changes, including sidewalk repairs, updates to existing bike and pedestrian facilities, accessibility updates, and railing replacements.
- Scheduled for construction in 2025-2026
Mahnomen Railroad Grade Separation Study
A railroad grade separation feasibility study in Mahnomen conducted by MnDOT and the White Earth Tribal Nation
- Study underway
Nicollet Avenue bridge over I-94 — Minneapolis
Replacing the Nicollet Avenue bridge that crosses over I-94 near downtown Minneapolis, adding accessible sidewalk ramps and new crosswalks on north and south sides of bridge.
- Scheduled for construction in 2027
Northern Red River Valley Flood Study
The North Dakota Department of Transportation is working in partnership with MnDOT and the United States Army Corps of Engineers to gain a better understanding of what can be done to improve transportation in the Northern Red River Valley during flooding events, from approximately Grand Forks, ND to the Canadian border.
- Study underway
Red River Valley Bridges
This project is led by North Dakota Department of Transportation and includes bridge rehabilitation work on Hwy 171, Hwy 175 and Hwy 2B.
- Scheduled for construction in 2026
Sibley Memorial Hwy at Hwy 13 — Mendota Heights
Repave Sibley Memorial Hwy from the south intersection with Hwy 13/Mendota Heights Rd. to the north intersection with Hwy 13/Great River Rd., improve pedestrian ramps and accessibility, and drainage updates.
- Scheduled for construction in 2026
Stillwater Lift Bridge — Stillwater
Replace the electrical cable that controls the lift section of the bridge
- Scheduled for construction in 2026
Tribal safety boundaries
MnDOT and the White Earth Tribal Nation, is completing a comprehensive evaluation of the tribal transportation network within the Tribal Safety Boundaries
- Study underway
Urban freight perspectives study — Metro district
The Urban Freight Perspectives study focused on enhancing freight mobility in MnDOT’s Metro District by improving communication with freight stakeholders and integrating freight considerations into the district’s project development process.
- Study completed
Veterans Memorial Bridge and Interchange
Repair Veterans Memorial Bridge and the bridge over Hwy 169; replace signals and pavement at the interchange of Hwy 169 and Belgrade Ave./Mulberry St. in the cities of North Mankato and Mankato.
- Scheduled for construction in 2026
Virginia headquarters reconstruction
Replace the truck station and replace outbuilding.
- Scheduled for construction in 2025-2027
White Earth Nation Safety Planning Study
MnDOT, in partnership with the White Earth Tribal Nation, is completing a comprehensive evaluation of the tribal transportation network within the Tribal Safety Boundaries. This includes all roads within the Tribal Boundary, including State, County, Municipal, Township, Tribal, and other publicly owned roads.
- Study completed